Home / RERA Projects / ALAYA PLOTS, ANANDAM WORLD CITY
ONGOING Plotted Development RERA Page Project Website

ALAYA PLOTS, ANANDAM WORLD CITY

Compliance Status
Partial Compliance
21.2549, 81.6922 Explore area
District
Raipur
Area
Promoter
MR. ATUL AGRAWAL
Project Information
Promoter MR. ATUL AGRAWAL
Type Plotted Development
Status Ongoing
Completion 26 Aug 2022
Registered 22 Jun 2018
Original End 30 Jun 2018
EWS Category NO
Construction Cost ₹ 379914000
Land Cost ₹ 371171000
Authorised Person rakesh saraogi
Address VILLAGE- LABHANDIH, RAIPUR (C.G.)
At a Glance
-
Total Units
-
Units Sold
-
Unsold
5
Legal Cases
Aug 2022
Target Completion
100%
Completion
Amenities & Facilities (13)
BOUNDARY WALL
100%
ENERGY MAANAGEMENT
100%
FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS
100%
INTERNAL ROADS AND FOOTPATHS
100%
LANDSCAPING AND TREE PLANTING
100%
SECURITY SERVICE
100%
SEWERAGE
100%
SOLID WASTE MANAGEMENT AND DISPOSAL
100%
STORM WATER DRAINS
100%
STREET LIGHTING
100%
TREATMENT AND DISPOSAL OF SEWERAGE AND SULLAGE WAT
95%
WATER CONSERVATION RAIN WATER HARVESTING
100%
WATER SUPPLY
100%
Project Professionals
GURVINDER SINGH CHHABRA
STATUTORY CA
AKSHAY SINDHWANI
QUARTERLY CA
RAJENDRA JAIN
ENGINEER
SHASHIKANT KUJUR
ARCHITECT
Project Analysis

360° Project Intelligence

Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.

Area Livability

Livability of Kachna

Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Kachna — 1.36 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.



🏠 Livability Parameters

Latest readings for Kachna. Only parameters with available data are shown below. Based on the latest readings for Kachna.

C
Composite Score
53.4 /100
Average

🌬️ Air Quality

Final Score: 97.2/100 ↑ Higher is Better
ℹ️ What is Air Quality?AQI summarizes PM2.5, PM10 and gases. Lower pollution values improve public health outcomes.
AQI
57
Satisfactory
PM2.5
32.9 µg/m³
≤ 40
PM10
65.6 µg/m³
≤ 60
Scoring Breakdown
ParameterValueTarget / RuleStatus
PM2.5 32.9 µg/m³ ≤ 40
Good
PM10 65.6 µg/m³ ≤ 60
Concern
NO₂ 18.0 µg/m³ ≤ 40
Good
💡 What does this mean for you?Cleaner air lowers respiratory burden and improves outdoor comfort.

💧 Water Quality

Final Score: 64.3/100 ↑ Higher is Better
ℹ️ What is Water Quality?Water quality combines chemistry, supply duration and contamination markers.
TDS
457 ppm
≤ 500
pH
7.43
6.5–8.5
Supply
5.1 hr/day
≥ 8 hr
Scoring Breakdown
ParameterValueTarget / RuleStatus
TDS 457 ppm ≤ 500
Good
Fluoride 0.63 mg/L ≤ 1.0
Good
Turbidity 5.5 NTU ≤ 1
Concern
💡 What does this mean for you?Better supply quality and consistency reduces dependence on tanker/groundwater fallback.

🧹 Sanitation

Final Score: 31.1/100 ↑ Higher is Better
ℹ️ What is Sanitation?Sanitation reflects ODF status, sewage treatment and waste management regularity.
ODF
ODF
ODF++
Sewage Coverage
22%
≥ 80%
Drainage
32%
≥ 90%
Scoring Breakdown
ParameterValueTarget / RuleStatus
ODF Status ODF ODF++
Info
Sewage Coverage 22% ≥ 80%
Concern
Drainage Coverage 32% ≥ 90%
Concern
💡 What does this mean for you?Higher sanitation maturity lowers disease exposure and neighborhood nuisance.

