KRISHNA'S PARADISE PHASE - II
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Sarona
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Sarona — 0.99 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Sarona. Only parameters with available data are shown below. Based on the latest readings for Sarona.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 22.8 µg/m³ | ≤ 40 |
Good
|
| PM10 | 76.2 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.7 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 352 ppm | ≤ 500 |
Good
|
| Fluoride | 0.91 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 6.9 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF | ODF++ |
Info
|
| Sewage Coverage | 18% | ≥ 80% |
Concern
|
| Drainage Coverage | 28% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 35.0% | 40-70% |
Contextual
|
| Impervious Surface | 23.6% | < 70% |
Good
|
| NDVI Mean | 0.290 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 32.6% | 37.4% | 35.0% |
| Tree Cover % | 14.0% | 19.4% | 16.7% |
| Urbanization Index | 100.0 | 84.7 | 92.3 |
| Infra Score | 65.3 | 66.8 | 66.0 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 5 | ≥3 |
Good
|
| Markets (1km) | 2 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.243 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 21.2% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 12.7% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 2 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.243 | 0.243 | 0.243 |
| Vegetation % | 22.6% | 19.8% | 21.2% |
| Dense Green % | 9.9% | 15.5% | 12.7% |
| Tree Canopy % | 10.2% | 20.0% | 15.1% |
| Green Score | 36.8 | 38.2 | 37.5 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 51.8 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 43.3 dB | ≤ 45.0 dB |
Good
|
| Nearest Highway | 340 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Low-Medium | Low preferred |
Info
|
| River Flood Risk | Low-Medium | Low preferred |
Info
|
| Waterlogging Risk | Low | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.0°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 59.9 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.0 | 30.1 | 30.0 |
| LST Min (°C) | 20.6 | 16.9 | 18.8 |
| LST Max (°C) | 40.0 | 39.8 | 39.9 |
| LST Score | 60.1 | 59.8 | 59.9 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 35.0% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 65.0% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 32.6% | 37.4% | 35.0% |
| Open Space % | 67.4% | 62.6% | 65.0% |
| Built-up Score | 67.4 | 62.6 | 65.0 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 16.91 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 33.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 18.17 | 15.65 | 16.91 |
| Max Radiance | 26.69 | 24.26 | 25.47 |
| NTL Score | 36.3 | 31.3 | 33.8 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 50.45% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 95.76% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 56.74% | 44.15% | 50.45% |
| Seasonal Water % | 96.67% | 94.84% | 95.76% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 3,491.6 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 82.5 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 10,126 | 106,307 | 58,217 |
| Density / km² | 3,223.3 | 3,759.8 | 3,491.6 |
| Pop Density Score | 83.9 | 81.2 | 82.5 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 130.432 | 30% weight |
Scaled
|
| Recharge | 2.98 | 25% weight |
Scaled
|
| PDSI | 3.02 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,874.19 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 130.464 | 130.399 | 130.432 |
| Recharge Estimate | 2.93 | 3.04 | 2.98 |
| PDSI | 3.02 | 3.02 | 3.02 |
