You're viewing a preview. Log in or create a free account to see the full page.
RealEstateIQTM
IN हिन्दी
Want a full project intelligence report? Download a detailed PDF report — RERA compliance, promoter, financials, amenities, location & risk.
Generate Project Report
Home / RERA Projects / PMAY FOR 309 DUS AT RISALI, DURG
ONGOING Residential Development RERA Page Project Website

PMAY FOR 309 DUS AT RISALI, DURG

Compliance Status
Compliant
21.1607, 81.3469 Explore area
District
Durg
Area
Durg
Promoter
MUNICIPAL CORPORATION RISALI
Project Information
Promoter MUNICIPAL CORPORATION RISALI
Type Residential Development
Status Ongoing
Completion 13 Jun 2027
Registered 16 Feb 2022
Original End 13 Feb 2027
Total Units 309
EWS Category YES
Construction Cost ₹ 145188000
Land Cost ₹ 300000
Authorised Person ashish dewangan
Address village- risali, tahsil- durg, dist- durg (c.g.)
At a Glance
309
Total Units
-
Units Sold
-
Unsold
0
Legal Cases
Jun 2027
Target Completion
11%
Completion
Amenities & Facilities (9)
BOUNDARY WALL
0%
INTERNAL ROADS AND FOOTPATHS
0%
LANDSCAPING AND TREE PLANTING
0%
OPEN PARKING
0%
SEWERAGE
0%
STORM WATER DRAINS
0%
STREET LIGHTING
0%
WATER CONSERVATION RAIN WATER HARVESTING
0%
WATER SUPPLY
0%
Project Professionals
CA SUMIT KUMAR BHIWANIWALA
STATUTORY CA
TRIPURARI SHARAN JHA
QUARTERLY CA
SAVJANI A&E CONSULTANT
ENGINEER
SAVJANI A&E CONSULTANT
ARCHITECT
Project Analysis

360° Project Intelligence

Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.

Area Livability

Livability of Risali

Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Risali — 1.21 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.



🏠 Livability Parameters

Latest readings for Risali. Only parameters with available data are shown below. Based on the latest readings for Risali.

B
Composite Score
67.3 /100
Good

🌬️ Air Quality

Final Score: 46.0/100 ↑ Higher is Better
ℹ️ What is Air Quality?AQI summarizes PM2.5, PM10 and gases. Lower pollution values improve public health outcomes.
AQI
54
Satisfactory
PM2.5
11.1 µg/m³
≤ 40
PM10
36.0 µg/m³
≤ 60
Scoring Breakdown
ParameterValueTarget / RuleStatus
PM2.5 11.1 µg/m³ ≤ 40
Good
PM10 36.0 µg/m³ ≤ 60
Good
NO₂ 14.0 µg/m³ ≤ 40
Good
💡 What does this mean for you?Cleaner air lowers respiratory burden and improves outdoor comfort.

💧 Water Quality

Final Score: 75.0/100 ↑ Higher is Better
ℹ️ What is Water Quality?Water quality combines chemistry, supply duration and contamination markers.
TDS
300 ppm
≤ 500
pH
7.30
6.5–8.5
Supply
6.0 hr/day
≥ 8 hr
Scoring Breakdown
ParameterValueTarget / RuleStatus
TDS 300 ppm ≤ 500
Good
Fluoride 0.60 mg/L ≤ 1.0
Good
Turbidity 3.0 NTU ≤ 1
Concern
💡 What does this mean for you?Better supply quality and consistency reduces dependence on tanker/groundwater fallback.

🧹 Sanitation

Final Score: 65.8/100 ↑ Higher is Better
ℹ️ What is Sanitation?Sanitation reflects ODF status, sewage treatment and waste management regularity.
ODF
ODF+
ODF++
Sewage Coverage
55%
≥ 80%
Drainage
60%
≥ 90%
Scoring Breakdown
ParameterValueTarget / RuleStatus
ODF Status ODF+ ODF++
Info
Sewage Coverage 55% ≥ 80%
Concern
Drainage Coverage 60% ≥ 90%
Concern
💡 What does this mean for you?Higher sanitation maturity lowers disease exposure and neighborhood nuisance.

