AVANI AVENUE EXTENSION
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Mowa
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Mowa — 1.06 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Mowa. Only parameters with available data are shown below. Based on the latest readings for Mowa.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 35.3 µg/m³ | ≤ 40 |
Good
|
| PM10 | 100.2 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 12.4 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 385 ppm | ≤ 500 |
Good
|
| Fluoride | 0.54 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 3.4 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 55% | ≥ 80% |
Concern
|
| Drainage Coverage | 65% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 40.7% | 40-70% |
Contextual
|
| Impervious Surface | 18.8% | < 70% |
Good
|
| NDVI Mean | 0.340 | > 0.3 |
Good
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 45.9% | 35.4% | 40.7% |
| Tree Cover % | 29.3% | 31.2% | 30.2% |
| Urbanization Index | 100.0 | 91.3 | 95.6 |
| Infra Score | 75.2 | 69.1 | 72.2 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 1 | ≥1 |
Good
|
| Schools (1km) | 7 | ≥3 |
Good
|
| Markets (1km) | 8 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.248 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 23.6% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 14.0% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 6 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.232 | 0.264 | 0.248 |
| Vegetation % | 20.9% | 26.3% | 23.6% |
| Dense Green % | 11.8% | 16.3% | 14.0% |
| Tree Canopy % | 15.1% | 18.4% | 16.7% |
| Green Score | 39.5 | 45.5 | 42.5 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 54.6 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 49.6 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 1,208 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Highest | Low preferred |
Info
|
| River Flood Risk | High | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 28.6°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 65.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 28.7 | 28.4 | 28.6 |
| LST Min (°C) | 4.9 | 6.2 | 5.6 |
| LST Max (°C) | 39.0 | 38.8 | 38.9 |
| LST Score | 65.3 | 66.3 | 65.8 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 40.7% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 59.4% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 45.9% | 35.4% | 40.7% |
| Open Space % | 54.1% | 64.6% | 59.4% |
| Built-up Score | 54.1 | 64.6 | 59.4 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 15.44 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 30.9 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 14.55 | 16.33 | 15.44 |
| Max Radiance | 25.00 | 26.53 | 25.77 |
| NTL Score | 29.1 | 32.7 | 30.9 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 60.00% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 96.20% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 65.78% | 54.22% | 60.00% |
| Seasonal Water % | 96.40% | 95.99% | 96.20% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 2,976.7 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 85.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 8,526 | 91,592 | 50,059 |
| Density / km² | 2,714.0 | 3,239.4 | 2,976.7 |
| Pop Density Score | 86.4 | 83.8 | 85.1 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 134.057 | 30% weight |
Scaled
|
| Recharge | 2.64 | 25% weight |
Scaled
|
| PDSI | 3.09 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,863.81 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 134.469 | 133.645 | 134.057 |
| Recharge Estimate | 2.94 | 2.34 | 2.64 |
| PDSI | 3.10 | 3.09 | 3.09 |
| Groundwater Score | 63.9 | 63.7 | 63.8 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 52.2 | < 40 |
Concern
|
| Avg Slope | 2.56° | > 1° |
Good
|
| Avg Impervious | 11.1% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,050 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Land_zoning | Unregulated Colonies on Forest Land | 600 m / High | Colonies developed on revenue/forest land without proper clearance |
| Future_threats | Rapid Construction Saturation | 0 m / Medium | Over 50 ongoing construction projects in 2 sq km area |
| Air_pollution | Mowa Flyover Traffic Pollution | 200 m / Medium | Heavy diesel vehicle traffic on NH-53 approach |
| Infrastructure | Internal Road Network Incomplete | 300 m / Medium | Many colony roads unpaved or under heavy construction |
| Water_drainage | New Colony Drainage Incomplete | 400 m / Medium | Several new colonies without proper drainage infrastructure |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| a.g.m. capital homes | PCGRERA150618000205 | Ongoing | Raipur | Plotted Development |
