ELITE HOME
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Mowa
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Mowa — 0.31 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Mowa. Only parameters with available data are shown below. Based on the latest readings for Mowa.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 23.5 µg/m³ | ≤ 40 |
Good
|
| PM10 | 41.0 µg/m³ | ≤ 60 |
Good
|
| NO₂ | 5.5 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 385 ppm | ≤ 500 |
Good
|
| Fluoride | 0.54 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 3.4 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 55% | ≥ 80% |
Concern
|
| Drainage Coverage | 65% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 40.7% | 40-70% |
Contextual
|
| Impervious Surface | 18.8% | < 70% |
Good
|
| NDVI Mean | 0.340 | > 0.3 |
Good
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 45.9% | 35.4% | 40.7% |
| Tree Cover % | 29.3% | 31.2% | 30.2% |
| Urbanization Index | 100.0 | 91.3 | 95.6 |
| Infra Score | 75.2 | 69.1 | 72.2 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 1 | ≥1 |
Good
|
| Schools (1km) | 7 | ≥3 |
Good
|
| Markets (1km) | 8 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.248 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 23.6% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 14.0% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 6 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.232 | 0.264 | 0.248 |
| Vegetation % | 20.9% | 26.3% | 23.6% |
| Dense Green % | 11.8% | 16.3% | 14.0% |
| Tree Canopy % | 15.1% | 18.4% | 16.7% |
| Green Score | 39.5 | 45.5 | 42.5 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 54.6 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 49.6 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 1,208 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Highest | Low preferred |
Info
|
| River Flood Risk | High | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 28.6°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 65.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 28.7 | 28.4 | 28.6 |
| LST Min (°C) | 4.9 | 6.2 | 5.6 |
| LST Max (°C) | 39.0 | 38.8 | 38.9 |
| LST Score | 65.3 | 66.3 | 65.8 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 40.7% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 59.4% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 45.9% | 35.4% | 40.7% |
| Open Space % | 54.1% | 64.6% | 59.4% |
| Built-up Score | 54.1 | 64.6 | 59.4 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 15.44 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 30.9 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 14.55 | 16.33 | 15.44 |
| Max Radiance | 25.00 | 26.53 | 25.77 |
| NTL Score | 29.1 | 32.7 | 30.9 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 60.00% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 96.20% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 65.78% | 54.22% | 60.00% |
| Seasonal Water % | 96.40% | 95.99% | 96.20% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 2,976.7 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 85.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 8,526 | 91,592 | 50,059 |
| Density / km² | 2,714.0 | 3,239.4 | 2,976.7 |
| Pop Density Score | 86.4 | 83.8 | 85.1 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 134.057 | 30% weight |
Scaled
|
| Recharge | 2.64 | 25% weight |
Scaled
|
| PDSI | 3.09 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,863.81 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 134.469 | 133.645 | 134.057 |
| Recharge Estimate | 2.94 | 2.34 | 2.64 |
| PDSI | 3.10 | 3.09 | 3.09 |
| Groundwater Score | 63.9 | 63.7 | 63.8 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 52.2 | < 40 |
Concern
|
| Avg Slope | 2.56° | > 1° |
Good
|
| Avg Impervious | 11.1% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,050 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Land_zoning | Unregulated Colonies on Forest Land | 600 m / High | Colonies developed on revenue/forest land without proper clearance |
| Future_threats | Rapid Construction Saturation | 0 m / Medium | Over 50 ongoing construction projects in 2 sq km area |
| Air_pollution | Mowa Flyover Traffic Pollution | 200 m / Medium | Heavy diesel vehicle traffic on NH-53 approach |
| Infrastructure | Internal Road Network Incomplete | 300 m / Medium | Many colony roads unpaved or under heavy construction |
| Water_drainage | New Colony Drainage Incomplete | 400 m / Medium | Several new colonies without proper drainage infrastructure |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| C.G. ELITE | PCGRERA080618000110 | Ongoing | Raipur | Commercial Development |
| C.G. HEIGHT BLOCK- C | PCGRERA140618000146 | Ongoing | Raipur | Residential Development |
| ELITE HOMES -2 | PCGRERA220822001515 | New | Raipur | Residential Plotted Development |
| ELITE VILLA | PCGRERA120618000119 | Ongoing | Raipur | Residential Development |
| Parampara | PCGRERA090126002025 | New | Raipur | Residential Plotted Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA130618000124
- Status
- Ongoing
- Project Type
- Residential Development
- Approved Date
- 13 Jun 2018
- Original End Date
- 31 Jul 2018
- EWS Category
- NO
- Construction Cost
- ₹ 8187000
- Land Cost
- ₹ 2169000
- Proposed Completion
- 31 Jul 2018
- Authorised Person
- SATISH AGRAWAL
- Website
- www.cgbuildcon.com
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | SUMIT JAIN | 411593 |
| Quarterly CA | SANJEEB KUMAR JAIN | 422298 |
| Engineer | S.K.AGRAWAL | 148/1992 |
| Architect | S.K.AGRAWAL | 148/1992 |
Buildings & Units
Inventory overview, sold/unsold breakdown, and building details.