🛣️ Infrastructure

Final Score: 67.4/100 ↑ Higher is Better
ℹ️ What is Infrastructure?Infrastructure score combines land use, urbanization, built form, night lights and terrain indicators.
Built-up
56.4%
Balanced band
Tree Cover
11.2%
≥ 15%
Urbanization
90.2
Higher better
Scoring Breakdown
ParameterValueTarget / RuleStatus
Built-up (LULC) 56.4% 40-70%
Contextual
Impervious Surface 28.9% < 70%
Good
NDVI Mean 0.240 > 0.3
Concern
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Built-up (LULC) % 76.5% 36.2% 56.4%
Tree Cover % 3.6% 18.8% 11.2%
Urbanization Index 98.9 81.5 90.2
Infra Score 73.1 61.7 71.4
💡 What does this mean for you?Balanced built + green mix usually improves long-term livability resilience.

🏥 Amenities

Final Score: 86.4/100 ↑ Higher is Better
ℹ️ What is Amenities?Amenity score captures daily-access services in walk/short-drive radii.
Hospitals 500m
5
Target ≥1
Schools 1km
20
Target ≥3
Parks 500m
5
Target ≥1
Scoring Breakdown
ParameterValueTarget / RuleStatus
Hospitals (500m) 5 ≥1
Good
Schools (1km) 20 ≥3
Good
Markets (1km) 20 ≥1
Good
💡 What does this mean for you?Higher local amenity density improves convenience and walkability.

🌳 Green Cover

Final Score: 47.2/100 ↑ Higher is Better
ℹ️ What is Green Cover?NDVI and vegetation structure are measured from satellite imagery to estimate neighborhood greenery.
NDVI Mean
0.198
Greenness index
Vegetation
45.2%
% green pixels
Dense Green
0.8%
Thick canopy
Scoring Breakdown
ParameterValueTarget / RuleStatus
NDVI Mean 0.198 0.5 maps to score 100
Weighted 40%
Vegetation % 45.2% Direct % (cap 100)
Weighted 30%
Dense Green % 0.8% Scaled from 50%
Weighted 20%
Parks within 500m 5 Count * 33 (cap 100)
Weighted 10%
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
NDVI Mean 0.174 0.222 0.198
Vegetation % 27.7% 62.7% 45.2%
Dense Green % 0.0% 1.5% 0.8%
Tree Canopy % 0.0% 1.1% 0.6%
Green Score 32.2 47.2 39.7
💡 What does this mean for you?Higher green metrics typically reduce heat stress and improve comfort.

🔊 Noise

Final Score: 77.2/100 ↑ Higher is Better
ℹ️ What is Noise?Noise uses measured day/night dB compared to CPCB zone limits.
Day dB
47.7
vs CPCB day limit
Night dB
42.3
vs CPCB night limit
Zone
commercial
CPCB class
Scoring Breakdown
ParameterValueTarget / RuleStatus
Day Noise 47.7 dB ≤ 65.0 dB
Good
Night Noise 42.3 dB ≤ 55.0 dB
Good
Nearest Highway — m Higher usually quieter
Info
💡 What does this mean for you?Chronic high noise impacts stress, sleep quality and perceived comfort.

🌊 Flood Risk

Final Score: 72.5/100 ↑ Higher is Better
ℹ️ What is Flood Risk?Flood risk combines river exposure and local waterlogging vulnerability.
Overall Risk
Low
Lower is safer
River Risk
Low
Lower is safer
Waterlogging
Low-Medium
Lower is safer
Scoring Breakdown
ParameterValueTarget / RuleStatus
Overall Risk Low Low preferred
Info
River Flood Risk Low Low preferred
Info
Waterlogging Risk Low-Medium Low preferred
Info
💡 What does this mean for you?Lower flood risk means less disruption and lower hazard exposure.

