RALAS ENCLAVE
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Dagania
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Dagania — 0.52 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Dagania. Only parameters with available data are shown below. Based on the latest readings for Dagania.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 24.5 µg/m³ | ≤ 40 |
Good
|
| PM10 | 256.2 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.8 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 431 ppm | ≤ 500 |
Good
|
| Fluoride | 0.86 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 7.7 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF | ODF++ |
Info
|
| Sewage Coverage | 20% | ≥ 80% |
Concern
|
| Drainage Coverage | 28% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 68.8% | 40-70% |
Contextual
|
| Impervious Surface | 41.0% | < 70% |
Good
|
| NDVI Mean | 0.250 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 79.2% | 58.4% | 68.8% |
| Tree Cover % | 13.6% | 14.7% | 14.1% |
| Urbanization Index | 100.0 | 99.1 | 99.5 |
| Infra Score | 80.1 | 79.8 | 80.8 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 3 | ≥1 |
Good
|
| Schools (1km) | 5 | ≥3 |
Good
|
| Markets (1km) | 9 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.222 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 26.3% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 11.6% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 3 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.177 | 0.266 | 0.222 |
| Vegetation % | 26.9% | 25.7% | 26.3% |
| Dense Green % | 11.5% | 11.7% | 11.6% |
| Tree Canopy % | 14.8% | 9.9% | 12.3% |
| Green Score | 36.7 | 43.6 | 40.2 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 45.7 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 42.7 dB | ≤ 45.0 dB |
Good
|
| Nearest Highway | 1,437 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Medium | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | Medium | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.4°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 58.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.5 | 30.3 | 30.4 |
| LST Min (°C) | 23.3 | 20.5 | 21.9 |
| LST Max (°C) | 40.2 | 39.3 | 39.8 |
| LST Score | 58.2 | 58.9 | 58.6 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 68.8% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 31.2% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 79.2% | 58.4% | 68.8% |
| Open Space % | 20.8% | 41.6% | 31.2% |
| Built-up Score | 20.8 | 41.6 | 31.2 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 23.20 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 46.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 24.52 | 21.88 | 23.20 |
| Max Radiance | 37.57 | 34.17 | 35.87 |
| NTL Score | 49.0 | 43.8 | 46.4 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 63.30% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 94.42% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 69.42% | 57.18% | 63.30% |
| Seasonal Water % | 92.12% | 96.72% | 94.42% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 7,081.1 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 64.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 26,229 | 164,364 | 95,297 |
| Density / km² | 8,349.0 | 5,813.2 | 7,081.1 |
| Pop Density Score | 58.3 | 70.9 | 64.6 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 131.279 | 30% weight |
Scaled
|
| Recharge | 1.52 | 25% weight |
Scaled
|
| PDSI | 2.94 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,875.94 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 131.025 | 131.532 | 131.279 |
| Recharge Estimate | 1.60 | 1.44 | 1.52 |