| AVANI AVENUE | PCGRERA130618000129 | Ongoing | Raipur | Plotted Development |
| AVANI AVENUE | PCGRERA130718000524 | Ongoing | Raipur | Residential Development |
| AVANI GREENS | PCGRERA130618000127 | Ongoing | Raipur | Plotted Development |
| CAPITAL CITY PHASE -3 | PCGRERA170718000581 | Ongoing | Raipur | Plotted Development |
| CAPITAL CITY PHASE -3 EXT | PCGRERA170718000578 | Ongoing | Raipur | Plotted Development |
| capital city phase III Extension - 2 | PCGRERA270719001016 | New | Raipur | Plotted Development |
| Capital homes | PCGRERA170323001622 | New | Raipur | Residential Development |
| river county - 01 | PCGRERA210920001144 | Ongoing | Raipur | Residential Plotted Development |
| river county - 02 | PCGRERA061120001158 | Ongoing | Raipur | Residential Plotted Development |
| river county - 03 | PCGRERA061120001157 | Ongoing | Raipur | Residential Plotted Development |
| river county - 04 | PCGRERA131120001160 | Ongoing | Raipur | Residential Plotted Development |
| RIVER COUNTY - 3 | PCGRERA060122001314 | New | Raipur | Residential Development |
| rIVER COUNTY (J-BLOCK) | PCGRERA081024001838 | New | Raipur | Residential Plotted Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA230622001445
- Status
- New
- Project Type
- Residential Plotted Development
- Approved Date
- 23 Jun 2022
- Original End Date
- 22 Oct 2023
- EWS Category
- NO
- Construction Cost
- ₹ 8657000
- Land Cost
- ₹ 20713000
- Proposed Completion
- 22 Oct 2023
- Authorised Person
- vijay nathani
- Website
- www.vgrrealestate.com
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | Amin Khatry | 400840 |
| Quarterly CA | Bhavesh Nanwani | 417630 |
| Engineer | JYOTI MANDAVI | 1117/2019 |
| Architect | MAYANK WADHWA | CA/2015/72725 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - DALDAL SEONI WARD NO-26 KUSHABHAU THAKRE WARDTEHSIL&DIST -RAIPUR
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2860728, 81.6691040 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | AVANI AVENUE | Raipur | Ongoing | 0.02 km |
| 2 | SARVAM | Raipur | Ongoing | 0.09 km |
| 3 | ORCHID VIEWS | Raipur | New | 0.31 km |
| 4 | orchid views | Raipur | New | 0.31 km |
| 5 | raheja homes | Raipur | New | 0.35 km |
| 6 | HARSH PRIDE (PHASE-I) | Raipur | Ongoing | 0.38 km |
| 7 | HARSH PRIDE (PHASE-II) | Raipur | Ongoing | 0.47 km |
| 8 | abhinav city | Raipur | New | 0.77 km |
| 9 | ABHINAV APARTMENT | Raipur | New | 0.84 km |
| 10 | ELITE HOMES -2 | Raipur | New | 0.84 km |
| 11 | ELITE HOME | Raipur | Ongoing | 0.87 km |
| 12 | ASTHA LANDMARK | Raipur | New | 0.90 km |
| 13 | GANPATI TOWER | Raipur | Ongoing | 1.03 km |
| 14 | AISHWARYAM VILLE | Raipur | New | 1.14 km |
| 15 | celino paradise | Raipur | Ongoing | 1.19 km |
| 16 | HARSH HORIZON | Raipur | Ongoing | 1.24 km |
| 17 | DOLPHIN PREMIUM PLAZA | Raipur | Ongoing | 1.25 km |
| 18 | PMAY OF 580 (DUS) AT DALDALSEONI, RAIPUR | Raipur | Ongoing | 1.31 km |
| 19 | ABHINAV SKY | Raipur | Ongoing | 1.33 km |
| 20 | MAPPLE TREE | Raipur | Ongoing | 1.41 km |
| 21 | v.v.d. city | Raipur | New | 1.42 km |
| 22 | aishwarya market | Raipur | Ongoing | 1.57 km |
| 23 | AVINASH SUN CITY | Raipur | Ongoing | 1.59 km |
| 24 | PMAY OF 58(DUS) AT SAMERA, DALDALSEONI, RAIPUR | Raipur | Ongoing | 1.60 km |
| 25 | AVINASH SUN CITY | Raipur | Ongoing | 1.64 km |
| 26 | ORRANGE ATMOSPHERE | Raipur | New | 1.65 km |
| 27 | PMAY OF 145(DUS) AT DALDALSEONI ,RAIPUR | Raipur | Ongoing | 1.68 km |
| 28 | ASHOKA IKON PHASE-I | Raipur | Ongoing | 1.71 km |
| 29 | pmay of 435 dus at daldal seoni raipur | Raipur | Ongoing | 1.72 km |
| 30 | AVINASH CAPITAL HOMES -2 EAXTENSION - III | Raipur | New | 1.75 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA230622001445
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
Architect Certificate AvailableCertification from a registered architect confirming structural plans and compliance.
-
Structural Engineer Certificate AvailableCertification from a structural engineer confirming building safety and load-bearing capacity.
-
NOCs (No Objection Certificates) AvailableNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.22 kmKendri Talab ≤3 kmTank · 50m buffer
-
2.97 kmBoriyakhurd Talab ≤3 kmTank · 50m buffer
-
3.51 kmHeerapur Talab 3–5 kmPond · 50m buffer
-
4.07 kmMowa Nala 3–5 kmNala · 20m buffer
-
4.27 kmKharun River 3–5 kmRiver · 75m buffer
-
4.57 kmKharun Left Bank Canal 3–5 kmCanal · 20m buffer
-
4.6 kmMowa Talab 3–5 kmTank · 50m buffer
-
4.95 kmMuktangan Talab 3–5 kmTank · 50m buffer
-
1.42 kmDaldal Seoni MSW Transfer Station ≤3 kmTransfer station · 100m buffer
-
2.16 kmSLRM Centre Tendua (Tundra) ≤3 kmWaste processing · 200m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!