🏚️ Earthquake Risk

Final Score: 90.0/100 ↑ Higher is Better
ℹ️ What is Earthquake Risk?Earthquake profile uses seismic zone, PGA and soil/liquefaction risk factors.
Seismic Zone
Zone II
Lower risk zone preferred
Risk Level
Low
Low preferred
Liquefaction
None
Low preferred
Scoring Breakdown
ParameterValueTarget / RuleStatus
Seismic Zone Zone II II preferred
Info
Risk Level Low Low preferred
Info
PGA (475yr) 0.0155g Lower preferred
Info
💡 What does this mean for you?Lower seismic hazard reduces structural and insurance risk exposure.

🌡️ Land Surface Temp

Final Score: 59.8/100 ↑ Higher is Better
ℹ️ What is Land Surface Temp?Land Surface Temperature reflects heat-island intensity from satellite thermal bands.
LST Mean
30.1°C
Lower better
LST Min
15.7°C
Context
LST Max
40.8°C
Lower better
Scoring Breakdown
ParameterValueTarget / RuleStatus
LST Mean 30.1°C 20°C best / 45°C worst
Weighted by formula
LST Score 59.8 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
LST Mean (°C) 30.2 29.9 30.1
LST Min (°C) 16.5 14.8 15.7
LST Max (°C) 41.2 40.3 40.8
LST Score 59.3 60.2 59.8
💡 What does this mean for you?Higher heat exposure affects comfort, cooling load and health risk.

🏗️ Built-up Density

Final Score: 43.6/100 ↑ Higher is Better
ℹ️ What is Built-up Density?Built-up density measures extent of developed surface versus open space.
Built-up %
76.5%
Lower better
Open Space %
23.5%
Higher better
Built-up Score
23.5
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Built-up % 76.5% Inverse scoring
Score = 100 - builtup%
Open Space % 23.5% Context
Info
💡 What does this mean for you?Very high built-up often raises heat and runoff while reducing open environmental buffers.

💡 Night-time Lights

Final Score: 33.2/100 ↑ Higher is Better
ℹ️ What is Night-time Lights?Nighttime lights are a proxy for economic activity and electrification intensity.
Avg Radiance
16.62
Higher better
Max Radiance
24.95
Context
NTL Score
33.2
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Avg Radiance 16.62 Scaled to 50
Score = min(100, avg/50*100)
NTL Score 33.2 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Avg Radiance 19.07 14.16 16.62
Max Radiance 28.45 21.46 24.95
NTL Score 38.1 28.3 33.2
💡 What does this mean for you?Higher radiance often indicates stronger urban activity but can correlate with light pollution.

🏞️ Water Bodies

Final Score: 100.0/100 ↑ Higher is Better
ℹ️ What is Water Bodies?Water-bodies score reflects permanent and seasonal water presence in the analysis radius.
Permanent Water
72.21%
Higher generally better
Seasonal Water
98.38%
Context
Water Score
100.0
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Permanent Water % 72.21% 70% weight
Scaled against 10%
Seasonal Water % 98.38% 30% weight
Scaled against 20%
Water Score 100.0 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Permanent Water % 60.11% 84.30% 72.21%
Seasonal Water % 97.93% 98.82% 98.38%
Water Score 100.0 100.0 100.0
💡 What does this mean for you?Water presence can support cooling, recharge and ecological quality.

👥 Population Density

Final Score: 71.1/100 ↑ Higher is Better
ℹ️ What is Population Density?Population density indicates urban crowding pressure around the area.
Population
66,025
Estimated residents
Density/km²
5,785.4
Lower better for this score
Score
71.1
0-100
Scoring Breakdown
ParameterValueTarget / RuleStatus
Density/km² 5,785.4 Inverse scale up to 20,000
Lower -> higher score
Score 71.1 0-100
Computed
Side-by-Side: 1000m vs 3000m Comparison
Parameter 1000m 3000m Average (Final)
Population Total 24,388 107,661 66,025
Density / km² 7,763.0 3,807.7 5,785.4
Pop Density Score 61.2 81.0 71.1
💡 What does this mean for you?Extremely high density can increase pressure on services and mobility.