| PDSI | 2.93 | 2.96 | 2.94 |
| Groundwater Score | 62.9 | 63.0 | 63.0 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 54.6 | < 40 |
Concern
|
| Avg Slope | 2.87° | > 1° |
Good
|
| Avg Impervious | 90.4% | < 70% |
Concern
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 9 | ≥ 5 |
Good
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA160718000556
- Status
- Ongoing
- Project Type
- Mixed Development
- Approved Date
- 16 Jul 2018
- Original End Date
- 31 Dec 2018
- EWS Category
- NO
- Construction Cost
- ₹ 255970000
- Land Cost
- ₹ 78633000
- Proposed Completion
- 31 Dec 2018
- Authorised Person
- ROHIT SINGHANIA
- Website
- www.ralas.in
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | Praveen Jain | 414739 |
| Quarterly CA | Prabhat Prasan Deshlahra | 142485 |
| Engineer | Sanjay Gupta | 638 |
| Architect | Devesh Rathod | CA/2007/39610 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - DAGANIYA, RAIPUR (C.G.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2393849, 81.6040675 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | PIC heightS | Raipur | Ongoing | 0.59 km |
| 2 | chhugani pride phase - 2 | Raipur | New | 1.19 km |
| 3 | KALPTARU CASITA | Raipur | New | 1.49 km |
| 4 | PARK AVENUE | Raipur | New | 1.60 km |
| 5 | HARSHIT URBAN CITY | Raipur | New | 1.67 km |
| 6 | CREST GREENS | Raipur | Ongoing | 1.81 km |
| 7 | PMAY OF 576 DUS VILLAGE -KOTA CHIRHULDIH , - RAIPUR | Raipur | Ongoing | 1.93 km |
| 8 | pmay of 280(dus) at kata chirhuldih ,raipur | Raipur | Ongoing | 2.08 km |
| 9 | TDS-01 INDRAPRASTH PHASE -2 | Raipur | Ongoing | 2.13 km |
| 10 | GULMOHAR PARK | Raipur | Ongoing | 2.18 km |
| 11 | TIRUPATI ENCLAVE PHASE -I | Raipur | Ongoing | 2.30 km |
| 12 | TIRUPATI ENCLAVE COMMERCIAL | Raipur | Ongoing | 2.31 km |
| 13 | ishaan heightS | Raipur | New | 2.32 km |
| 14 | MANJEET SMART HOMES | Raipur | New | 2.32 km |
| 15 | life style empressa | Raipur | Ongoing | 2.32 km |
| 16 | TIRUPATI ENCLAVE PHASE-03 | Raipur | New | 2.33 km |
| 17 | ASK GRANDIOSE | Raipur | New | 2.35 km |
| 18 | maruti life style tower | Raipur | New | 2.40 km |
| 19 | SANTI ENCLAVE | Raipur | Ongoing | 2.41 km |
| 20 | TIRUPATI ENCLAVE PHASE- II | Raipur | Ongoing | 2.41 km |
| 21 | kanchan vihar phase -ii | Raipur | Ongoing | 2.44 km |
| 22 | admire green phase- 1 | Raipur | New | 2.44 km |
| 23 | DREAM CITY | Dhamtari | New | 2.46 km |
| 24 | KANCHAN VIHAR PHASE - I | Raipur | Ongoing | 2.46 km |
| 25 | GOLDEN ARCADE | Raipur | Ongoing | 2.47 km |
| 26 | ASK PARADISE | Raipur | Ongoing | 2.47 km |
| 27 | ask business triangle (abt) | Raipur | New | 2.50 km |
| 28 | ARIHANT NAGAR | Raipur | Ongoing | 2.51 km |
| 29 | saheb society | Raipur | Ongoing | 2.51 km |
| 30 | SHIVLOK HEIGHTS | Raipur | New | 2.55 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA160718000556
-
Promoter Registration Certificate AvailableBuilder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.2 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
1.21 kmKharun Right Bank Canal ≤3 kmCanal · 20m buffer
-
1.66 kmBhatagaon Nala ≤3 kmNala · 20m buffer
-
2.37 kmDevpuri Nala ≤3 kmNala · 20m buffer
-
2.78 kmGudhiyari Nala ≤3 kmNala · 20m buffer
-
3 kmSerikhedi Talab ≤3 kmTank · 50m buffer
-
3.11 kmBudha Talab (Vivekananda Sarovar) 3–5 kmLake · 50m buffer
-
3.17 kmKankali Talab 3–5 kmTank · 50m buffer
-
3.22 kmMathpurena Wetland 3–5 kmWetland · 75m buffer
-
2.72 kmGudhiyari Old Dump Site ≤3 kmLegacy dump · 500m buffer
-
3.01 kmOld Raipur Trenching Ground 3–5 kmInactive landfill · 500m buffer
-
4.59 kmBhanpuri-Rawabhata Legacy Dump 3–5 kmLegacy dump · 500m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!