Home / RERA Projects / GOKUL TOWER
ONGOING Residential Development RERA Page Project Website

GOKUL TOWER

Compliance Status
Partial Compliance
21.2705, 81.6104 Explore area
District
Raipur
Area
Promoter
CHHAGAN LAL PATEL
Project Information
Promoter CHHAGAN LAL PATEL
Type Residential Development
Status Ongoing
Completion 30 Jun 2018
Registered 05 Jun 2018
Original End 30 Jun 2018
EWS Category NO
Construction Cost ₹ 60102877
Land Cost ₹ 23063814
Authorised Person BHAVESH PATEL
Address GOGAON RAIPUR CHHATTISGARH
At a Glance
-
Total Units
-
Units Sold
-
Unsold
1
Legal Cases
Jun 2018
Target Completion
100%
Completion
Project Professionals
PRADEEP KUMAR JAIN
STATUTORY CA
JAYANT BHURA
QUARTERLY CA
Project Analysis

360° Project Intelligence

Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.

Area Livability

Livability of Rawan

Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Rawan — 0.00 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.



🏠 Livability Parameters

Latest readings for Rawan. Only parameters with available data are shown below. Based on the latest readings for Rawan.

C
Composite Score
50.6 /100
Average

🌬️ Air Quality

Final Score: 93.2/100 ↑ Higher is Better
ℹ️ What is Air Quality?AQI summarizes PM2.5, PM10 and gases. Lower pollution values improve public health outcomes.
AQI
67
Satisfactory
PM2.5
25.1 µg/m³
≤ 40
PM10
122.7 µg/m³
≤ 60
Scoring Breakdown
ParameterValueTarget / RuleStatus
PM2.5 25.1 µg/m³ ≤ 40
Good
PM10 122.7 µg/m³ ≤ 60
Concern
NO₂ 22.5 µg/m³ ≤ 40
Good
💡 What does this mean for you?Cleaner air lowers respiratory burden and improves outdoor comfort.

💧 Water Quality

Final Score: 69.5/100 ↑ Higher is Better
ℹ️ What is Water Quality?Water quality combines chemistry, supply duration and contamination markers.
TDS
422 ppm
≤ 500
pH
7.24
6.5–8.5
Supply
6.5 hr/day
≥ 8 hr
Scoring Breakdown
ParameterValueTarget / RuleStatus
TDS 422 ppm ≤ 500
Good
Fluoride 0.71 mg/L ≤ 1.0
Good
Turbidity 3.2 NTU ≤ 1
Concern
💡 What does this mean for you?Better supply quality and consistency reduces dependence on tanker/groundwater fallback.

🧹 Sanitation

Final Score: 26.5/100 ↑ Higher is Better
ℹ️ What is Sanitation?Sanitation reflects ODF status, sewage treatment and waste management regularity.
ODF
ODF
ODF++
Sewage Coverage
15%
≥ 80%
Drainage
22%
≥ 90%
Scoring Breakdown
ParameterValueTarget / RuleStatus
ODF Status ODF ODF++
Info
Sewage Coverage 15% ≥ 80%
Concern
Drainage Coverage 22% ≥ 90%
Concern
💡 What does this mean for you?Higher sanitation maturity lowers disease exposure and neighborhood nuisance.

🛣️ Infrastructure

Final Score: 78.2/100 ↑ Higher is Better
ℹ️ What is Infrastructure?Infrastructure score combines land use, urbanization, built form, night lights and terrain indicators.
Built-up
62.7%
Balanced band
Tree Cover
10.8%
≥ 15%
Urbanization
99.8
Higher better
Scoring Breakdown
ParameterValueTarget / RuleStatus
Built-up (LULC) 62.7% 40-70%
Contextual
Impervious Surface 49.9% < 70%
Good
NDVI Mean 0.220 > 0.3
Concern
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Built-up (LULC) % 65.6% 59.8% 62.7%
Tree Cover % 10.3% 11.3% 10.8%
Urbanization Index 100.0 99.7 99.8
Infra Score 76.7 79.7 78.2
💡 What does this mean for you?Balanced built + green mix usually improves long-term livability resilience.