🛣️ Infrastructure

Final Score: 60.2/100 ↑ Higher is Better
ℹ️ What is Infrastructure?Infrastructure score combines land use, urbanization, built form, night lights and terrain indicators.
Built-up
21.6%
Balanced band
Tree Cover
16.4%
≥ 15%
Urbanization
95.4
Higher better
Scoring Breakdown
ParameterValueTarget / RuleStatus
Built-up (LULC) 21.6% 40-70%
Contextual
Impervious Surface 14.9% < 70%
Good
NDVI Mean 0.300 > 0.3
Concern
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Built-up (LULC) % 18.1% 25.1% 21.6%
Tree Cover % 18.9% 13.9% 16.4%
Urbanization Index 100.0 90.9 95.4
Infra Score 59.9 60.5 60.2
💡 What does this mean for you?Balanced built + green mix usually improves long-term livability resilience.

🏥 Amenities

Final Score: 56.8/100 ↑ Higher is Better
ℹ️ What is Amenities?Amenity score captures daily-access services in walk/short-drive radii.
Hospitals 500m
0
Target ≥1
Schools 1km
6
Target ≥3
Parks 500m
0
Target ≥1
Scoring Breakdown
ParameterValueTarget / RuleStatus
Hospitals (500m) 0 ≥1
Concern
Schools (1km) 6 ≥3
Good
Markets (1km) 1 ≥1
Good
💡 What does this mean for you?Higher local amenity density improves convenience and walkability.

🌳 Green Cover

Final Score: 36.7/100 ↑ Higher is Better
ℹ️ What is Green Cover?NDVI and vegetation structure are measured from satellite imagery to estimate neighborhood greenery.
NDVI Mean
0.219
Greenness index
Vegetation
32.7%
% green pixels
Dense Green
17.2%
Thick canopy
Scoring Breakdown
ParameterValueTarget / RuleStatus
NDVI Mean 0.219 0.5 maps to score 100
Weighted 40%
Vegetation % 32.7% Direct % (cap 100)
Weighted 30%
Dense Green % 17.2% Scaled from 50%
Weighted 20%
Parks within 500m 0 Count * 33 (cap 100)
Weighted 10%
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
NDVI Mean 0.216 0.221 0.219
Vegetation % 27.4% 38.1% 32.7%
Dense Green % 15.6% 18.9% 17.2%
Tree Canopy % 19.3% 16.8% 18.1%
Green Score 31.8 36.7 34.2
💡 What does this mean for you?Higher green metrics typically reduce heat stress and improve comfort.

🔊 Noise

Final Score: 43.7/100 ↑ Higher is Better
ℹ️ What is Noise?Noise uses measured day/night dB compared to CPCB zone limits.
Day dB
56.7
vs CPCB day limit
Night dB
45.1
vs CPCB night limit
Zone
CPCB class
Scoring Breakdown
ParameterValueTarget / RuleStatus
Day Noise 56.7 dB ≤ 55.0 dB
Concern
Night Noise 45.1 dB ≤ 45.0 dB
Concern
Nearest Highway 1,926 m Higher usually quieter
Info
💡 What does this mean for you?Chronic high noise impacts stress, sleep quality and perceived comfort.

🌊 Flood Risk

Final Score: 70.0/100 ↑ Higher is Better
ℹ️ What is Flood Risk?Flood risk combines river exposure and local waterlogging vulnerability.
Overall Risk
Highest
Lower is safer
River Risk
High
Lower is safer
Waterlogging
High
Lower is safer
Scoring Breakdown
ParameterValueTarget / RuleStatus
Overall Risk Highest Low preferred
Info
River Flood Risk High Low preferred
Info
Waterlogging Risk High Low preferred
Info
💡 What does this mean for you?Lower flood risk means less disruption and lower hazard exposure.

🏚️ Earthquake Risk

Final Score: 25.0/100 ↑ Higher is Better
ℹ️ What is Earthquake Risk?Earthquake profile uses seismic zone, PGA and soil/liquefaction risk factors.
Seismic Zone
Zone II
Lower risk zone preferred
Risk Level
Low-Medium
Low preferred
Liquefaction
Medium
Low preferred
Scoring Breakdown
ParameterValueTarget / RuleStatus
Seismic Zone Zone II II preferred
Info
Risk Level Low-Medium Low preferred
Info
PGA (475yr) 0.0155g Lower preferred
Info
💡 What does this mean for you?Lower seismic hazard reduces structural and insurance risk exposure.

🌡️ Land Surface Temp

Final Score: 67.2/100 ↑ Higher is Better
ℹ️ What is Land Surface Temp?Land Surface Temperature reflects heat-island intensity from satellite thermal bands.
LST Mean
28.2°C
Lower better
LST Min
-2.0°C
Context
LST Max
39.7°C
Lower better
Scoring Breakdown
ParameterValueTarget / RuleStatus
LST Mean 28.2°C 20°C best / 45°C worst
Weighted by formula
LST Score 67.2 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
LST Mean (°C) 27.9 28.4 28.2
LST Min (°C) -2.6 -1.3 -2.0
LST Max (°C) 39.2 40.1 39.7
LST Score 68.2 66.2 67.2
💡 What does this mean for you?Higher heat exposure affects comfort, cooling load and health risk.

