CRONUS
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Kota
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Kota — 0.00 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Kota. Only parameters with available data are shown below. Based on the latest readings for Kota.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 23.7 µg/m³ | ≤ 40 |
Good
|
| PM10 | 106.5 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.7 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 366 ppm | ≤ 500 |
Good
|
| Fluoride | 0.93 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 4.4 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF | ODF++ |
Info
|
| Sewage Coverage | 40% | ≥ 80% |
Concern
|
| Drainage Coverage | 50% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 59.7% | 40-70% |
Contextual
|
| Impervious Surface | 37.0% | < 70% |
Good
|
| NDVI Mean | 0.260 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 57.2% | 62.2% | 59.7% |
| Tree Cover % | 14.3% | 14.4% | 14.4% |
| Urbanization Index | 100.0 | 100.0 | 100.0 |
| Infra Score | 78.1 | 81.0 | 80.6 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 4 | ≥1 |
Good
|
| Schools (1km) | 3 | ≥3 |
Good
|
| Markets (1km) | 4 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.271 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 24.7% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 10.8% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 6 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.249 | 0.292 | 0.271 |
| Vegetation % | 21.3% | 28.1% | 24.7% |
| Dense Green % | 9.9% | 11.6% | 10.8% |
| Tree Canopy % | 12.1% | 13.0% | 12.6% |
| Green Score | 40.3 | 46.4 | 43.4 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 39.2 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 35.1 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 1,608 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | High | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 31.0°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 55.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.8 | 31.2 | 31.0 |
| LST Min (°C) | 20.5 | 21.8 | 21.1 |
| LST Max (°C) | 40.0 | 40.6 | 40.3 |
| LST Score | 56.7 | 55.0 | 55.8 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 59.7% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 40.3% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 57.2% | 62.2% | 59.7% |
| Open Space % | 42.8% | 37.8% | 40.3% |
| Built-up Score | 42.8 | 37.8 | 40.3 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 22.00 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 44.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 22.24 | 21.76 | 22.00 |
| Max Radiance | 35.33 | 33.75 | 34.54 |
| NTL Score | 44.5 | 43.5 | 44.0 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 42.64% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 95.80% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 28.27% | 57.00% | 42.64% |
| Seasonal Water % | 96.54% | 95.06% | 95.80% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 5,874.7 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 70.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 17,675 | 173,131 | 95,403 |
| Density / km² | 5,626.1 | 6,123.2 | 5,874.7 |
| Pop Density Score | 71.9 | 69.4 | 70.6 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 131.119 | 30% weight |
Scaled
|
| Recharge | 2.23 | 25% weight |
Scaled
|
| PDSI | 3.04 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,875.70 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 130.942 | 131.297 | 131.119 |
| Recharge Estimate | 2.40 | 2.06 | 2.23 |
| PDSI | 3.05 | 3.02 | 3.04 |
| Groundwater Score | 63.2 | 63.2 | 63.2 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 53.3 | < 40 |
Concern
|
| Avg Slope | 3.04° | > 1° |
Good
|
| Avg Impervious | 68.4% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 821 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Accessibility | Poor Last-Mile Connectivity | 0 m / Medium | Auto-rickihaws scarce, no ride-hailing coverage |
| Infrastructure | Unpaved Colony Roads - Kota Extension | 200 m / Medium | New colony roads not yet paved by developer |
| Land_zoning | Gas Pipeline Right-of-Way | 200 m / Medium | GAIL gas pipeline passing through colony, buffer zone restrictions |
| Water_drainage | High TDS Borewell Water | 300 m / Medium | Groundwater TDS exceeds 800 ppm (limit: 500) in multiple borewells |
| Environmental | Construction Waste Dumping - Kota Road | 500 m / Low | Debris and waste from nearby construction sites |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA030625001935
- Status
- New
- Project Type
- Commercial Development
- Approved Date
- 03 Jun 2025
- Original End Date
- 10 Oct 2027
- EWS Category
- NO
- Construction Cost
- ₹ 14700000
- Land Cost
- ₹ 3024000
- Proposed Completion
- 10 Oct 2027
- Authorised Person
- Umesh Dang
- Website
- www.dangdevelopersandbuilders.com
| Role | Name | License / Membership |
|---|---|---|
| Quarterly CA | CA ALOK KUMAR AGRAWAL | 413331 |
| Engineer | RACHIT KUMAR PAMNANI | 01 |
| Architect | RACHIT KUMAR PAMNANI | CA/2016/78387 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- KOTA, RAIPUR , CHHATISGARH.