🏥 Amenities

Final Score: 73.8/100 ↑ Higher is Better
ℹ️ What is Amenities?Amenity score captures daily-access services in walk/short-drive radii.
Hospitals 500m
1
Target ≥1
Schools 1km
4
Target ≥3
Parks 500m
0
Target ≥1
Scoring Breakdown
ParameterValueTarget / RuleStatus
Hospitals (500m) 1 ≥1
Good
Schools (1km) 4 ≥3
Good
Markets (1km) 7 ≥1
Good
💡 What does this mean for you?Higher local amenity density improves convenience and walkability.

🌳 Green Cover

Final Score: 26.7/100 ↑ Higher is Better
ℹ️ What is Green Cover?NDVI and vegetation structure are measured from satellite imagery to estimate neighborhood greenery.
NDVI Mean
0.193
Greenness index
Vegetation
21.5%
% green pixels
Dense Green
10.2%
Thick canopy
Scoring Breakdown
ParameterValueTarget / RuleStatus
NDVI Mean 0.193 0.5 maps to score 100
Weighted 40%
Vegetation % 21.5% Direct % (cap 100)
Weighted 30%
Dense Green % 10.2% Scaled from 50%
Weighted 20%
Parks within 500m 0 Count * 33 (cap 100)
Weighted 10%
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
NDVI Mean 0.189 0.197 0.193
Vegetation % 22.3% 20.7% 21.5%
Dense Green % 8.4% 11.9% 10.2%
Tree Canopy % 14.5% 12.7% 13.6%
Green Score 25.2 26.7 25.9
💡 What does this mean for you?Higher green metrics typically reduce heat stress and improve comfort.

🔊 Noise

Final Score: 33.9/100 ↑ Higher is Better
ℹ️ What is Noise?Noise uses measured day/night dB compared to CPCB zone limits.
Day dB
52.2
vs CPCB day limit
Night dB
43.1
vs CPCB night limit
Zone
CPCB class
Scoring Breakdown
ParameterValueTarget / RuleStatus
Day Noise 52.2 dB ≤ 55.0 dB
Good
Night Noise 43.1 dB ≤ 45.0 dB
Good
Nearest Highway 655 m Higher usually quieter
Info
💡 What does this mean for you?Chronic high noise impacts stress, sleep quality and perceived comfort.

🌊 Flood Risk

Final Score: 40.0/100 ↑ Higher is Better
ℹ️ What is Flood Risk?Flood risk combines river exposure and local waterlogging vulnerability.
Overall Risk
Medium
Lower is safer
River Risk
Medium
Lower is safer
Waterlogging
Medium
Lower is safer
Scoring Breakdown
ParameterValueTarget / RuleStatus
Overall Risk Medium Low preferred
Info
River Flood Risk Medium Low preferred
Info
Waterlogging Risk Medium Low preferred
Info
💡 What does this mean for you?Lower flood risk means less disruption and lower hazard exposure.

🏚️ Earthquake Risk

Final Score: 10.0/100 ↑ Higher is Better
ℹ️ What is Earthquake Risk?Earthquake profile uses seismic zone, PGA and soil/liquefaction risk factors.
Seismic Zone
Zone II
Lower risk zone preferred
Risk Level
Low
Low preferred
Liquefaction
None
Low preferred
Scoring Breakdown
ParameterValueTarget / RuleStatus
Seismic Zone Zone II II preferred
Info
Risk Level Low Low preferred
Info
PGA (475yr) 0.0155g Lower preferred
Info
💡 What does this mean for you?Lower seismic hazard reduces structural and insurance risk exposure.

🌡️ Land Surface Temp

Final Score: 52.4/100 ↑ Higher is Better
ℹ️ What is Land Surface Temp?Land Surface Temperature reflects heat-island intensity from satellite thermal bands.
LST Mean
31.9°C
Lower better
LST Min
24.8°C
Context
LST Max
40.7°C
Lower better
Scoring Breakdown
ParameterValueTarget / RuleStatus
LST Mean 31.9°C 20°C best / 45°C worst
Weighted by formula
LST Score 52.4 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
LST Mean (°C) 32.0 31.9 31.9
LST Min (°C) 26.3 23.3 24.8
LST Max (°C) 40.4 41.0 40.7
LST Score 52.2 52.6 52.4
💡 What does this mean for you?Higher heat exposure affects comfort, cooling load and health risk.