| Groundwater Score | 63.1 | 63.1 | 63.1 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 49.2 | < 40 |
Concern
|
| Avg Slope | 2.57° | > 1° |
Good
|
| Avg Impervious | 7.7% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 941 m | ≤ 2000m |
Context
|
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| KRISHNA'S PARADISE-PHASE-I | PCGRERA250518000016 | Ongoing | Raipur | Residential Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA270918000784
- Status
- Ongoing
- Project Type
- Residential Development
- Approved Date
- 27 Sep 2018
- Original End Date
- 31 Dec 2025
- EWS Category
- NO
- Construction Cost
- ₹ 86628000
- Land Cost
- ₹ 4510000
- Proposed Completion
- 30 Sep 2026
- Authorised Person
- SUNIL KUMAR TAPARIA
- Website
- www.shreekrishnabuilder.com
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | SHWETA AGRAWAL | 421626 |
| Quarterly CA | PAWAN KUMAR BAID | 404855 |
| Engineer | G.V.UDAI | 276 |
| Architect | J.P. KESHWANI | COA/98/23904 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - SARONA, SANT RAVIDAS WARD NO. 70, RAIPUR (C.G.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2410604, 81.5744340 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | WALLFORT ALANCIA | Raipur | New | 0.18 km |
| 2 | WALLFORT ALANCIA | Raipur | Ongoing | 0.21 km |
| 3 | WALLFORT SAPPHIRE | Raipur | Ongoing | 0.83 km |
| 4 | PARTHIVI PROVINCE SARONA | Raipur | Ongoing | 0.94 km |
| 5 | ARIHANT NAGAR | Raipur | Ongoing | 0.95 km |
| 6 | TDS-01 INDRAPRASTH PHASE -2 | Raipur | Ongoing | 1.43 km |
| 7 | TIRUPATI ENCLAVE PHASE -I | Raipur | Ongoing | 1.63 km |
| 8 | TIRUPATI ENCLAVE COMMERCIAL | Raipur | Ongoing | 1.65 km |
| 9 | TIRUPATI ENCLAVE PHASE-03 | Raipur | New | 1.66 km |
| 10 | SHRI RAM LOTUS VALLEY | Raipur | Ongoing | 1.67 km |
| 11 | TIRUPATI ENCLAVE PHASE- II | Raipur | Ongoing | 1.74 km |
| 12 | kanchan vihar phase -ii | Raipur | Ongoing | 1.78 km |
| 13 | KANCHAN VIHAR PHASE - I | Raipur | Ongoing | 1.81 km |
| 14 | HARSHIT URBAN CITY | Raipur | New | 1.83 km |
| 15 | suryoday enclave | Raipur | New | 1.90 km |
| 16 | PARTHIVI PACIFIC-ROYAL WOODS | Raipur | Ongoing | 1.97 km |
| 17 | SHRI RAM TOWERS | Raipur | Ongoing | 1.97 km |
| 18 | R EMINENCE MALL | Raipur | Ongoing | 2.09 km |
| 19 | fortune residency | Raipur | New | 2.30 km |
| 20 | multi sports city | Durg | New | 2.35 km |
| 21 | govinda green | Raipur | New | 2.37 km |
| 22 | PIC heightS | Raipur | Ongoing | 2.49 km |
| 23 | ishaan heightS | Raipur | New | 2.56 km |
| 24 | ARYAPOLIS | Raipur | Ongoing | 2.57 km |
| 25 | PARK AVENUE | Raipur | New | 2.64 km |
| 26 | maruti life style tower | Raipur | New | 2.77 km |
| 27 | URBAN ESTATE | Raipur | New | 2.78 km |
| 28 | life style empressa | Raipur | Ongoing | 2.81 km |
| 29 | sun city | Raipur | Ongoing | 2.81 km |
| 30 | Avinash pride | Raipur | New | 2.89 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA270918000784
-
Approved Building / Sanction Plan AvailableBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
3.27 kmUrla Talab 3–5 kmTank · 50m buffer
-
3.41 kmSerikhedi Talab 3–5 kmTank · 50m buffer
-
3.8 kmKumhari Talab 3–5 kmTank · 50m buffer
-
3.89 kmKharun Right Bank Canal 3–5 kmCanal · 20m buffer
-
4.69 kmGudhiyari Nala 3–5 kmNala · 20m buffer
-
4.73 kmBhatagaon Nala 3–5 kmNala · 20m buffer
-
0.64 kmOld Raipur Trenching Ground ≤3 kmInactive landfill · 500m buffer
-
1.64 kmBhanpuri-Rawabhata Legacy Dump ≤3 kmLegacy dump · 500m buffer
-
2.48 kmSarora Trenching Ground ≤3 kmActive landfill · 500m buffer
-
2.65 kmGudhiyari Old Dump Site ≤3 kmLegacy dump · 500m buffer
-
2.72 kmSarora Composting / Bio-methanation Plant ≤3 kmWaste processing · 200m buffer
-
3.83 kmJarway Transfer Station 3–5 kmTransfer station · 100m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!