SHYAM PLAZA
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of GE Road
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (GE Road — 0.94 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for GE Road. Only parameters with available data are shown below. Based on the latest readings for GE Road.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 24.2 µg/m³ | ≤ 40 |
Good
|
| PM10 | 174.1 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.7 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 359 ppm | ≤ 500 |
Good
|
| Fluoride | 1.06 mg/L | ≤ 1.0 |
Concern
|
| Turbidity | 6.6 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 60% | ≥ 80% |
Concern
|
| Drainage Coverage | 70% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 59.4% | 40-70% |
Contextual
|
| Impervious Surface | 31.8% | < 70% |
Good
|
| NDVI Mean | 0.280 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 52.4% | 66.3% | 59.4% |
| Tree Cover % | 30.1% | 13.7% | 21.9% |
| Urbanization Index | 100.0 | 100.0 | 100.0 |
| Infra Score | 80.9 | 80.3 | 82.8 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 1 | ≥1 |
Good
|
| Schools (1km) | 9 | ≥3 |
Good
|
| Markets (1km) | 6 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.150 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 14.2% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 8.2% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 4 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.135 | 0.165 | 0.150 |
| Vegetation % | 15.2% | 13.3% | 14.2% |
| Dense Green % | 5.0% | 11.3% | 8.2% |
| Tree Canopy % | 5.2% | 9.6% | 7.4% |
| Green Score | 27.4 | 31.7 | 29.5 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 53.5 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 47.7 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 240 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | High | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.5°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 57.9 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.3 | 30.8 | 30.5 |
| LST Min (°C) | 24.1 | 21.2 | 22.6 |
| LST Max (°C) | 39.1 | 40.2 | 39.6 |
| LST Score | 58.8 | 57.0 | 57.9 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 59.4% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 40.7% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 52.4% | 66.3% | 59.4% |
| Open Space % | 47.6% | 33.7% | 40.7% |
| Built-up Score | 47.6 | 33.7 | 40.7 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 23.88 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 47.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 23.76 | 24.00 | 23.88 |
| Max Radiance | 36.80 | 37.51 | 37.15 |
| NTL Score | 47.5 | 48.0 | 47.8 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 67.53% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 95.68% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 78.04% | 57.02% | 67.53% |
| Seasonal Water % | 95.54% | 95.81% | 95.68% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 6,557.9 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 67.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 20,555 | 185,843 | 103,199 |
| Density / km² | 6,542.9 | 6,572.9 | 6,557.9 |
| Pop Density Score | 67.3 | 67.1 | 67.2 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 131.274 | 30% weight |
Scaled
|
| Recharge | 1.73 | 25% weight |
Scaled
|
| PDSI | 2.98 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,875.82 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 131.001 | 131.548 | 131.274 |
| Recharge Estimate | 1.83 | 1.63 | 1.73 |
| PDSI | 2.96 | 2.99 | 2.98 |
| Groundwater Score | 63.0 | 63.1 | 63.0 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 45.6 | < 40 |
Concern
|
| Avg Slope | 3.23° | > 1° |
Good
|
| Avg Impervious | 45.9% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 3 | ≥ 5 |
Concern
|
| Nearest Police Station | 985 m | ≤ 2000m |
Context
|
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA300618000418
- Status
- Ongoing
- Project Type
- Commercial Development
- Approved Date
- 30 Jun 2018
- Original End Date
- 31 Dec 2018
- EWS Category
- NO
- Proposed Completion
- 31 Dec 2018
- Authorised Person
- santosh singhania
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- village - pandri, pt. ravishankar shukla ward-24, raipur (c.g.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2468599, 81.5974452 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | PARK AVENUE | Raipur | New | 0.59 km |
| 2 | PIC heightS | Raipur | Ongoing | 0.73 km |
| 3 | RALAS ENCLAVE | Raipur | Ongoing | 1.08 km |
| 4 | KALPTARU CASITA | Raipur | New | 1.12 km |
| 5 | ishaan heightS | Raipur | New | 1.26 km |
| 6 | TIRUPATI ENCLAVE COMMERCIAL | Raipur | Ongoing | 1.30 km |
| 7 | TIRUPATI ENCLAVE PHASE -I | Raipur | Ongoing | 1.30 km |
| 8 | life style empressa | Raipur | Ongoing | 1.30 km |
| 9 | TIRUPATI ENCLAVE PHASE-03 | Raipur | New | 1.32 km |
| 10 | maruti life style tower | Raipur | New | 1.36 km |
| 11 | TIRUPATI ENCLAVE PHASE- II | Raipur | Ongoing | 1.38 km |
| 12 | kanchan vihar phase -ii | Raipur | Ongoing | 1.40 km |
| 13 | KANCHAN VIHAR PHASE - I | Raipur | Ongoing | 1.42 km |
| 14 | PMAY OF 576 DUS VILLAGE -KOTA CHIRHULDIH , - RAIPUR | Raipur | Ongoing | 1.53 km |
| 15 | GOLDEN ARCADE | Raipur | Ongoing | 1.64 km |
| 16 | ARIHANT NAGAR | Raipur | Ongoing | 1.68 km |
| 17 | saheb society | Raipur | Ongoing | 1.70 km |
| 18 | CREST GREENS | Raipur | Ongoing | 1.71 km |
| 19 | ARYAPOLIS | Raipur | Ongoing | 1.72 km |
| 20 | fortune residency | Raipur | New | 1.73 km |
| 21 | HARSHIT URBAN CITY | Raipur | New | 1.77 km |
| 22 | PARTHIVI PACIFIC-ROYAL WOODS | Raipur | Ongoing | 1.90 km |
| 23 | govinda green | Raipur | New | 2.00 km |
| 24 | pmay of 280(dus) at kata chirhuldih ,raipur | Raipur | Ongoing | 2.00 km |
| 25 | TDS-01 INDRAPRASTH PHASE -2 | Raipur | Ongoing | 2.06 km |
| 26 | chhugani pride phase - 2 | Raipur | New | 2.12 km |
| 27 | CELEBRITY HOMES | Raipur | Ongoing | 2.19 km |
| 28 | GULMOHAR PARK | Raipur | Ongoing | 2.20 km |
| 29 | sun city | Raipur | Ongoing | 2.22 km |
| 30 | imperial heights | Raipur | Ongoing | 2.32 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA300618000418
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
2.03 kmSerikhedi Talab ≤3 kmTank · 50m buffer
-
2.28 kmKharun Right Bank Canal ≤3 kmCanal · 20m buffer
-
2.54 kmBhatagaon Nala ≤3 kmNala · 20m buffer
-
2.86 kmDevpuri Nala ≤3 kmNala · 20m buffer
-
3.27 kmTatibandh Talab 3–5 kmTank · 50m buffer
-
3.63 kmMaharajband Talab 3–5 kmTank · 50m buffer
-
3.74 kmKankali Talab 3–5 kmTank · 50m buffer
-
3.77 kmGudhiyari Nala 3–5 kmNala · 20m buffer
-
1.65 kmGudhiyari Old Dump Site ≤3 kmLegacy dump · 500m buffer
-
2.21 kmOld Raipur Trenching Ground ≤3 kmInactive landfill · 500m buffer
-
4.1 kmBhanpuri-Rawabhata Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
4.31 kmTatibandh Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
4.41 kmJarway Transfer Station 3–5 kmTransfer station · 100m buffer
-
4.8 kmSarora Trenching Ground 3–5 kmActive landfill · 500m buffer
-
4.93 kmSarora Composting / Bio-methanation Plant 3–5 kmWaste processing · 200m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!