THE ELEMENTS
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Kachna
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Kachna — 0.72 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Kachna. Only parameters with available data are shown below. Based on the latest readings for Kachna.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 32.9 µg/m³ | ≤ 40 |
Good
|
| PM10 | 65.6 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 18.0 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 457 ppm | ≤ 500 |
Good
|
| Fluoride | 0.63 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.5 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF | ODF++ |
Info
|
| Sewage Coverage | 22% | ≥ 80% |
Concern
|
| Drainage Coverage | 32% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 21.6% | 40-70% |
Contextual
|
| Impervious Surface | 14.9% | < 70% |
Good
|
| NDVI Mean | 0.300 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 18.1% | 25.1% | 21.6% |
| Tree Cover % | 18.9% | 13.9% | 16.4% |
| Urbanization Index | 100.0 | 90.9 | 95.4 |
| Infra Score | 59.9 | 60.5 | 60.2 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 6 | ≥3 |
Good
|
| Markets (1km) | 1 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.219 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 32.7% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 17.2% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 0 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.216 | 0.221 | 0.219 |
| Vegetation % | 27.4% | 38.1% | 32.7% |
| Dense Green % | 15.6% | 18.9% | 17.2% |
| Tree Canopy % | 19.3% | 16.8% | 18.1% |
| Green Score | 31.8 | 36.7 | 34.2 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 56.7 dB | ≤ 55.0 dB |
Concern
|
| Night Noise | 45.1 dB | ≤ 45.0 dB |
Concern
|
| Nearest Highway | 1,926 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Highest | Low preferred |
Info
|
| River Flood Risk | High | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 28.2°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 67.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 27.9 | 28.4 | 28.2 |
| LST Min (°C) | -2.6 | -1.3 | -2.0 |
| LST Max (°C) | 39.2 | 40.1 | 39.7 |
| LST Score | 68.2 | 66.2 | 67.2 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 21.6% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 78.4% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 18.1% | 25.1% | 21.6% |
| Open Space % | 81.9% | 74.9% | 78.4% |
| Built-up Score | 81.9 | 74.9 | 78.4 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 19.91 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 39.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 20.39 | 19.42 | 19.91 |
| Max Radiance | 34.32 | 31.41 | 32.87 |
| NTL Score | 40.8 | 38.8 | 39.8 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 57.93% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 95.93% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 72.23% | 43.62% | 57.93% |
| Seasonal Water % | 98.72% | 93.13% | 95.93% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 1,972.6 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 90.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 5,358 | 63,328 | 34,343 |
| Density / km² | 1,705.4 | 2,239.8 | 1,972.6 |
| Pop Density Score | 91.5 | 88.8 | 90.1 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 135.162 | 30% weight |
Scaled
|
| Recharge | 2.48 | 25% weight |
Scaled
|
| PDSI | 3.09 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,860.77 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 134.842 | 135.481 | 135.162 |
| Recharge Estimate | 2.87 | 2.09 | 2.48 |
| PDSI | 3.10 | 3.08 | 3.09 |
| Groundwater Score | 63.9 | 64.0 | 63.9 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 50.9 | < 40 |
Concern
|
| Avg Slope | 2.38° | > 1° |
Good
|
| Avg Impervious | 14.5% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| VARDHMAN SKYLINE - RAIPUR | PCGRERA060618000064 | Ongoing | Raipur | Residential Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA071021001277
- Status
- New
- Project Type
- Residential Development
- Approved Date
- 07 Oct 2021
- Original End Date
- 16 Aug 2026
- EWS Category
- NO
- Construction Cost
- ₹ 583768000
- Land Cost
- ₹ 220507000
- Proposed Completion
- 16 Aug 2026
- Authorised Person
- abhishek bachhawat
- Website
- www.vardhhmanvillas.com/vardhhmanskyline/
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | Akshay Jhawar | 440910 |
| Quarterly CA | shailesh gangwani | 424577 |
| Engineer | MR. RAJENDRA JAIN | RMC330/98 |
| Architect | AR. SHASHIKANT KUJUR | CA/2018/95221 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE- KACHNA , TAHSIL- RAIPUR ,DIST- RAIPUR
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2721762, 81.6997778 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | pmay of 232 dus at green ambience kachana raipur | Raipur | Ongoing | 0.11 km |
| 2 | SUMEET AVENUE | Raipur | New | 0.13 km |
| 3 | THE PARKSYDE PHASE - 1 | Raipur | Ongoing | 0.17 km |
| 4 | The parksyde phase-V | Raipur | New | 0.26 km |
| 5 | wallfort ville phase -2 | Raipur | New | 0.31 km |
| 6 | THE PARKSYDE PHASE - II | Raipur | New | 0.31 km |
| 7 | THE PARKSYDE PHASE - III | Raipur | New | 0.33 km |
| 8 | WALLFORT VILLE PHASE - 1 | Raipur | Ongoing | 0.36 km |
| 9 | wallfort ville phase iii | Raipur | New | 0.40 km |
| 10 | THE PARKSYDE PHASE-IV | Raipur | New | 0.40 km |
| 11 | HUMMING COTERIE | Raipur | New | 0.53 km |
| 12 | HUMMING COTERIE- 02 | Raipur | New | 0.58 km |
| 13 | Humming sanjeeva The promenade | Raipur | New | 0.70 km |
| 14 | mangalam | Raipur | New | 0.78 km |
| 15 | RAJDHANI VIHAR COLONY | Raipur | Ongoing | 0.80 km |
| 16 | avinash chitwan -phase-1 ,part-3 | Raipur | New | 0.86 km |
| 17 | RAMA COMMERCIAL -I | Raipur | New | 0.93 km |
| 18 | HUMMING SANJEEVA PHASE -1 | Raipur | New | 0.93 km |
| 19 | avinash chitwan phase-4 | Raipur | New | 1.02 km |
| 20 | RAHEJA AVANA | Raipur | New | 1.09 km |
| 21 | metro park - 1 | Raipur | New | 1.11 km |
| 22 | RAMA WORLD | Raipur | New | 1.13 km |
| 23 | woods ville | Raipur | New | 1.15 km |
| 24 | AISHWARYA KINGDOM | Raipur | Ongoing | 1.16 km |
| 25 | WOODS ESTATE PHASE-IV | Raipur | New | 1.18 km |
| 26 | avinash chitwan- 2 | Raipur | New | 1.18 km |
| 27 | woods estate phase- 05 | Raipur | New | 1.19 km |
| 28 | WOODS ESTATE PHASE-i | Raipur | Ongoing | 1.21 km |
| 29 | avinash chitwan -phase-1 | Raipur | New | 1.24 km |
| 30 | RAMA WORLD EXTENSION | Raipur | New | 1.24 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA071021001277
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.1 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
3.2 kmHeerapur Talab 3–5 kmPond · 50m buffer
-
3.73 kmKendri Talab 3–5 kmTank · 50m buffer
-
4.32 kmKharun Left Bank Canal 3–5 kmCanal · 20m buffer
-
2.23 kmDaldal Seoni MSW Transfer Station ≤3 kmTransfer station · 100m buffer
-
3.44 kmSLRM Centre Tendua (Tundra) 3–5 kmWaste processing · 200m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!