🏗️ Built-up Density

Final Score: 37.3/100 ↑ Higher is Better
ℹ️ What is Built-up Density?Built-up density measures extent of developed surface versus open space.
Built-up %
62.7%
Lower better
Open Space %
37.3%
Higher better
Built-up Score
37.3
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Built-up % 62.7% Inverse scoring
Score = 100 - builtup%
Open Space % 37.3% Context
Info
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Built-up % 65.6% 59.8% 62.7%
Open Space % 34.4% 40.2% 37.3%
Built-up Score 34.4 40.2 37.3
💡 What does this mean for you?Very high built-up often raises heat and runoff while reducing open environmental buffers.

💡 Night-time Lights

Final Score: 38.6/100 ↑ Higher is Better
ℹ️ What is Night-time Lights?Nighttime lights are a proxy for economic activity and electrification intensity.
Avg Radiance
19.28
Higher better
Max Radiance
28.85
Context
NTL Score
38.6
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Avg Radiance 19.28 Scaled to 50
Score = min(100, avg/50*100)
NTL Score 38.6 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Avg Radiance 17.48 21.08 19.28
Max Radiance 25.20 32.50 28.85
NTL Score 35.0 42.2 38.6
💡 What does this mean for you?Higher radiance often indicates stronger urban activity but can correlate with light pollution.

🏞️ Water Bodies

Final Score: 100.0/100 ↑ Higher is Better
ℹ️ What is Water Bodies?Water-bodies score reflects permanent and seasonal water presence in the analysis radius.
Permanent Water
48.33%
Higher generally better
Seasonal Water
90.38%
Context
Water Score
100.0
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Permanent Water % 48.33% 70% weight
Scaled against 10%
Seasonal Water % 90.38% 30% weight
Scaled against 20%
Water Score 100.0 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Permanent Water % 48.32% 48.34% 48.33%
Seasonal Water % 89.13% 91.63% 90.38%
Water Score 100.0 100.0 100.0
💡 What does this mean for you?Water presence can support cooling, recharge and ecological quality.

👥 Population Density

Final Score: 71.6/100 ↑ Higher is Better
ℹ️ What is Population Density?Population density indicates urban crowding pressure around the area.
Population
93,975
Estimated residents
Density/km²
5,686.1
Lower better for this score
Score
71.6
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Density/km² 5,686.1 Inverse scale up to 20,000
Lower -> higher score
Score 71.6 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Population Total 16,699 171,251 93,975
Density / km² 5,315.4 6,056.8 5,686.1
Pop Density Score 73.4 69.7 71.6
💡 What does this mean for you?Extremely high density can increase pressure on services and mobility.

Groundwater

Final Score: 63.2/100 ↑ Higher is Better
ℹ️ What is Groundwater?Groundwater score combines moisture, recharge, drought and trend indicators.
Soil Moisture
131.203
Higher better
Recharge
2.26
Higher better
PDSI
3.05
Higher better
Scoring Breakdown
ParameterValueTarget / RuleStatus
Soil Moisture 131.203 30% weight
Scaled
Recharge 2.26 25% weight
Scaled
PDSI 3.05 20% weight
Scaled
SM Trend 0.0000 15% weight
Scaled
Precipitation 1,874.74 10% weight
Scaled
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Soil Moisture 130.942 131.463 131.203
Recharge Estimate 2.40 2.12 2.26
PDSI 3.05 3.05 3.05
Groundwater Score 63.2 63.3 63.2
💡 What does this mean for you?Higher score suggests better long-term aquifer and moisture support conditions.

🚶 Walkability & Safety

↑ Higher is Better
ℹ️ What is Walkability & Safety?OSM amenity metrics reflect pedestrian, safety and urban accessibility infrastructure.
Footpaths
0
Higher better
Street Lamps
0
Higher better
Police/Fire Access
1
Presence
Scoring Breakdown
ParameterValueTarget / RuleStatus
Footpaths (500m) 0 ≥ 3
Concern
Sidewalk Roads (1km) 0 ≥ 5
Concern
Nearest Police Station 1,623 m ≤ 2000m
Context
💡 What does this mean for you?Higher OSM accessibility/safety features generally improve everyday livability.