🏗️ Built-up Density

Final Score: 78.4/100 ↑ Higher is Better
ℹ️ What is Built-up Density?Built-up density measures extent of developed surface versus open space.
Built-up %
21.6%
Lower better
Open Space %
78.4%
Higher better
Built-up Score
78.4
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Built-up % 21.6% Inverse scoring
Score = 100 - builtup%
Open Space % 78.4% Context
Info
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Built-up % 18.1% 25.1% 21.6%
Open Space % 81.9% 74.9% 78.4%
Built-up Score 81.9 74.9 78.4
💡 What does this mean for you?Very high built-up often raises heat and runoff while reducing open environmental buffers.

💡 Night-time Lights

Final Score: 39.8/100 ↑ Higher is Better
ℹ️ What is Night-time Lights?Nighttime lights are a proxy for economic activity and electrification intensity.
Avg Radiance
19.91
Higher better
Max Radiance
32.87
Context
NTL Score
39.8
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Avg Radiance 19.91 Scaled to 50
Score = min(100, avg/50*100)
NTL Score 39.8 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Avg Radiance 20.39 19.42 19.91
Max Radiance 34.32 31.41 32.87
NTL Score 40.8 38.8 39.8
💡 What does this mean for you?Higher radiance often indicates stronger urban activity but can correlate with light pollution.

🏞️ Water Bodies

Final Score: 100.0/100 ↑ Higher is Better
ℹ️ What is Water Bodies?Water-bodies score reflects permanent and seasonal water presence in the analysis radius.
Permanent Water
57.93%
Higher generally better
Seasonal Water
95.93%
Context
Water Score
100.0
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Permanent Water % 57.93% 70% weight
Scaled against 10%
Seasonal Water % 95.93% 30% weight
Scaled against 20%
Water Score 100.0 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Permanent Water % 72.23% 43.62% 57.93%
Seasonal Water % 98.72% 93.13% 95.93%
Water Score 100.0 100.0 100.0
💡 What does this mean for you?Water presence can support cooling, recharge and ecological quality.

👥 Population Density

Final Score: 90.1/100 ↑ Higher is Better
ℹ️ What is Population Density?Population density indicates urban crowding pressure around the area.
Population
34,343
Estimated residents
Density/km²
1,972.6
Lower better for this score
Score
90.1
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Density/km² 1,972.6 Inverse scale up to 20,000
Lower -> higher score
Score 90.1 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Population Total 5,358 63,328 34,343
Density / km² 1,705.4 2,239.8 1,972.6
Pop Density Score 91.5 88.8 90.1
💡 What does this mean for you?Extremely high density can increase pressure on services and mobility.

Groundwater

Final Score: 63.9/100 ↑ Higher is Better
ℹ️ What is Groundwater?Groundwater score combines moisture, recharge, drought and trend indicators.
Soil Moisture
135.162
Higher better
Recharge
2.48
Higher better
PDSI
3.09
Higher better
Scoring Breakdown
ParameterValueTarget / RuleStatus
Soil Moisture 135.162 30% weight
Scaled
Recharge 2.48 25% weight
Scaled
PDSI 3.09 20% weight
Scaled
SM Trend 0.0000 15% weight
Scaled
Precipitation 1,860.77 10% weight
Scaled
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Soil Moisture 134.842 135.481 135.162
Recharge Estimate 2.87 2.09 2.48
PDSI 3.10 3.08 3.09
Groundwater Score 63.9 64.0 63.9
💡 What does this mean for you?Higher score suggests better long-term aquifer and moisture support conditions.

🌧️ Waterlogging

↑ Higher is Better
ℹ️ What is Waterlogging?Waterlogging combines topography, imperviousness and wetness indices across nearby grid cells.
Grid Count
25
Sampled cells
Avg Susceptibility
50.9
Lower is safer
High Risk Grids
16
High / Very High
Scoring Breakdown
ParameterValueTargetStatus
Avg Susceptibility 50.9 < 40
Concern
Avg Slope 2.38° > 1°
Good
Avg Impervious 14.5% < 70%
Good
💡 What does this mean for you?Higher susceptibility and low slope increase monsoon water stagnation probability.

