SRISHTI'S IMPERIA PHASE III
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Khamardih
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Khamardih — 0.00 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Khamardih. Only parameters with available data are shown below. Based on the latest readings for Khamardih.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 30.8 µg/m³ | ≤ 40 |
Good
|
| PM10 | 134.0 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 14.0 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 328 ppm | ≤ 500 |
Good
|
| Fluoride | 0.68 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 3.6 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 52% | ≥ 80% |
Concern
|
| Drainage Coverage | 62% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 65.1% | 40-70% |
Contextual
|
| Impervious Surface | 26.0% | < 70% |
Good
|
| NDVI Mean | 0.270 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 75.5% | 54.7% | 65.1% |
| Tree Cover % | 12.4% | 18.9% | 15.6% |
| Urbanization Index | 100.0 | 100.0 | 100.0 |
| Infra Score | 78.4 | 78.7 | 79.9 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 3 | ≥3 |
Good
|
| Markets (1km) | 3 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.251 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 28.6% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 16.6% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 1 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.206 | 0.296 | 0.251 |
| Vegetation % | 27.0% | 30.2% | 28.6% |
| Dense Green % | 11.3% | 21.9% | 16.6% |
| Tree Canopy % | 13.2% | 22.3% | 17.8% |
| Green Score | 32.4 | 44.8 | 38.6 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 54.0 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 48.9 dB | ≤ 45.0 dB |
Concern
|
| Nearest Highway | — m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Highest | Low preferred |
Info
|
| River Flood Risk | High | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 29.1°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 63.5 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 29.1 | 29.2 | 29.1 |
| LST Min (°C) | 3.1 | 5.5 | 4.3 |
| LST Max (°C) | 39.9 | 40.0 | 39.9 |
| LST Score | 63.6 | 63.4 | 63.5 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 65.1% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 34.9% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 75.5% | 54.7% | 65.1% |
| Open Space % | 24.6% | 45.3% | 34.9% |
| Built-up Score | 24.6 | 45.3 | 34.9 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 25.29 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 50.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 25.87 | 24.71 | 25.29 |
| Max Radiance | 45.76 | 38.91 | 42.34 |
| NTL Score | 51.7 | 49.4 | 50.6 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 65.43% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 96.78% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 64.25% | 66.60% | 65.43% |
| Seasonal Water % | 96.25% | 97.31% | 96.78% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 6,117.5 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 69.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 21,857 | 149,223 | 85,540 |
| Density / km² | 6,957.2 | 5,277.7 | 6,117.5 |
| Pop Density Score | 65.2 | 73.6 | 69.4 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 134.670 | 30% weight |
Scaled
|
| Recharge | 2.52 | 25% weight |
Scaled
|
| PDSI | 3.08 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,865.74 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 134.642 | 134.698 | 134.670 |
| Recharge Estimate | 3.10 | 1.94 | 2.52 |
| PDSI | 3.10 | 3.06 | 3.08 |
| Groundwater Score | 63.9 | 63.8 | 63.8 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 55.8 | < 40 |
Concern
|
| Avg Slope | 2.92° | > 1° |
Good
|
| Avg Impervious | 74.7% | < 70% |
Concern
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,351 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Water_drainage | Railway Track Depression Flooding | 200 m / Critical | Area near railway underpass floods during any significant rain |
| Environmental | Khamardih Open Dumping Ground | 300 m / Critical | Large informal garbage dump near railway tracks |
| Infrastructure | Partial Sewerage Coverage Only | 0 m / High | Only 40% area connected to underground sewer network |