🌬️ Air Quality: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

💧 Water Quality: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🧹 Sanitation: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🛣️ Infrastructure: Infrastructure Score Formula

Formula: Composite weighted model from GHSL/ESA/VIIRS/Terrain features
ComponentValueWeight/RuleContribution
Urbanization index99.8420%SMOD
Built-up balance62.7%15%Best in moderate band
NTL stability70.0%15%Power/activity consistency
Avg building height7.45 m10%Vertical infra proxy
Impervious %49.9%10%Moderate is optimal
Radiance19.4510%Development proxy
Slope0.10°10%Flatter is better
Green support10.8%10%Tree + grass contribution
This is the same weighted structure used in Livability Infrastructure model.
Final: 78.21 / 100

🏥 Amenities: Amenity Score Breakdown

Formula: Each amenity category is capped at 100, final score is averaged across categories
ComponentValueWeight/RuleContribution
Hospitals 500m1 * 33Cap 100Health access
Schools 1km4 * 20Cap 100Education access
Markets 1km7 * 33Cap 100Daily needs
Parks 500m0 * 33Cap 100Open space
Transit 1km0 * 50Cap 100Mobility
Category multipliers mirror the Livability snapshot logic.
Final: Final from amenity_scores table

🌳 Green Cover: Green Score Formula

Formula: Score = (NDVI*40%) + (Vegetation*30%) + (Dense Green*20%) + (Parks*10%)
ComponentValueWeight/RuleContribution
NDVI component0.193 => 38.640%15.4
Vegetation component21.5% => 21.530%6.4
Dense green component10.2% => 20.320%4.1
Parks component0 => 0.010%0.0
This matches the Livability GreenCover model weighting logic.
Final: 25.94 / 100

🔊 Noise: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🌊 Flood Risk: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🏚️ Earthquake Risk: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🌡️ Land Surface Temp: LST Score Formula

Formula: Score = ((45 - LST Mean) / 25) * 100, clipped to [0,100]
ComponentValueWeight/RuleContribution
LST Mean31.91 °CReference20°C best, 45°C worst
Lower land surface temperature means better livability.
Final: 52.36 / 100

🏗️ Built-up Density: Built-up Score Formula

Formula: Score = 100 - Built-up %
ComponentValueWeight/RuleContribution
Built-up %62.7%InverseLower is better
Dense concrete surfaces reduce infiltration and increase heat islands.
Final: 37.31 / 100

💡 Night-time Lights: Night-time Lights Formula

Formula: Score = min(100, (Avg Radiance / 50) * 100)
ComponentValueWeight/RuleContribution
Avg Radiance19.28Scale 0-50Higher indicates activity
Higher night radiance generally tracks electrification and economic intensity.
Final: 38.57 / 100

🏞️ Water Bodies: Water Bodies Score Formula

Formula: Score = (Permanent Water Score * 70%) + (Seasonal Water Score * 30%)
ComponentValueWeight/RuleContribution
Permanent water48.33%70%Scaled against 10% benchmark
Seasonal water90.38%30%Scaled against 20% benchmark
Permanent water has higher score weight than seasonal water.
Final: 100.00 / 100

👥 Population Density: Population Density Formula

Formula: Score = ((20000 - density_per_km²) / 20000) * 100, clipped to [0,100]
ComponentValueWeight/RuleContribution
Density5,686.1 /km²Inverse scaleLower density -> higher score
This follows the Livability PopulationDensity model.
Final: 71.57 / 100

⛲ Groundwater: Groundwater Score Formula

Formula: Weighted: Soil Moisture 30% + Recharge 25% + PDSI 20% + Trend 15% + Precipitation 10%
ComponentValueWeight/RuleContribution
Soil moisture131.20330%Scaled to 0-200
Recharge estimate2.2625%Scaled -200 to +400
PDSI3.0520%Scaled -4 to +4
SM trend0.000015%Scaled -50 to +50
Precipitation1,874.7410%Scaled 800 to 1800
Exactly reused from Livability Groundwater model logic.
Final: 63.23 / 100

🚶 Walkability & Safety: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

View full livability report for Rawan →

Compliance Status

RERA registration, filings, and compliance flags based on public CG-RERA records.

