SHRISHTI'S IMPERIA, PHASE II
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Ramsagar Para
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Ramsagar Para — 0.34 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Ramsagar Para. Only parameters with available data are shown below. Based on the latest readings for Ramsagar Para.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 26.1 µg/m³ | ≤ 40 |
Good
|
| PM10 | 242.6 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 26.5 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 373 ppm | ≤ 500 |
Good
|
| Fluoride | 0.69 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.4 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 50% | ≥ 80% |
Concern
|
| Drainage Coverage | 60% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 82.1% | 40-70% |
Contextual
|
| Impervious Surface | 57.7% | < 70% |
Good
|
| NDVI Mean | 0.210 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 88.2% | 76.1% | 82.1% |
| Tree Cover % | 6.3% | 13.8% | 10.1% |
| Urbanization Index | 100.0 | 100.0 | 100.0 |
| Infra Score | 74.0 | 80.9 | 77.8 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 4 | ≥3 |
Good
|
| Markets (1km) | 3 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.262 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 24.2% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 11.0% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 2 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.208 | 0.315 | 0.262 |
| Vegetation % | 23.9% | 24.4% | 24.2% |
| Dense Green % | 8.6% | 13.4% | 11.0% |
| Tree Canopy % | 21.0% | 20.7% | 20.9% |
| Green Score | 33.9 | 44.5 | 39.2 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 55.0 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 49.9 dB | ≤ 45.0 dB |
Concern
|
| Nearest Highway | — m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Medium | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | Medium | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 31.7°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 53.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 32.4 | 31.1 | 31.7 |
| LST Min (°C) | 26.3 | 23.4 | 24.8 |
| LST Max (°C) | 41.7 | 40.1 | 40.9 |
| LST Score | 50.6 | 55.6 | 53.1 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 82.1% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 17.9% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 88.2% | 76.1% | 82.1% |
| Open Space % | 11.8% | 23.9% | 17.9% |
| Built-up Score | 11.8 | 23.9 | 17.9 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 34.21 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 68.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 38.14 | 30.28 | 34.21 |
| Max Radiance | 64.07 | 47.89 | 55.98 |
| NTL Score | 76.3 | 60.6 | 68.4 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 60.37% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 95.59% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 51.20% | 69.53% | 60.37% |
| Seasonal Water % | 93.78% | 97.40% | 95.59% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 8,173.0 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 59.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 26,069 | 227,552 | 126,811 |
| Density / km² | 8,298.0 | 8,048.0 | 8,173.0 |
| Pop Density Score | 58.5 | 59.8 | 59.1 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 133.092 | 30% weight |
Scaled
|
| Recharge | 0.87 | 25% weight |
Scaled
|
| PDSI | 3.01 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,874.35 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 133.467 | 132.717 | 133.092 |
| Recharge Estimate | 0.66 | 1.08 | 0.87 |
| PDSI | 3.02 | 3.01 | 3.01 |
| Groundwater Score | 63.4 | 63.3 | 63.4 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 52.8 | < 40 |
Concern
|
| Avg Slope | 2.86° | > 1° |
Good
|
| Avg Impervious | 89.8% | < 70% |
Concern
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,516 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Infrastructure | Irregular Municipal Water | 0 m / High | Municipal supply once daily for 1-2 hours only |
| Environmental | Nallah Through Ramsagar Colony | 100 m / High | Open drain running through middle of residential colony |
| Water_drainage | Low-Lying Colony Waterlogging | 150 m / High | Colony built in natural depression, repeated monsoon flooding |
| Health_nuisance | Pond Remnant Mosquito Breeding | 300 m / Medium | Old pond converted to dumping ground with stagnant water pockets |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- P3CGRERA010222000028
- Status
- Expired
- Project Type
- Group Housing
- Approved Date
- 01 Feb 2022
- Original End Date
- 23 Dec 2025
No promoters linked.