🚶 Walkability & Safety

↑ Higher is Better
ℹ️ What is Walkability & Safety?OSM amenity metrics reflect pedestrian, safety and urban accessibility infrastructure.
Footpaths
0
Higher better
Street Lamps
0
Higher better
Police/Fire Access
0
Presence
Scoring Breakdown
ParameterValueTarget / RuleStatus
Footpaths (500m) 0 ≥ 3
Concern
Sidewalk Roads (1km) 0 ≥ 5
Concern
Nearest Police Station — m ≤ 2000m
Context
💡 What does this mean for you?Higher OSM accessibility/safety features generally improve everyday livability.

🌬️ Air Quality: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

💧 Water Quality: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🧹 Sanitation: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🛣️ Infrastructure: Infrastructure Score Formula

Formula: Composite weighted model from GHSL/ESA/VIIRS/Terrain features
ComponentValueWeight/RuleContribution
Urbanization index95.4320%SMOD
Built-up balance21.6%15%Best in moderate band
NTL stability67.0%15%Power/activity consistency
Avg building height2.67 m10%Vertical infra proxy
Impervious %14.9%10%Moderate is optimal
Radiance19.0910%Development proxy
Slope0.10°10%Flatter is better
Green support16.4%10%Tree + grass contribution
This is the same weighted structure used in Livability Infrastructure model.
Final: 60.17 / 100

🏥 Amenities: Amenity Score Breakdown

Formula: Each amenity category is capped at 100, final score is averaged across categories
ComponentValueWeight/RuleContribution
Hospitals 500m0 * 33Cap 100Health access
Schools 1km6 * 20Cap 100Education access
Markets 1km1 * 33Cap 100Daily needs
Parks 500m0 * 33Cap 100Open space
Transit 1km0 * 50Cap 100Mobility
Category multipliers mirror the Livability snapshot logic.
Final: Final from amenity_scores table

🌳 Green Cover: Green Score Formula

Formula: Score = (NDVI*40%) + (Vegetation*30%) + (Dense Green*20%) + (Parks*10%)
ComponentValueWeight/RuleContribution
NDVI component0.219 => 43.840%17.5
Vegetation component32.7% => 32.730%9.8
Dense green component17.2% => 34.520%6.9
Parks component0 => 0.010%0.0
This matches the Livability GreenCover model weighting logic.
Final: 34.24 / 100

🔊 Noise: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🌊 Flood Risk: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🏚️ Earthquake Risk: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🌡️ Land Surface Temp: LST Score Formula

Formula: Score = ((45 - LST Mean) / 25) * 100, clipped to [0,100]
ComponentValueWeight/RuleContribution
LST Mean28.19 °CReference20°C best, 45°C worst
Lower land surface temperature means better livability.
Final: 67.24 / 100

🏗️ Built-up Density: Built-up Score Formula

Formula: Score = 100 - Built-up %
ComponentValueWeight/RuleContribution
Built-up %21.6%InverseLower is better
Dense concrete surfaces reduce infiltration and increase heat islands.
Final: 78.40 / 100

💡 Night-time Lights: Night-time Lights Formula

Formula: Score = min(100, (Avg Radiance / 50) * 100)
ComponentValueWeight/RuleContribution
Avg Radiance19.91Scale 0-50Higher indicates activity
Higher night radiance generally tracks electrification and economic intensity.
Final: 39.81 / 100

🏞️ Water Bodies: Water Bodies Score Formula

Formula: Score = (Permanent Water Score * 70%) + (Seasonal Water Score * 30%)
ComponentValueWeight/RuleContribution
Permanent water57.93%70%Scaled against 10% benchmark
Seasonal water95.93%30%Scaled against 20% benchmark
Permanent water has higher score weight than seasonal water.
Final: 100.00 / 100

👥 Population Density: Population Density Formula

Formula: Score = ((20000 - density_per_km²) / 20000) * 100, clipped to [0,100]
ComponentValueWeight/RuleContribution
Density1,972.6 /km²Inverse scaleLower density -> higher score
This follows the Livability PopulationDensity model.
Final: 90.14 / 100

⛲ Groundwater: Groundwater Score Formula

Formula: Weighted: Soil Moisture 30% + Recharge 25% + PDSI 20% + Trend 15% + Precipitation 10%
ComponentValueWeight/RuleContribution
Soil moisture135.16230%Scaled to 0-200
Recharge estimate2.4825%Scaled -200 to +400
PDSI3.0920%Scaled -4 to +4
SM trend0.000015%Scaled -50 to +50
Precipitation1,860.7710%Scaled 800 to 1800
Exactly reused from Livability Groundwater model logic.
Final: 63.94 / 100

🌧️ Waterlogging: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🚶 Walkability & Safety: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

View full livability report for Kachna →

Compliance Status

RERA registration, filings, and compliance flags based on public CG-RERA records.