Compliance Status Based on public CG-RERA records
3 Passed
1 Issue(s)
2 N/A
RERA Registration Active
Reg No. PCGRERA050618000043 — Status: Ongoing
No Penalty Orders
1 order(s) on record, none with penalty sections (Sec 38/39/40/59/61/63)
Sec 38–63 · Source
No Recent Orders
No orders filed in the last 12 months (older: 1)
Completion Overdue
Was due 30 Jun 2018 — overdue by ~95 month(s)
Section 4 · Source
Quarterly Updates Not Available
No compliance snapshot data on record
Section 11 · Source
Annual Audit Not Available
No compliance snapshot data on record
Section 4(2)(l)(D) · Source
Each check is based on publicly available CG-RERA portal data as of Apr 2026. How this works →

Details

Registration, professional team, bank, promoters, and compliance history.

Registration Details
RERA Number
PCGRERA050618000043
Status
Ongoing
Project Type
Residential Development
Approved Date
05 Jun 2018
Original End Date
30 Jun 2018
EWS Category
NO
Construction Cost
₹ 60102877
Land Cost
₹ 23063814
Proposed Completion
30 Jun 2018
Authorised Person
BHAVESH PATEL
Website
www.nirmanbuilders.co.in
Professional Team
RoleNameLicense / Membership
Statutory CA pradeep kumar jain 065853
Quarterly CA JAYANT BHURA 506321
Promoters

Location

Project address, coordinates, and nearby places.

Location Details
Address
GOGAON RAIPUR CHHATTISGARH
District
Raipur
Tehsil
Raipur
Coordinates
21.2705363, 81.6103575 View on Map
Neighborhood Intelligence

Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.

Neighborhood Map 3 km radius
RERA Projects Near GOKUL TOWER 30 found within 3 km
# Project District Status Distance
1 mansarovar residency Raipur Ongoing 0.67 km
2 Avinash Aashiyana Extension Raipur New 0.75 km
3 construction of 27 no jr mig(3bhk) at phase-4 kabir nagar raipur Raipur New 0.81 km
4 saheb society Raipur Ongoing 1.36 km
5 CONSTRUCTION & DEVELOPMNT OF 96 LIG (G+6)&48 EWS (G+6) FLATS AT PHASE-3 KABIR NAGAR RAIPUR Raipur New 1.43 km
6 GOLDEN ARCADE Raipur Ongoing 1.45 km
7 ANUGRAH RESIDENCY Raipur Ongoing 1.49 km
8 PMAY OF 576 DUS VILLAGE -KOTA CHIRHULDIH , - RAIPUR Raipur Ongoing 1.60 km
9 imperial heights Raipur Ongoing 1.63 km
10 pmay of 280(dus) at kata chirhuldih ,raipur Raipur Ongoing 1.74 km
11 GULMOHAR PARK Raipur Ongoing 1.85 km
12 CREST GREENS Raipur Ongoing 1.87 km
13 KALPTARU CASITA Raipur New 2.03 km
14 O2 business center Raipur Ongoing 2.10 km
15 v3 bAlaji green city, & balaji hights Raipur Ongoing 2.10 km
16 life style empressa Raipur Ongoing 2.15 km
17 maruti life style tower Raipur New 2.20 km
18 ishaan heightS Raipur New 2.41 km
19 CELEBRITY HOMES Raipur Ongoing 2.43 km
20 PARK AVENUE Raipur New 2.47 km
21 ARYAPOLIS Raipur Ongoing 2.54 km
22 sun city Raipur Ongoing 2.61 km
23 SAMRAJYA RESIDENCY Raipur New 2.62 km
24 pmay of 696(dus) at sondongri ,raipur Raipur Ongoing 2.77 km
25 fortune residency Raipur New 2.82 km
26 AKANKSHA PARISAR Raipur Ongoing 2.87 km
27 RAJARIA INDUSTRIAL EUIPMENTS PRIVATE LIMITED Raipur Ongoing 2.90 km
28 govinda green Raipur New 2.91 km
29 LALGANGA MIDAS Raipur Ongoing 2.94 km
30 HARSHIT LANDMARK (PHASE-IV, BLOCK-G) Raipur Ongoing 2.98 km

Buyer Checklist

Documents and verifications a buyer should review before purchase.