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2019-07-01 – 2019-09-30 | 23 | 23 | 0 | 0 | 0 |
| 2019-04-01 – 2019-06-30 | 23 | 23 | 0 | 0 | 0 |
| 2019-01-01 – 2019-03-31 | 23 | 0 | 0 | 23 | 0 |
| 2018-10-01 – 2018-12-31 | 23 | 0 | 0 | 0 | 0 |
| 2018-06-13 – 2018-09-30 | 23 | 23 | 0 | 0 | 0 |
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2019-07-01 – 2019-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2019-04-01 – 2019-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2019-01-01 – 2019-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2018-10-01 – 2018-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2018-06-13 – 2018-09-30 | 0 | 0 | 0 | 0 | 0 |
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2019-07-01 – 2019-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2019-04-01 – 2019-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2019-01-01 – 2019-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2018-10-01 – 2018-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2018-06-13 – 2018-09-30 | 0 | 0 | 0 | 0 | 0 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- KUSHABHAU THAKRE WARD, DALDAL SEONI, RAIPUR (C.G.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2788020, 81.6658825 View on Map
Livability of Mowa Raipur
Environmental, infrastructure & amenity parameters for the area where this project is located (0.31 km from project). Each value is compared with the Raipur average.
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | ELITE HOMES -2 | Raipur | New | 0.04 km |
| 2 | GANPATI TOWER | Raipur | Ongoing | 0.18 km |
| 3 | ASTHA LANDMARK | Raipur | New | 0.18 km |
| 4 | HARSH HORIZON | Raipur | Ongoing | 0.37 km |
| 5 | DOLPHIN PREMIUM PLAZA | Raipur | Ongoing | 0.41 km |
| 6 | MAPPLE TREE | Raipur | Ongoing | 0.65 km |
| 7 | celino paradise | Raipur | Ongoing | 0.73 km |
| 8 | HARSH PRIDE (PHASE-II) | Raipur | Ongoing | 0.76 km |
| 9 | HARSH PRIDE (PHASE-I) | Raipur | Ongoing | 0.81 km |
| 10 | ABHINAV SKY | Raipur | Ongoing | 0.86 km |
| 11 | avani avenue extension | Raipur | New | 0.87 km |
| 12 | AVANI AVENUE | Raipur | Ongoing | 0.87 km |
| 13 | aishwarya market | Raipur | Ongoing | 0.87 km |
| 14 | SARVAM | Raipur | Ongoing | 0.95 km |
| 15 | raheja homes | Raipur | New | 0.99 km |
| 16 | orchid views | Raipur | New | 1.08 km |
| 17 | ORCHID VIEWS | Raipur | New | 1.10 km |
| 18 | v.v.d. city | Raipur | New | 1.14 km |
| 19 | ASHOKA IKON PHASE-I | Raipur | Ongoing | 1.23 km |
| 20 | ORRANGE ATMOSPHERE | Raipur | New | 1.29 km |
| 21 | EUPHORIA APARTMENT PHASE (II) | Raipur | Ongoing | 1.32 km |
| 22 | CHANDRA SQUARE | Raipur | Ongoing | 1.33 km |
| 23 | EUPHORIA APARTMENT | Raipur | Ongoing | 1.33 km |
| 24 | abhinav city | Raipur | New | 1.37 km |
| 25 | ORRANGE HIVE | Raipur | Ongoing | 1.45 km |
| 26 | ABHINAV APARTMENT | Raipur | New | 1.46 km |
| 27 | luxora & edge | Raipur | Ongoing | 1.47 km |
| 28 | ORRANGE COUNTY | Raipur | Ongoing | 1.51 km |
| 29 | ASHOKA KOHINOOR PHASE-II | Raipur | New | 1.83 km |
| 30 | ADITYA HEIGHTS | Raipur | Ongoing | 1.99 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA130618000124
-
Promoter Registration Certificate AvailableBuilder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.81 kmKendri Talab ≤3 kmTank · 50m buffer
-
2.21 kmBoriyakhurd Talab ≤3 kmTank · 50m buffer
-
2.81 kmHeerapur Talab ≤3 kmPond · 50m buffer
-
3.4 kmKharun River 3–5 kmRiver · 75m buffer
-
3.75 kmMowa Nala 3–5 kmNala · 20m buffer
-
3.78 kmKharun Left Bank Canal 3–5 kmCanal · 20m buffer
-
4.08 kmMuktangan Talab 3–5 kmTank · 50m buffer
-
4.22 kmTelibandha Nala 3–5 kmNala · 20m buffer
-
1.35 kmSLRM Centre Tendua (Tundra) ≤3 kmWaste processing · 200m buffer
-
1.36 kmDaldal Seoni MSW Transfer Station ≤3 kmTransfer station · 100m buffer
Documents
RERA-filed documents and disclosures available for this project.
ARCH (4)
AminitiesPHOTO (6)
BRIEF (1)
CA (7)
COM (4)
ENGG (4)
ENUM (1)
FEESHEET (1)
LAYOUT (1)
PASSBOOK (1)
PHOTO (1)
PLOTPHOTO (36)
PSPEC (1)
Reg (1)
SEARCH (1)
SELF (1)
TAC (1)
other (4)
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!
Log in to see the full page
This page shows a preview. Sign in (or create a free account) to unlock the full content, charts, and downloads.
Log in Create account