SAMRAJYA RESIDENCY
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Fafadih
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Fafadih — 1.06 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Fafadih. Only parameters with available data are shown below. Based on the latest readings for Fafadih.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 29.2 µg/m³ | ≤ 40 |
Good
|
| PM10 | 187.6 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.3 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 489 ppm | ≤ 500 |
Good
|
| Fluoride | 0.83 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 4.2 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 38% | ≥ 80% |
Concern
|
| Drainage Coverage | 48% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 58.0% | 40-70% |
Contextual
|
| Impervious Surface | 33.8% | < 70% |
Good
|
| NDVI Mean | 0.300 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 51.5% | 64.6% | 58.0% |
| Tree Cover % | 28.6% | 19.6% | 24.1% |
| Urbanization Index | 100.0 | 100.0 | 100.0 |
| Infra Score | 81.3 | 83.0 | 83.1 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 8 | ≥3 |
Good
|
| Markets (1km) | 5 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.180 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 24.6% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 9.7% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 1 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.172 | 0.187 | 0.180 |
| Vegetation % | 22.3% | 27.0% | 24.6% |
| Dense Green % | 11.5% | 7.9% | 9.7% |
| Tree Canopy % | 14.2% | 12.9% | 13.6% |
| Green Score | 28.3 | 29.5 | 29.0 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 54.1 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 49.0 dB | ≤ 45.0 dB |
Concern
|
| Nearest Highway | — m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | High | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.1°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 59.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.0 | 30.2 | 30.1 |
| LST Min (°C) | 14.2 | 15.8 | 15.0 |
| LST Max (°C) | 39.3 | 39.7 | 39.5 |
| LST Score | 60.2 | 59.1 | 59.6 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 58.0% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 42.0% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 51.5% | 64.6% | 58.0% |
| Open Space % | 48.5% | 35.4% | 42.0% |
| Built-up Score | 48.5 | 35.4 | 42.0 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 23.25 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 46.5 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 22.22 | 24.29 | 23.25 |
| Max Radiance | 35.48 | 38.40 | 36.94 |
| NTL Score | 44.4 | 48.6 | 46.5 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 23.77% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 97.77% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 0.00% | 47.54% | 23.77% |
| Seasonal Water % | 100.00% | 95.54% | 97.77% |
| Water Score | 30.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 6,610.7 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 67.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 21,414 | 181,097 | 101,256 |
| Density / km² | 6,816.4 | 6,405.0 | 6,610.7 |
| Pop Density Score | 65.9 | 68.0 | 67.0 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 133.098 | 30% weight |
Scaled
|
| Recharge | 1.62 | 25% weight |
Scaled
|
| PDSI | 3.07 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,871.67 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 133.000 | 133.196 | 133.098 |
| Recharge Estimate | 1.60 | 1.64 | 1.62 |
| PDSI | 3.07 | 3.06 | 3.07 |
| Groundwater Score | 63.5 | 63.5 | 63.5 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 52.1 | < 40 |
Concern
|
| Avg Slope | 3.05° | > 1° |
Good
|
| Avg Impervious | 54.5% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Environmental | Sewer Overflow Point - Fafadih Chowk | 200 m / High | Sewer manhole frequently overflows during monsoon creating health hazard |
| Land_zoning | Industrial to Residential Transition | 0 m / Medium | Pending rezoning from industrial to residential creating uncertainty |
| Infrastructure | Fafadih Internal Roads Damaged | 150 m / Medium | Colony roads damaged by heavy truck movement from industrial area |
| Air_pollution | Fafadih Industrial Pocket | 300 m / Medium | Small-scale manufacturing units causing intermittent air pollution |
| Health_nuisance | Biomedical Waste from Clinics | 400 m / Medium | Multiple private clinics with improper biomedical waste disposal |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA280818000727
- Status
- New
- Project Type
- Residential Development
- Approved Date
- 28 Aug 2018
- Original End Date
- 31 Aug 2020
- EWS Category
- NO
- Construction Cost
- ₹ 690507000
- Land Cost
- ₹ 249695000
- Proposed Completion
- 28 May 2022
- Authorised Person
- VASUDEV PATEL
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | SUMIT JAIN | 411593 |
| Quarterly CA | SANJEEB KUMAR JAIN | 422298 |
| Engineer | Yesh Jain | 525/2009 |
| Architect | Indrajeet Prajapati | CA/2010/49841 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - KHAMTARAI, RAIPUR (C.G.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2725856, 81.6355786 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | LALGANGA MIDAS | Raipur | Ongoing | 1.03 km |
| 2 | ashapura homes | Raipur | Ongoing | 1.15 km |
| 3 | ANUGRAH RESIDENCY | Raipur | Ongoing | 1.65 km |
| 4 | RAJARIA INDUSTRIAL EUIPMENTS PRIVATE LIMITED | Raipur | Ongoing | 1.77 km |
| 5 | RAHEJA TOWER | Raipur | Ongoing | 1.86 km |
| 6 | SIMRAN HEIGHTS | Raipur | Ongoing | 2.01 km |
| 7 | PITHALIA PLAZA | Raipur | Ongoing | 2.06 km |
| 8 | O2 business center | Raipur | Ongoing | 2.20 km |
| 9 | merlin jayshree vihar (phase-ii) | Raipur | Ongoing | 2.34 km |
| 10 | BRIGHT ENCLAVE | Raipur | Ongoing | 2.37 km |
| 11 | C.G. ELITE | Raipur | Ongoing | 2.58 km |
| 12 | AKANKSHA PARISAR | Raipur | Ongoing | 2.68 km |
| 13 | GULMOHAR PARK | Raipur | Ongoing | 2.76 km |
| 14 | KAVISH ENCLAVE | Raipur | New | 2.81 km |
| 15 | mansarovar residency | Raipur | Ongoing | 2.84 km |
| 16 | pmay of 280(dus) at kata chirhuldih ,raipur | Raipur | Ongoing | 2.91 km |
| 17 | ANAND ARCADE | Raipur | Ongoing | 2.93 km |
| 18 | USHA ESTATES | Raipur | New | 3.00 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA280818000727
-
Approved Building / Sanction Plan AvailableBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.39 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
1.29 kmMowa Nala ≤3 kmNala · 20m buffer
-
1.38 kmBoriyakhurd Talab ≤3 kmTank · 50m buffer
-
1.44 kmMowa Talab ≤3 kmTank · 50m buffer
-
1.62 kmMaharajband Talab ≤3 kmTank · 50m buffer
-
1.84 kmTatibandh Nala ≤3 kmNala · 20m buffer
-
2.44 kmTatibandh Talab ≤3 kmTank · 50m buffer
-
2.82 kmSarora Talab ≤3 kmPond · 50m buffer
-
2.85 kmKankali Talab ≤3 kmTank · 50m buffer
-
3.16 kmSarora SLRM Centre (Manikanchan Kendra) 3–5 kmWaste processing · 200m buffer
-
3.33 kmSLRM Centre Tendua (Tundra) 3–5 kmWaste processing · 200m buffer
-
3.46 kmTatibandh Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
3.77 kmPurena-Birgaon Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
4.52 kmDaldal Seoni MSW Transfer Station 3–5 kmTransfer station · 100m buffer
-
4.93 kmGudhiyari Old Dump Site 3–5 kmLegacy dump · 500m buffer
-
4.96 kmSLRM Centre Achcholi-Birgaon 3–5 kmWaste processing · 200m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!