COMMERCIAL COMPLEX CUM OFFICE HALL, KACHNA
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Shri Ram Nagar
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Shri Ram Nagar — 0.63 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Shri Ram Nagar. Only parameters with available data are shown below. Based on the latest readings for Shri Ram Nagar.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 19.6 µg/m³ | ≤ 40 |
Good
|
| PM10 | 70.2 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 28.1 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 361 ppm | ≤ 500 |
Good
|
| Fluoride | 0.59 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 3.6 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 45% | ≥ 80% |
Concern
|
| Drainage Coverage | 58% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 60.2% | 40-70% |
Contextual
|
| Impervious Surface | 24.0% | < 70% |
Good
|
| NDVI Mean | 0.270 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 68.7% | 51.8% | 60.2% |
| Tree Cover % | 12.9% | 18.9% | 15.9% |
| Urbanization Index | 100.0 | 100.0 | 100.0 |
| Infra Score | 78.8 | 77.2 | 80.0 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 3 | ≥3 |
Good
|
| Markets (1km) | 5 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.259 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 27.6% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 13.7% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 0 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.255 | 0.262 | 0.259 |
| Vegetation % | 21.1% | 34.1% | 27.6% |
| Dense Green % | 11.3% | 16.0% | 13.7% |
| Tree Canopy % | 18.8% | 15.4% | 17.1% |
| Green Score | 31.3 | 37.6 | 34.5 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 48.7 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 43.8 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 1,231 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | High | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 29.0°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 63.9 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 29.0 | 29.0 | 29.0 |
| LST Min (°C) | 2.4 | 4.6 | 3.5 |
| LST Max (°C) | 39.8 | 39.9 | 39.9 |
| LST Score | 64.0 | 63.8 | 63.9 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 60.2% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 39.8% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 68.7% | 51.8% | 60.2% |
| Open Space % | 31.3% | 48.3% | 39.8% |
| Built-up Score | 31.3 | 48.3 | 39.8 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 24.36 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 48.7 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 24.84 | 23.88 | 24.36 |
| Max Radiance | 43.59 | 37.54 | 40.57 |
| NTL Score | 49.7 | 47.8 | 48.7 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 66.76% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 96.97% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 64.25% | 69.26% | 66.76% |
| Seasonal Water % | 96.25% | 97.68% | 96.97% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 5,778.8 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 71.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 20,709 | 140,401 | 80,555 |
| Density / km² | 6,591.8 | 4,965.7 | 5,778.8 |
| Pop Density Score | 67.0 | 75.2 | 71.1 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 134.688 | 30% weight |
Scaled
|
| Recharge | 2.59 | 25% weight |
Scaled
|
| PDSI | 3.08 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,865.50 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 134.642 | 134.733 | 134.688 |
| Recharge Estimate | 3.10 | 2.07 | 2.59 |
| PDSI | 3.10 | 3.06 | 3.08 |
| Groundwater Score | 63.9 | 63.8 | 63.9 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 52.9 | < 40 |
Concern
|
| Avg Slope | 2.89° | > 1° |
Good
|
| Avg Impervious | 40.4% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,246 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Infrastructure | Summer Load Shedding | 0 m / Low | Scheduled power cuts during peak summer demand |
| Water_drainage | Entrance Road Ponding | 100 m / Low | Colony entrance road develops water ponding during rains |
| Accessibility | Auto Stand Distant | 800 m / Low | Nearest auto-rickshaw stand 800m walk from colony interior |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| ATAL VIHAR YOJNA AT BHURKONI 35 MIG, 196 LIG, 114 EWS Total 345 Independent Houses & Development wor | PCGRERA121224001860 | New | Raipur | Residential Development |
| ATAL VIHAR YOJNA AT KOHKA, TILDA 07 Sr. MIG, 33 MIG, 05 MIG-I, 15 MIG-II, 183 LIG, 41 LIG-I, 116 EWS | PCGRERA201125001998 | New | Raipur | Residential Development |
| construction of 48 independent houses and 101 ews at dharampura ,raipur | PCGRERA210622001442 | New | Raipur | Residential Development |
| CONSTRUCTION OF COMMERCIAL COMPLEX AT SARDAR VALLB | PCGRERA290520001114 | Ongoing | Raipur | Commercial Development |
| CONSTRUCTION OF SHOPING COMPLEX PHASE-2 WHOLE SALE MARKET DUMARTARAI | PCGRERA280222001347 | New | Raipur | Commercial Development |
| GENERAL HOUSING SCHEME NARDAHA | PCGRERA040718000441 | Ongoing | Raipur | Mixed Development |
| GENERAL HOUSING SCHEME, dumartarai phase-01 | PCGRERA130718000529 | Ongoing | Raipur | Residential Development |
| GREEN VILLEY CITY BORIYAKALA | PCGRERA040718000439 | Ongoing | Raipur | Mixed Development |
| HIMALaya HEIGHT PHASE-2 | PCGRERA040718000438 | Ongoing | Raipur | Mixed Development |
| OFFICE CUM RESIDENTIAL COMPLEX | PCGRERA290818000731 | New | Raipur | Mixed Development |
| pirda site a | PCGRERA211218000881 | Ongoing | Raipur | Residential Development |
| PIRDA SITE B | PCGRERA201218000880 | Ongoing | Raipur | Residential Development |
| PIRDA SITE C | PCGRERA201218000878 | Ongoing | Raipur | Residential Development |
| PIRDA SITE D | PCGRERA201218000879 | Ongoing | Raipur | Residential Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA040718000440
- Status
- Ongoing
- Project Type
- Mixed Development
- Approved Date
- 04 Jul 2018
- Original End Date
- 31 May 2021
- EWS Category
- NO
- Proposed Completion
- 30 Nov 2021
- Authorised Person
- EXECUTIVE ENGINEER
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | CA ALOK KUMAR AGRAWAL | 413331 |
Buildings & Units
Inventory overview, sold/unsold breakdown, and building details.