🚶 Walkability & Safety

↑ Higher is Better
ℹ️ What is Walkability & Safety?OSM amenity metrics reflect pedestrian, safety and urban accessibility infrastructure.
Footpaths
0
Higher better
Street Lamps
0
Higher better
Police/Fire Access
0
Presence
Scoring Breakdown
ParameterValueTarget / RuleStatus
Footpaths (500m) 0 ≥ 3
Concern
Sidewalk Roads (1km) 0 ≥ 5
Concern
Nearest Police Station — m ≤ 2000m
Context
💡 What does this mean for you?Higher OSM accessibility/safety features generally improve everyday livability.

🌬️ Air Quality: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

💧 Water Quality: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🧹 Sanitation: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🛣️ Infrastructure: Infrastructure Score Formula

Formula: Composite weighted model from GHSL/ESA/VIIRS/Terrain features
ComponentValueWeight/RuleContribution
Urbanization index90.2120%SMOD
Built-up balance56.4%15%Best in moderate band
NTL stability65.0%15%Power/activity consistency
Avg building height5.09 m10%Vertical infra proxy
Impervious %28.9%10%Moderate is optimal
Radiance17.4010%Development proxy
Slope0.10°10%Flatter is better
Green support11.2%10%Tree + grass contribution
This is the same weighted structure used in Livability Infrastructure model.
Final: 71.35 / 100

🏥 Amenities: Amenity Score Breakdown

Formula: Each amenity category is capped at 100, final score is averaged across categories
ComponentValueWeight/RuleContribution
Hospitals 500m5 * 33Cap 100Health access
Schools 1km20 * 20Cap 100Education access
Markets 1km20 * 33Cap 100Daily needs
Parks 500m5 * 33Cap 100Open space
Transit 1km0 * 50Cap 100Mobility
Category multipliers mirror the Livability snapshot logic.
Final: Final from amenity_scores table

🌳 Green Cover: Green Score Formula

Formula: Score = (NDVI*40%) + (Vegetation*30%) + (Dense Green*20%) + (Parks*10%)
ComponentValueWeight/RuleContribution
NDVI component0.198 => 39.640%15.8
Vegetation component45.2% => 45.230%13.6
Dense green component0.8% => 1.620%0.3
Parks component5 => 100.010%10.0
This matches the Livability GreenCover model weighting logic.
Final: 39.71 / 100

🔊 Noise: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🌊 Flood Risk: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🏚️ Earthquake Risk: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

🌡️ Land Surface Temp: LST Score Formula

Formula: Score = ((45 - LST Mean) / 25) * 100, clipped to [0,100]
ComponentValueWeight/RuleContribution
LST Mean30.06 °CReference20°C best, 45°C worst
Lower land surface temperature means better livability.
Final: 59.76 / 100

🏗️ Built-up Density: Built-up Score Formula

Formula: Score = 100 - Built-up %
ComponentValueWeight/RuleContribution
Built-up %76.5%InverseLower is better
Dense concrete surfaces reduce infiltration and increase heat islands.
Final: 23.51 / 100

💡 Night-time Lights: Night-time Lights Formula

Formula: Score = min(100, (Avg Radiance / 50) * 100)
ComponentValueWeight/RuleContribution
Avg Radiance16.62Scale 0-50Higher indicates activity
Higher night radiance generally tracks electrification and economic intensity.
Final: 33.23 / 100

🏞️ Water Bodies: Water Bodies Score Formula

Formula: Score = (Permanent Water Score * 70%) + (Seasonal Water Score * 30%)
ComponentValueWeight/RuleContribution
Permanent water72.21%70%Scaled against 10% benchmark
Seasonal water98.38%30%Scaled against 20% benchmark
Permanent water has higher score weight than seasonal water.
Final: 100.00 / 100