| Land_zoning | Railway Land Dispute | 100 m / High | Colony built on disputed railway land parcels |
| Environmental | Multiple Sewer Overflow Points | 150 m / High | Aging sewer infrastructure causing frequent overflows |
| Air_pollution | Railway Crossing Traffic Jam | 200 m / Medium | Extended idle time at railway crossing increasing vehicle emissions |
| Safety_social | Railway Station Area Crime | 300 m / Medium | Station vicinity with higher crime rate |
| Health_nuisance | Small-Scale Leather Works | 500 m / Medium | Unauthorized small leather processing units causing odor |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| SHRISTI'S PALAZZO | PCGRERA050618000032 | Ongoing | Raipur | Residential Development |
| SRISHTI'S IMPERIA PHASE-V | PCGRERA250326002071 | New | Raipur | Residential Plotted Development |
| srishtis imperia phase - 2 | PCGRERA190922001519 | New | Raipur | Residential Development |
| SRISHTIS IMPERIA PHASE IV | PCGRERA290125001873 | New | Raipur | Residential Plotted Development |
| srishtis imperia phase-1 | PCGRERA120321001209 | New | Raipur | Residential Plotted Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA170823001659
- Status
- Ongoing
- Project Type
- Residential Development
- Approved Date
- 17 Aug 2023
- Original End Date
- 27 Apr 2028
- EWS Category
- NO
- Construction Cost
- ₹ 86923000
- Land Cost
- ₹ 24878000
- Proposed Completion
- 27 Apr 2028
- Authorised Person
- satendra agrawal
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | Amin Khatry | 400840 |
| Quarterly CA | Bhavesh Nanwani | 417630 |
| Engineer | MR. YESH KUMAR JAIN | 525/2009 |
| Architect | MR. AVIK GOYAL | CA/2017/87366 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE-SHANKER NAGAR,KHAMHARDIH, MAHARSHI WALMIKI WARD NO-32 TEHSIL-RAIPUR,DIST-RAIPUR
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2555895, 81.6704511 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | ASHOKA KOHINOOR PHASE - 2 | Raipur | Ongoing | 0.21 km |
| 2 | ASHOKA IKON PHASE - 2 | Raipur | Ongoing | 0.26 km |
| 3 | BANYAN TREE ENCLAVE | Raipur | Ongoing | 0.35 km |
| 4 | RAMAYAN LIFE STYLE RESIDENCY | Raipur | Ongoing | 0.51 km |
| 5 | high park phase- i | Raipur | New | 0.54 km |
| 6 | high park phase - 2 | Raipur | New | 0.60 km |
| 7 | VIP KARISHMA-III-APARTMENTS | Raipur | Ongoing | 0.61 km |
| 8 | ASHOKA ROYAL - C | Raipur | Ongoing | 0.69 km |
| 9 | A.T. CLASSIC | Raipur | Ongoing | 0.71 km |
| 10 | shri krishna vatika | Raipur | New | 0.87 km |
| 11 | ASHOKA KOHINOOR PHASE-II | Raipur | New | 0.89 km |
| 12 | OFFICE CUM RESIDENTIAL COMPLEX | Raipur | New | 0.90 km |
| 13 | VIP - avenue , VIP ESTATE | Raipur | New | 0.91 km |
| 14 | bhardwaj sky | Raipur | New | 0.91 km |
| 15 | sai simran bhawna nagar | Raipur | Ongoing | 0.92 km |
| 16 | SRISHTIS IMPERIA PHASE IV | Raipur | New | 0.97 km |
| 17 | Bhardwaj sky phase ii | Raipur | New | 0.98 km |
| 18 | srishtis imperia phase-1 | Raipur | New | 1.01 km |
| 19 | JEEVAN PARISAR | Raipur | Ongoing | 1.01 km |
| 20 | USHA ESTATES | Raipur | New | 1.08 km |
| 21 | V3 ASHIYANA | Raipur | New | 1.08 km |
| 22 | Samriddhi atlantis | Raipur | New | 1.11 km |
| 23 | SAMRIDDHI ATLANTIS PHASE-2 | Raipur | New | 1.13 km |
| 24 | Sanman Homz | Raipur | New | 1.15 km |
| 25 | AGRASAR PRIDE | Raipur | Ongoing | 1.17 km |
| 26 | the address | Raipur | New | 1.21 km |
| 27 | "SHRIJAN" PREMIUM | Raipur | Ongoing | 1.23 km |
| 28 | ARYA'S VIP CUBE | Raipur | Ongoing | 1.23 km |
| 29 | METRO HEXA | Raipur | New | 1.34 km |
| 30 | green glory | Raipur | Ongoing | 1.36 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA170823001659
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.48 kmHeerapur Talab ≤3 kmPond · 50m buffer
-
1.18 kmKharun Left Bank Canal ≤3 kmCanal · 20m buffer
-
1.72 kmKharun River ≤3 kmRiver · 75m buffer
-
1.84 kmTelibandha Nala ≤3 kmNala · 20m buffer
-
2.09 kmMuktangan Talab ≤3 kmTank · 50m buffer
-
2.19 kmTelibandha Talab (Marine Drive) ≤3 kmLake · 50m buffer
-
2.71 kmBoriyakhurd Talab ≤3 kmTank · 50m buffer
-
3.34 kmShankar Nagar Nala 3–5 kmNala · 20m buffer
-
1.28 kmSLRM Centre Tendua (Tundra) ≤3 kmWaste processing · 200m buffer
-
2.55 kmDaldal Seoni MSW Transfer Station ≤3 kmTransfer station · 100m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!