CG. DREAM
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Amleshwar South
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Amleshwar South — 13.41 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Amleshwar South. Only parameters with available data are shown below. Based on the latest readings for Amleshwar South.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 23.8 µg/m³ | ≤ 40 |
Good
|
| PM10 | 150.0 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 21.5 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 429 ppm | ≤ 500 |
Good
|
| Fluoride | 0.47 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.6 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 76% | ≥ 80% |
Concern
|
| Drainage Coverage | 53% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 39.0% | 40-70% |
Contextual
|
| Impervious Surface | 16.2% | < 70% |
Good
|
| NDVI Mean | 0.300 | > 0.3 |
Good
|
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 1 | ≥1 |
Good
|
| Schools (1km) | 2 | ≥3 |
Concern
|
| Markets (1km) | 2 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.338 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 52.3% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 38.8% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 2 | Count * 33 (cap 100) |
Weighted 10%
|
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 51.8 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 40.0 dB | ≤ 45.0 dB |
Good
|
| Nearest Highway | 2,007 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Low | Low preferred |
Info
|
| River Flood Risk | Low | Low preferred |
Info
|
| Waterlogging Risk | Low | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.059 | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 29.1°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 63.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 28.0 | 30.3 | 29.1 |
| LST Min (°C) | 12.7 | 8.5 | 10.6 |
| LST Max (°C) | 41.7 | 36.4 | 39.1 |
| LST Score | 68.2 | 58.7 | 63.4 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 31.4% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 68.6% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 24.1% | 38.7% | 31.4% |
| Open Space % | 75.9% | 61.3% | 68.6% |
| Built-up Score | 75.9 | 61.3 | 68.6 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 10.19 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 20.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 13.37 | 7.01 | 10.19 |
| Max Radiance | 19.01 | 22.87 | 20.94 |
| NTL Score | 26.7 | 14.0 | 20.4 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 7.15% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 83.59% | 30% weight |
Scaled against 20%
|
| Water Score | 80.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 7.02% | 7.28% | 7.15% |
| Seasonal Water % | 84.32% | 82.86% | 83.59% |
| Water Score | 24.6 | 25.5 | 80.1 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 2,097.3 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 89.5 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 6,251 | 62,345 | 34,298 |
| Density / km² | 1,989.6 | 2,205.0 | 2,097.3 |
| Pop Density Score | 90.1 | 89.0 | 89.5 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 136.484 | 30% weight |
Scaled
|
| Recharge | 1.04 | 25% weight |
Scaled
|
| PDSI | 2.92 | 20% weight |
Scaled
|
| SM Trend | -15.6686 | 15% weight |
Scaled
|
| Precipitation | 1,803.34 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 139.648 | 133.320 | 136.484 |
| Recharge Estimate | 0.89 | 1.20 | 1.04 |
| PDSI | 2.97 | 2.88 | 2.92 |
| Groundwater Score | 61.9 | 57.4 | 61.3 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 42.5 | < 40 |
Concern
|
| Avg Slope | 2.61° | > 1° |
Good
|
| Avg Impervious | 4.2% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 1 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,529 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Environmental | Roadside waste dump | 1085 m / Medium | Informal waste dumping near road area |
| Accessibility | Far from hospital | 2229 m / Medium | Nearest hospital >5km away |
| Water_drainage | Open drainage channel | 879 m / Low | Uncovered drainage near residential area |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| CG CITY | PCGRERA180718000594 | Ongoing | Durg | Plotted Development |
| cg city phase-2 | PCGRERA200820001134 | New | Durg | Residential Plotted Development |
| CG. CITY ECO | PCGRERA110918000752 | Ongoing | Durg | Residential Development |
| OM SAI RECIDENCY | PCGRERA230718000622 | Ongoing | Durg | Plotted Development |
| UMDA GREENS F-II | PCGRERA110319000933 | New | Durg | Plotted Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA300818000745
- Status
- Ongoing
- Project Type
- Plotted Development
- Approved Date
- 30 Aug 2018
- Original End Date
- 31 Mar 2019
- EWS Category
- NO
- Construction Cost
- ₹ 2000000
- Land Cost
- ₹ 1600000
- Proposed Completion
- 31 Mar 2019
- Authorised Person
- SANJAY AGRAWAL
- Website
- www.skabuildcon.com
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - CHARODA /22, PATAN, DURG (C.G.)
- District
- Durg
- Tehsil
- Patan
- Coordinates
- 21.2093023, 81.4368153 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | KALP GAURAV APARTMENT | Durg | Ongoing | 0.95 km |
| 2 | vitthal puram | Durg | Ongoing | 0.97 km |
| 3 | PMAY OF 145(232)DUS AT BHILAI -3 VITTHALPURAM BHILAI, CHARODA | Durg | Ongoing | 1.03 km |
| 4 | SHREERAM CITY PHASE - II | Durg | Ongoing | 1.27 km |
| 5 | SHREE RAM CITY PHASE- I | Durg | Ongoing | 1.38 km |
| 6 | UMDA GREENS F-II | Durg | New | 1.48 km |
| 7 | pmay for 60(252)umda green site bhilai charoda ,durg | Durg | Ongoing | 1.97 km |
| 8 | pmay for 48 (252) umada bhilai charoda (c.g.) | Durg | Ongoing | 1.99 km |
| 9 | pmay for 144(225) dus umda green bhilai charoda city dist- durg | Durg | Ongoing | 2.00 km |
| 10 | pmay of 282 dus at sirsakala site bhilai charoda city dist. durg | Durg | Ongoing | 2.41 km |
| 11 | SIDDHARTH TOWN | Durg | New | 2.45 km |
| 12 | EVERGREEN CITY | Durg | New | 2.53 km |
| 13 | SIDDHARTH TOWN - 2 | Durg | New | 2.53 km |
| 14 | EVERGREEN CITY | Durg | New | 2.57 km |
| 15 | siddharth town -3 | Durg | New | 2.66 km |
| 16 | Siddharth Town phase -04 | Durg | New | 2.74 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA300818000745
-
Promoter Registration Certificate AvailableBuilder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
Architect Certificate Verify IndependentlyCertification from a registered architect confirming structural plans and compliance.
-
Structural Engineer Certificate Verify IndependentlyCertification from a structural engineer confirming building safety and load-bearing capacity.
-
CA Financial Certificate AvailableChartered Accountant certificate on financial status, project cost estimates, and fund utilization.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
NOCs (No Objection Certificates) AvailableNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.1 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
All Clear
No mapped risk zones within 3 km of this project.
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!