👥 Population Density: Population Density Formula

Formula: Score = ((20000 - density_per_km²) / 20000) * 100, clipped to [0,100]
ComponentValueWeight/RuleContribution
Density5,785.4 /km²Inverse scaleLower density -> higher score
This follows the Livability PopulationDensity model.
Final: 71.07 / 100

🚶 Walkability & Safety: Score Source

Formula: Score is taken from latest area_scores snapshot for this area.
ComponentValueWeight/RuleContribution
Sourcearea_scores (latest by score_date)PipelineWeighted model in backend
Use this info with the panel breakdown values and thresholds.
Final: See card score

View full livability report for Risali →

Compliance Status

RERA registration, filings, and compliance flags based on public CG-RERA records.

Compliance Status Based on public CG-RERA records
4 Passed
2 N/A
RERA Registration Active
Reg No. PCGRERA160222001341 — Status: Ongoing
No RERA Orders
No complaints or orders found against this project
Sec 38–63 · Source
No Orders in Last 12 Months
Clean record — no complaints or orders filed
Within Timeline
Target completion: 13 Jun 2027
Section 4 · Source
Quarterly Updates Not Available
No compliance snapshot data on record
Section 11 · Source
Annual Audit Not Available
No compliance snapshot data on record
Section 4(2)(l)(D) · Source
Each check is based on publicly available CG-RERA portal data as of Nov 2026. How this works →
Other Projects by Same Promoter (1)
ProjectRERA No.StatusDistrictType
PMAY FOR 812 DUs at risali, durg PCGRERA160222001340 Ongoing Durg Residential Development

Details

Registration, professional team, bank, promoters, and compliance history.

Registration Details
RERA Number
PCGRERA160222001341
Status
Ongoing
Project Type
Residential Development
Approved Date
16 Feb 2022
Original End Date
13 Feb 2027
EWS Category
YES
Construction Cost
₹ 145188000
Land Cost
₹ 300000
Proposed Completion
13 Jun 2027
Authorised Person
ashish dewangan
Professional Team
RoleNameLicense / Membership
Statutory CA CA SUMIT KUMAR BHIWANIWALA 139779
Quarterly CA TRIPURARI SHARAN JHA 312441
Engineer Savjani A&E consultant ER1388110924
Architect Savjani A&E consultant ER1388110924
Promoters
M
municipal corporation risali Government/Semi Government Agency

Buildings & Units

Inventory overview, sold/unsold breakdown, and building details.