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- Raipur, Chhattisgarh, India
- District
- RAIPUR
- Tehsil
- RAIPUR
- Coordinates
- 21.2513844, 81.6296413 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | AKANKSHA PARISAR | Raipur | Ongoing | 0.32 km |
| 2 | PITHALIA PLAZA | Raipur | Ongoing | 0.69 km |
| 3 | RAJARIA INDUSTRIAL EUIPMENTS PRIVATE LIMITED | Raipur | Ongoing | 0.75 km |
| 4 | METROPOLIS | Raipur | Ongoing | 0.86 km |
| 5 | RAHEJA TOWER | Raipur | Ongoing | 0.98 km |
| 6 | ANAND ARCADE | Raipur | Ongoing | 1.00 km |
| 7 | PMAY OF 58 DUS AT NEAR DKS PARISAR ,RAIPUR | Raipur | Ongoing | 1.34 km |
| 8 | GULMOHAR PARK | Raipur | Ongoing | 1.39 km |
| 9 | LALGANGA MIDAS | Raipur | Ongoing | 1.59 km |
| 10 | pmay of 280(dus) at kata chirhuldih ,raipur | Raipur | Ongoing | 1.63 km |
| 11 | CREST GREENS | Raipur | Ongoing | 1.83 km |
| 12 | PMAY OF 576 DUS VILLAGE -KOTA CHIRHULDIH , - RAIPUR | Raipur | Ongoing | 2.29 km |
| 13 | SIMRAN HEIGHTS | Raipur | Ongoing | 2.40 km |
| 14 | KALPTARU CASITA | Raipur | New | 2.42 km |
| 15 | SAMRAJYA RESIDENCY | Raipur | New | 2.44 km |
| 16 | BRIGHT ENCLAVE | Raipur | Ongoing | 2.51 km |
| 17 | mansarovar residency | Raipur | Ongoing | 2.54 km |
| 18 | C.G. ELITE | Raipur | Ongoing | 2.76 km |
| 19 | KAVISH ENCLAVE | Raipur | New | 2.82 km |
| 20 | merlin jayshree vihar (phase-ii) | Raipur | Ongoing | 2.85 km |
| 21 | RALAS ENCLAVE | Raipur | Ongoing | 2.97 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: P3CGRERA010222000028
-
Promoter Registration Certificate Verify IndependentlyBuilder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan Verify IndependentlyApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof Verify IndependentlyProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate Verify IndependentlyConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
Architect Certificate Verify IndependentlyCertification from a registered architect confirming structural plans and compliance.
-
Structural Engineer Certificate Verify IndependentlyCertification from a structural engineer confirming building safety and load-bearing capacity.
-
CA Financial Certificate Verify IndependentlyChartered Accountant certificate on financial status, project cost estimates, and fund utilization.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
Project Brochure / Specification Verify IndependentlyOfficial brochure with unit types, amenities, and specifications. Compare with actual delivery.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.61 kmDevpuri Nala ≤3 kmNala · 20m buffer
-
0.63 kmKankali Talab ≤3 kmTank · 50m buffer
-
0.85 kmMaharajband Talab ≤3 kmTank · 50m buffer
-
1.5 kmAmanaka Talab ≤3 kmTank · 50m buffer
-
1.79 kmBhatagaon Nala ≤3 kmNala · 20m buffer
-
2.18 kmBudha Talab (Vivekananda Sarovar) ≤3 kmLake · 50m buffer
-
2.63 kmKharun River ≤3 kmRiver · 75m buffer
-
2.65 kmBoriyakhurd Talab ≤3 kmTank · 50m buffer
-
4.22 kmGudhiyari Old Dump Site 3–5 kmLegacy dump · 500m buffer
-
4.24 kmSLRM Centre Tendua (Tundra) 3–5 kmWaste processing · 200m buffer
-
4.53 kmTatibandh Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
4.87 kmSarora SLRM Centre (Manikanchan Kendra) 3–5 kmWaste processing · 200m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!