Buyer Document Verification Checklist

Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.

11/14 verified
  • RERA Registration Certificate Available
    Confirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.
    RERA No: PCGRERA050618000043
  • Promoter Registration Certificate Available
    Builder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
  • Approved Building / Sanction Plan Verify Independently
    Building plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
  • Layout Plan Available
    Approved layout showing plot divisions, roads, open spaces, and common areas.
  • Title Deed / Ownership Proof Available
    Proof that the promoter legally owns the land. Verify via Sub-Registrar records.
  • Encumbrance Certificate Available
    Confirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
  • Land Use / Diversion Certificate Verify Independently
    Required if land was converted from agricultural to non-agricultural use.
  • Architect Certificate Available
    Certification from a registered architect confirming structural plans and compliance.
  • Structural Engineer Certificate Available
    Certification from a structural engineer confirming building safety and load-bearing capacity.
  • CA Financial Certificate Available
    Chartered Accountant certificate on financial status, project cost estimates, and fund utilization.
  • Commencement Certificate Available
    Permission to begin construction issued by the local authority after plan approval.
  • NOCs (No Objection Certificates) Verify Independently
    NOCs from fire department, environment, water supply, electricity board, and other authorities.
  • Project Brochure / Specification Available
    Official brochure with unit types, amenities, and specifications. Compare with actual delivery.
  • RERA Compliance Orders Available
    Check if any orders, penalties, or directions have been issued against this project by RERA.
    1 order(s) on record — review in Legal tab

Risk Zone Within 5 km

Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.

21
Risk zones (within 5 km)
3 km: 11 3–5 km: 10
14
Water bodies (river/nala/lake)
3 km: 8 3–5 km: 6
7
Landfill / waste sites
3 km: 3 3–5 km: 4
0
Airport buffer overlap
3 km: 0 3–5 km: 0
Risk Zone Map (3 km & 5 km rings) Project marker centered
Water Bodies (14)
  • Tatibandh Talab ≤3 km
    Tank · 50m buffer
    0.32 km
  • Tatibandh Nala ≤3 km
    Nala · 20m buffer
    0.93 km
  • Serikhedi Talab ≤3 km
    Tank · 50m buffer
    1.71 km
  • Mowa Talab ≤3 km
    Tank · 50m buffer
    1.91 km
  • Maharajband Talab ≤3 km
    Tank · 50m buffer
    2.41 km
  • Mowa Nala ≤3 km
    Nala · 20m buffer
    2.46 km
  • Sarora Talab ≤3 km
    Pond · 50m buffer
    2.51 km
  • Devpuri Nala ≤3 km
    Nala · 20m buffer
    2.93 km
Landfill / Waste Sites (7)
  • Tatibandh Legacy Dump ≤3 km
    Legacy dump · 500m buffer
    1.7 km
  • Gudhiyari Old Dump Site ≤3 km
    Legacy dump · 500m buffer
    2.41 km
  • Sarora SLRM Centre (Manikanchan Kendra) ≤3 km
    Waste processing · 200m buffer
    2.49 km
  • Purena-Birgaon Legacy Dump 3–5 km
    Legacy dump · 500m buffer
    4.12 km
  • Old Raipur Trenching Ground 3–5 km
    Inactive landfill · 500m buffer
    4.44 km
  • Jarway Transfer Station 3–5 km
    Transfer station · 100m buffer
    4.48 km
  • SLRM Centre Achcholi-Birgaon 3–5 km
    Waste processing · 200m buffer
    4.97 km

Reviews

Verified buyer reviews and ratings for this project.

No reviews yet. Be the first to review this project!

Login to Write a Review

You need to be signed in to submit a review for this project.

Login or Register