Inventory Overview
309
Total Inventory
0
Sold (0%)
0
Unsold (0%)
309
Mortgage (100%)
100%
Sold Unsold Mortgage
Quarterly Plot Updates
PeriodTotalSold (prev)Sold (qtr)RemainingMortgage
2026-04-01 – 2026-06-30 0 0 0 0 0
2026-01-01 – 2026-03-31 0 0 0 0 0
2025-10-01 – 2025-12-31 0 0 0 0 0
2025-07-01 – 2025-09-30 0 0 0 0 0
2025-04-01 – 2025-06-30 0 0 0 0 0
2025-01-01 – 2025-03-31 0 0 0 0 0
2024-10-01 – 2024-12-31 0 0 0 0 0
2024-07-01 – 2024-09-30 0 0 0 0 0
2024-04-01 – 2024-06-30 0 0 0 0 0
2024-01-01 – 2024-03-31 0 0 0 0 0
2023-10-01 – 2023-12-31 0 0 0 0 0
2023-07-01 – 2023-09-30 0 0 0 0 0
2023-04-01 – 2023-06-30 0 0 0 0 0
2023-01-01 – 2023-03-31 0 0 0 0 0
2022-10-01 – 2022-12-31 0 0 0 0 0
2022-07-01 – 2022-09-30 0 0 0 0 0
2022-04-01 – 2022-06-30 0 0 0 0 0
2022-01-01 – 2022-03-31 0 0 0 0 0
Quarterly Building Updates
PeriodTotalSold (prev)Sold (qtr)RemainingMortgage
2026-04-01 – 2026-06-30 0 0 0 0 0
2026-01-01 – 2026-03-31 0 0 0 0 0
2025-10-01 – 2025-12-31 0 0 0 0 0
2025-07-01 – 2025-09-30 0 0 0 0 0
2025-04-01 – 2025-06-30 0 0 0 0 0
2025-01-01 – 2025-03-31 0 0 0 0 0
2024-10-01 – 2024-12-31 0 0 0 0 0
2024-07-01 – 2024-09-30 0 0 0 0 0
2024-04-01 – 2024-06-30 0 0 0 0 0
2024-01-01 – 2024-03-31 0 0 0 0 0
2023-10-01 – 2023-12-31 0 0 0 0 0
2023-07-01 – 2023-09-30 0 0 0 0 0
2023-04-01 – 2023-06-30 0 0 0 0 0
2023-01-01 – 2023-03-31 0 0 0 0 0
2022-10-01 – 2022-12-31 0 0 0 0 0
2022-07-01 – 2022-09-30 0 0 0 0 0
2022-04-01 – 2022-06-30 0 0 0 0 0
2022-01-01 – 2022-03-31 0 0 0 0 0
Quarterly Apartment Updates
PeriodTotalSold (prev)Sold (qtr)RemainingMortgage
2026-04-01 – 2026-06-30 309 0 0 309 309
2026-01-01 – 2026-03-31 309 0 0 309 309
2025-10-01 – 2025-12-31 309 0 0 309 309
2025-07-01 – 2025-09-30 309 0 0 309 309
2025-04-01 – 2025-06-30 309 0 0 309 309
2025-01-01 – 2025-03-31 309 0 0 309 309
2024-10-01 – 2024-12-31 309 0 0 309 309
2024-07-01 – 2024-09-30 309 0 0 309 309
2024-04-01 – 2024-06-30 309 0 0 309 309
2024-01-01 – 2024-03-31 309 0 0 309 309
2023-10-01 – 2023-12-31 145 0 0 145 0
2023-07-01 – 2023-09-30 145 0 0 145 0
2023-04-01 – 2023-06-30 145 0 0 145 0
2023-01-01 – 2023-03-31 145 0 0 145 0
2022-10-01 – 2022-12-31 145 0 0 145 0
2022-07-01 – 2022-09-30 145 0 0 145 0
2022-04-01 – 2022-06-30 145 0 0 145 0
2022-01-01 – 2022-03-31 145 0 0 145 0

Location

Project address, coordinates, and nearby places.

Location Details
Address
village- risali, tahsil- durg, dist- durg (c.g.)
District
Durg
Tehsil
Durg
Coordinates
21.1607004, 81.3469224 View on Map
Stored 3km Amenities (Latest Refresh)
Amenity Count Coverage
BOUNDARY WALL — 0%
INTERNAL ROADS AND FOOTPATHS — 0%
LANDSCAPING AND TREE PLANTING — 0%
OPEN PARKING — 0%
SEWERAGE — 0%
STORM WATER DRAINS — 0%
STREET LIGHTING — 0%
WATER CONSERVATION RAIN WATER HARVESTING — 0%
WATER SUPPLY — 0%
Area Livability

Livability of Risali Bhilai

Environmental, infrastructure & amenity parameters for the area where this project is located (1.21 km from project). Each value is compared with the Bhilai average.

Composite Livability Score
67.3 / 100
Grade B · Good
+1.0 vs Bhilai avg (66.3)
Air Quality
46.0 Below Avg
Area
46
City
45
+1.0 vs city avg
Water Quality
75.0 Good
Area
75
City
74
+1.1 vs city avg
Sanitation
65.8 Good
Area
66
City
68
-2.1 vs city avg
Green Cover
47.2 Below Avg
Area
47
City
38
+8.8 vs city avg
Noise Level
77.2 Good
Area
77
City
89
-11.5 vs city avg
Infrastructure
67.4 Good
Area
67
City
73
-5.3 vs city avg
Amenities
86.4 Excellent
Area
86
City
72
+14.1 vs city avg
Flood Safety
72.5 Good
Area
73
City
74
-1.3 vs city avg
Earthquake Safety
90.0 Excellent
Area
90
City
90
+0.0 vs city avg
Land Surface Temp.
59.8 Average
Area
60
City
60
-0.3 vs city avg
Built-up Density
43.6 Below Avg
Area
44
City
43
+0.2 vs city avg
Night-light Activity
33.2 Poor
Area
33
City
46
-12.3 vs city avg
Water Bodies Nearby
100.0 Excellent
Area
100
City
86
+14.5 vs city avg
Population Density
71.1 Good
Area
71
City
66
+4.8 vs city avg
Groundwater Status
57.5 Average
Area
57
City
59
-1.6 vs city avg
Neighborhood Intelligence

Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.

Neighborhood Map 3 km radius
RERA Projects Near pmay for 309 dus at risali, durg 11 found within 3 km
# Project District Status Distance
1 laxmi green city, block - a Durg New 0.71 km
2 LAXMI SKY LIFE Durg New 0.90 km
3 laxmi vila Durg New 0.90 km
4 YASH LAKEVIEW Durg Ongoing 0.98 km
5 pmay of 42(444) dus at laxmi builders risali durg Durg Ongoing 1.17 km
6 LAXMI TOWN PHASE-1 Durg New 1.27 km
7 LAXMI HEIGHT Durg New 1.74 km
8 AKRITI RESIDENCY Durg Ongoing 1.98 km
9 SHUBHKAMNA HEIGHTS Durg Ongoing 2.11 km
10 MAPLE Durg Ongoing 2.75 km
11 ROYAL TOWN Durg New 2.86 km

Buyer Checklist

Documents and verifications a buyer should review before purchase.

Buyer Document Verification Checklist

Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.

8/14 verified
  • RERA Registration Certificate Available
    Confirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.
    RERA No: PCGRERA160222001341
  • Promoter Registration Certificate Available
    Builder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
  • Approved Building / Sanction Plan Available
    Building plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
  • Layout Plan Available
    Approved layout showing plot divisions, roads, open spaces, and common areas.
  • Title Deed / Ownership Proof Verify Independently
    Proof that the promoter legally owns the land. Verify via Sub-Registrar records.
  • Encumbrance Certificate Verify Independently
    Confirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
  • Land Use / Diversion Certificate Verify Independently
    Required if land was converted from agricultural to non-agricultural use.
  • Architect Certificate Available
    Certification from a registered architect confirming structural plans and compliance.
  • Structural Engineer Certificate Available
    Certification from a structural engineer confirming building safety and load-bearing capacity.
  • CA Financial Certificate Available
    Chartered Accountant certificate on financial status, project cost estimates, and fund utilization.
  • Commencement Certificate Verify Independently
    Permission to begin construction issued by the local authority after plan approval.
  • NOCs (No Objection Certificates) Verify Independently
    NOCs from fire department, environment, water supply, electricity board, and other authorities.
  • Project Brochure / Specification Available
    Official brochure with unit types, amenities, and specifications. Compare with actual delivery.
  • RERA Compliance Orders Verify Independently
    Check if any orders, penalties, or directions have been issued against this project by RERA.

Risk Zone Within 5 km

Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.

0
Risk zones (within 5 km)
3 km: 0 3–5 km: 0
0
Water bodies (river/nala/lake)
3 km: 0 3–5 km: 0
0
Landfill / waste sites
3 km: 0 3–5 km: 0
0
Airport buffer overlap
3 km: 0 3–5 km: 0
Risk Zone Map (3 km & 5 km rings) Project marker centered
All Clear

No mapped risk zones within 3 km of this project.

Documents

RERA-filed documents and disclosures available for this project.

Reviews

Verified buyer reviews and ratings for this project.

No reviews yet. Be the first to review this project!

Login to Write a Review

You need to be signed in to submit a review for this project.

Login or Register

Log in to see the full page

This page shows a preview. Sign in (or create a free account) to unlock the full content, charts, and downloads.

Log in Create account