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2018-07-04 – 2018-09-30 | 0 | 0 | 0 | 0 | 0 |
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2018-07-04 – 2018-09-30 | 30 | 30 | 0 | 0 | 0 |
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2018-07-04 – 2018-09-30 | 213 | 170 | 6 | 37 | 0 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - KACHNA, RAIPUR (C.G.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2562001, 81.6786947 View on Map
Livability of Shri Ram Nagar Raipur
Environmental, infrastructure & amenity parameters for the area where this project is located (0.63 km from project). Each value is compared with the Raipur average.
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | SRISHTIS IMPERIA PHASE IV | Raipur | New | 0.24 km |
| 2 | Sanman Homz | Raipur | New | 0.31 km |
| 3 | RAMAYAN LIFE STYLE RESIDENCY | Raipur | Ongoing | 0.35 km |
| 4 | srishtis imperia phase-1 | Raipur | New | 0.36 km |
| 5 | VIP - avenue , VIP ESTATE | Raipur | New | 0.46 km |
| 6 | green glory | Raipur | Ongoing | 0.51 km |
| 7 | shri krishna vatika | Raipur | New | 0.53 km |
| 8 | the address | Raipur | New | 0.57 km |
| 9 | sai simran bhawna nagar | Raipur | Ongoing | 0.59 km |
| 10 | ONYX- 18 | Raipur | New | 0.64 km |
| 11 | BANYAN TREE ENCLAVE | Raipur | Ongoing | 0.69 km |
| 12 | aura-the residences (phase-i) | Raipur | Ongoing | 0.72 km |
| 13 | ARYA'S VIP CUBE | Raipur | Ongoing | 0.76 km |
| 14 | ASHOKA ROYAL - C | Raipur | Ongoing | 0.76 km |
| 15 | high park phase - 2 | Raipur | New | 0.82 km |
| 16 | METRO HEXA | Raipur | New | 0.84 km |
| 17 | bhardwaj sky | Raipur | New | 0.84 km |
| 18 | AGRASAR PRIDE | Raipur | Ongoing | 0.86 km |
| 19 | A.T. CLASSIC | Raipur | Ongoing | 0.87 km |
| 20 | SAMRIDDHI ALTUS | Raipur | New | 0.88 km |
| 21 | Samriddhi atlantis | Raipur | New | 0.89 km |
| 22 | high park phase- i | Raipur | New | 0.89 km |
| 23 | ASHOKA KOHINOOR PHASE - 2 | Raipur | Ongoing | 0.92 km |
| 24 | SURYODAYA WONDER 16 | Raipur | New | 0.93 km |
| 25 | Bhardwaj sky phase ii | Raipur | New | 0.93 km |
| 26 | SAMRIDDHI ATLANTIS PHASE-2 | Raipur | New | 0.94 km |
| 27 | SWASTIK EAST - 12 | Raipur | Ongoing | 0.95 km |
| 28 | SAMPOORNA HOMES (PHASE-I) | Raipur | New | 0.96 km |
| 29 | ASHOKA IKON PHASE - 2 | Raipur | Ongoing | 1.00 km |
| 30 | ADITYA HEIGHTS | Raipur | Ongoing | 1.03 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA040718000440
-
Approved Building / Sanction Plan AvailableBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.41 kmHeerapur Talab ≤3 kmPond · 50m buffer
-
1.54 kmKharun Left Bank Canal ≤3 kmCanal · 20m buffer
-
2.42 kmTelibandha Nala ≤3 kmNala · 20m buffer
-
2.55 kmKharun River ≤3 kmRiver · 75m buffer
-
2.8 kmTelibandha Talab (Marine Drive) ≤3 kmLake · 50m buffer
-
2.83 kmMuktangan Talab ≤3 kmTank · 50m buffer
-
3.44 kmBoriyakhurd Talab 3–5 kmTank · 50m buffer
-
3.53 kmKendri Talab 3–5 kmTank · 50m buffer
-
1.68 kmSLRM Centre Tendua (Tundra) ≤3 kmWaste processing · 200m buffer
-
2.32 kmDaldal Seoni MSW Transfer Station ≤3 kmTransfer station · 100m buffer
Documents
RERA-filed documents and disclosures available for this project.
APARTMENTPHOTO (14)
ARCH (2)
AminitiesPHOTO (14)
BOROUCHRE (2)
BRIEF (1)
BUILDING (1)
BUILDINGPHOTO (12)
CA (3)
COLONIZER (1)
COM (4)
ENGG (2)
ENUM (1)
FEESHEET (1)
LAYOUT (1)
PASSBOOK (1)
PHOTO (1)
PSPEC (1)
Reg (1)
SEARCH (1)
SELF (1)
TAC (1)
other (5)
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!