Compliance Status Based on public CG-RERA records
2 Passed
1 Warning
1 Issue(s)
2 N/A
RERA Registration Active
Reg No. PCGRERA220618000298 — Status: Ongoing
No Penalty Orders
5 order(s) on record, none with penalty sections (Sec 38/39/40/59/61/63)
Sec 38–63 · Source
5 Order(s) in Last 12 Months
Recent: M-PRO-2025-02723, M-PRO-2025-02724, M-PRO-2025-02726, M-PRO-2025-02725, M-PRO-2025-02727
Completion Overdue
Was due 26 Aug 2022 — overdue by ~45 month(s)
Section 4 · Source
Quarterly Updates Not Available
No compliance snapshot data on record
Section 11 · Source
Annual Audit Not Available
No compliance snapshot data on record
Section 4(2)(l)(D) · Source
Each check is based on publicly available CG-RERA portal data as of Apr 2026. How this works →
Other Projects by Same Promoter (6)
ProjectRERA No.StatusDistrictType
AANANDAM APARTMENT PCGRERA070718000498 Ongoing Korba Residential Development
AASTHA APARTMENT (M7) PHASE-I ANANDAM WORLD CITY PCGRERA160718000552 Ongoing Raipur Residential Development
alaya villas-anandam world city PCGRERA220618000264 Ongoing Raipur Residential Development
ANANDA PLOTS ,ANANDAM WORLD CITY ,RAIPUR PCGRERA250821001250 New Raipur Residential Plotted Development
ARSHIYA APARTMENT (M2), MIRAYA APARTMENT (M3) PCGRERA230718000620 Ongoing Raipur Mixed Development
COMMERCIAL COMPLEX (C 1) ANANDAM WORLD CITY PCGRERA180718000611 Ongoing Raipur Commercial Development

Details

Registration, professional team, bank, promoters, and compliance history.

Registration Details
RERA Number
PCGRERA220618000298
Status
Ongoing
Project Type
Plotted Development
Approved Date
22 Jun 2018
Original End Date
30 Jun 2018
EWS Category
NO
Construction Cost
₹ 379914000
Land Cost
₹ 371171000
Proposed Completion
26 Aug 2022
Authorised Person
rakesh saraogi
Professional Team
RoleNameLicense / Membership
Statutory CA GURVINDER SINGH CHHABRA 415492
Quarterly CA Akshay Sindhwani 437073
Engineer RAJENDRA JAIN 330/98
Architect shashikant kujur 95221

Location

Project address, coordinates, and nearby places.

Location Details
Address
VILLAGE- LABHANDIH, RAIPUR (C.G.)
District
Raipur
Tehsil
Raipur
Coordinates
21.2549282, 81.6922460 View on Map
Neighborhood Intelligence

Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.

Neighborhood Map 3 km radius
RERA Projects Near ALAYA PLOTS, ANANDAM WORLD CITY 30 found within 3 km
# Project District Status Distance
1 COMMERCIAL COMPLEX (C 1) ANANDAM WORLD CITY Raipur Ongoing 0.03 km
2 ARSHIYA APARTMENT (M2), MIRAYA APARTMENT (M3) Raipur Ongoing 0.11 km
3 ambience nature phase ii Raipur New 0.31 km
4 AMBIENCE NATURE Raipur New 0.33 km
5 ANANDA PLOTS ,ANANDAM WORLD CITY ,RAIPUR Raipur New 0.37 km
6 AASTHA APARTMENT (M7) PHASE-I ANANDAM WORLD CITY Raipur Ongoing 0.45 km
7 pmay of 112(560) dus at labhandi raipur Raipur Ongoing 0.50 km
8 PPMAY OF 203(DUS)) AT LABHANDI RAIPUR Raipur Ongoing 0.60 km
9 aishwarya empire phase - v Raipur Ongoing 0.61 km
10 aishwarya empire phase - i Raipur Ongoing 0.62 km
11 aishwarya empire Raipur Ongoing 0.63 km
12 aishwarya empire phase - iv Raipur Ongoing 0.67 km
13 aishwarya empire phase - iii Raipur Ongoing 0.68 km
14 The riCHmond park Raipur New 0.73 km
15 SWASTIK EAST - 12 Raipur Ongoing 0.76 km
16 Avinash chitwan SE Raipur New 0.86 km
17 CLOUD 9 BLOCK - A Raipur Ongoing 0.91 km
18 PMAY OF (232DUS) AT LABHANDI ,RAIPUR Raipur Ongoing 0.93 km
19 AISHWARYA KINGDOM Raipur Ongoing 0.94 km
20 AMALTAS CASTLE Raipur Ongoing 0.98 km
21 green glory Raipur Ongoing 0.98 km
22 avinash chitwan -phase-1 ,part-2 Raipur New 0.99 km
23 avinash chitwan- 2 Raipur New 1.00 km
24 Avinash CHitwan Phase - 3 Raipur New 1.01 km
25 ONYX- 18 Raipur New 1.02 km
26 CLOUD 9 BLOCK - B Raipur Ongoing 1.03 km
27 WOODS ESTATE PHASE-i Raipur Ongoing 1.05 km
28 woods estate phase- 05 Raipur New 1.05 km
29 WOODS ESTATE PHASE-IV Raipur New 1.06 km
30 woods ville Raipur New 1.07 km