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2584037, 81.6033846 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | saheb society | Raipur | Ongoing | 0.44 km |
| 2 | GOLDEN ARCADE | Raipur | Ongoing | 0.45 km |
| 3 | PMAY OF 576 DUS VILLAGE -KOTA CHIRHULDIH , - RAIPUR | Raipur | Ongoing | 0.55 km |
| 4 | KALPTARU CASITA | Raipur | New | 0.71 km |
| 5 | mansarovar residency | Raipur | Ongoing | 0.93 km |
| 6 | life style empressa | Raipur | Ongoing | 0.94 km |
| 7 | PARK AVENUE | Raipur | New | 0.96 km |
| 8 | maruti life style tower | Raipur | New | 1.03 km |
| 9 | CREST GREENS | Raipur | Ongoing | 1.05 km |
| 10 | ishaan heightS | Raipur | New | 1.17 km |
| 11 | pmay of 280(dus) at kata chirhuldih ,raipur | Raipur | Ongoing | 1.20 km |
| 12 | Avinash Aashiyana Extension | Raipur | New | 1.30 km |
| 13 | construction of 27 no jr mig(3bhk) at phase-4 kabir nagar raipur | Raipur | New | 1.33 km |
| 14 | imperial heights | Raipur | Ongoing | 1.35 km |
| 15 | GULMOHAR PARK | Raipur | Ongoing | 1.44 km |
| 16 | CONSTRUCTION & DEVELOPMNT OF 96 LIG (G+6)&48 EWS (G+6) FLATS AT PHASE-3 KABIR NAGAR RAIPUR | Raipur | New | 1.49 km |
| 17 | ARYAPOLIS | Raipur | Ongoing | 1.54 km |
| 18 | CELEBRITY HOMES | Raipur | Ongoing | 1.74 km |
| 19 | fortune residency | Raipur | New | 1.76 km |
| 20 | sun city | Raipur | Ongoing | 1.88 km |
| 21 | KANCHAN VIHAR PHASE - I | Raipur | Ongoing | 1.91 km |
| 22 | kanchan vihar phase -ii | Raipur | Ongoing | 1.92 km |
| 23 | TIRUPATI ENCLAVE PHASE- II | Raipur | Ongoing | 1.94 km |
| 24 | govinda green | Raipur | New | 1.97 km |
| 25 | TIRUPATI ENCLAVE COMMERCIAL | Raipur | Ongoing | 1.98 km |
| 26 | TIRUPATI ENCLAVE PHASE-03 | Raipur | New | 1.98 km |
| 27 | TIRUPATI ENCLAVE PHASE -I | Raipur | Ongoing | 1.99 km |
| 28 | PIC heightS | Raipur | Ongoing | 2.07 km |
| 29 | RALAS ENCLAVE | Raipur | Ongoing | 2.12 km |
| 30 | PARTHIVI PACIFIC-ROYAL WOODS | Raipur | Ongoing | 2.15 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA030625001935
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
1.14 kmSerikhedi Talab ≤3 kmTank · 50m buffer
-
1.85 kmTatibandh Talab ≤3 kmTank · 50m buffer
-
2.39 kmTatibandh Nala ≤3 kmNala · 20m buffer
-
2.52 kmDevpuri Nala ≤3 kmNala · 20m buffer
-
2.76 kmMaharajband Talab ≤3 kmTank · 50m buffer
-
2.85 kmBhatagaon Nala ≤3 kmNala · 20m buffer
-
3.23 kmKharun Right Bank Canal 3–5 kmCanal · 20m buffer
-
3.37 kmKankali Talab 3–5 kmTank · 50m buffer
-
1.4 kmGudhiyari Old Dump Site ≤3 kmLegacy dump · 500m buffer
-
2.96 kmTatibandh Legacy Dump ≤3 kmLegacy dump · 500m buffer
-
3.12 kmOld Raipur Trenching Ground 3–5 kmInactive landfill · 500m buffer
-
3.97 kmSarora SLRM Centre (Manikanchan Kendra) 3–5 kmWaste processing · 200m buffer
-
4.16 kmJarway Transfer Station 3–5 kmTransfer station · 100m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!