Buyer Checklist

Documents and verifications a buyer should review before purchase.

Buyer Document Verification Checklist

Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.

11/14 verified
  • RERA Registration Certificate Available
    Confirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.
    RERA No: PCGRERA220618000298
  • Promoter Registration Certificate Available
    Builder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
  • Approved Building / Sanction Plan Verify Independently
    Building plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
  • Layout Plan Available
    Approved layout showing plot divisions, roads, open spaces, and common areas.
  • Title Deed / Ownership Proof Available
    Proof that the promoter legally owns the land. Verify via Sub-Registrar records.
  • Encumbrance Certificate Available
    Confirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
  • Land Use / Diversion Certificate Verify Independently
    Required if land was converted from agricultural to non-agricultural use.
  • Architect Certificate Available
    Certification from a registered architect confirming structural plans and compliance.
  • Structural Engineer Certificate Available
    Certification from a structural engineer confirming building safety and load-bearing capacity.
  • CA Financial Certificate Available
    Chartered Accountant certificate on financial status, project cost estimates, and fund utilization.
  • Commencement Certificate Available
    Permission to begin construction issued by the local authority after plan approval.
  • NOCs (No Objection Certificates) Verify Independently
    NOCs from fire department, environment, water supply, electricity board, and other authorities.
  • Project Brochure / Specification Available
    Official brochure with unit types, amenities, and specifications. Compare with actual delivery.
  • RERA Compliance Orders Available
    Check if any orders, penalties, or directions have been issued against this project by RERA.
    5 order(s) on record — review in Legal tab

Risk Zone Within 5 km

Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.

14
Risk zones (within 5 km)
3 km: 4 3–5 km: 9
11
Water bodies (river/nala/lake)
3 km: 2 3–5 km: 9
2
Landfill / waste sites
3 km: 2 3–5 km: 0
1
Airport buffer overlap
3 km: 0 3–5 km: 0
Risk Zone Map (3 km & 5 km rings) Project marker centered
Water Bodies (11)
  • Heerapur Talab ≤3 km
    Pond · 50m buffer
    1.79 km
  • Kharun Left Bank Canal ≤3 km
    Canal · 20m buffer
    2.56 km
  • Telibandha Nala 3–5 km
    Nala · 20m buffer
    3.5 km
  • Telibandha Talab (Marine Drive) 3–5 km
    Lake · 50m buffer
    3.87 km
  • Mahanadi Main Canal 3–5 km
    Canal · 100m buffer
    3.89 km
  • Kharun River 3–5 km
    River · 75m buffer
    3.9 km
  • Dunda Talab 3–5 km
    Pond · 50m buffer
    3.98 km
  • Muktangan Talab 3–5 km
    Tank · 50m buffer
    4.06 km
Landfill / Waste Sites (2)
  • Daldal Seoni MSW Transfer Station ≤3 km
    Transfer station · 100m buffer
    2.83 km
  • SLRM Centre Tendua (Tundra) ≤3 km
    Waste processing · 200m buffer
    2.92 km
Airport (1)
  • Swami Vivekananda Airport 5–10 km
    RPR / VARP · DGCA height limits apply
    9.59 km

Reviews

Verified buyer reviews and ratings for this project.

No reviews yet. Be the first to review this project!

Login to Write a Review

You need to be signed in to submit a review for this project.

Login or Register