GREENEARTH CITY PHASE 1
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Kharun Riverfront
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Kharun Riverfront — 0.31 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Kharun Riverfront. Only parameters with available data are shown below. Based on the latest readings for Kharun Riverfront.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 24.1 µg/m³ | ≤ 40 |
Good
|
| PM10 | 215.3 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.4 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 450 ppm | ≤ 500 |
Good
|
| Fluoride | 0.70 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 2.2 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF++ | ODF++ |
Info
|
| Sewage Coverage | 59% | ≥ 80% |
Concern
|
| Drainage Coverage | 62% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 23.0% | 40-70% |
Contextual
|
| Impervious Surface | 22.7% | < 70% |
Good
|
| NDVI Mean | 0.225 | > 0.3 |
Concern
|
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 5 | ≥1 |
Good
|
| Schools (1km) | 8 | ≥3 |
Good
|
| Markets (1km) | 10 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.241 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 67.9% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 33.9% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 0 | Count * 33 (cap 100) |
Weighted 10%
|
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 48.9 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 44.3 dB | ≤ 45.0 dB |
Good
|
| Nearest Highway | 3,429 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Medium | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | Low-Medium | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.076 | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 27.7°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 69.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 27.3 | 28.0 | 27.7 |
| LST Min (°C) | 10.8 | 13.8 | 12.3 |
| LST Max (°C) | 41.6 | 40.6 | 41.1 |
| LST Score | 71.0 | 67.9 | 69.4 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 28.9% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 71.1% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 36.2% | 21.7% | 28.9% |
| Open Space % | 63.8% | 78.3% | 71.1% |
| Built-up Score | 63.8 | 78.3 | 71.1 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 10.05 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 20.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 7.74 | 12.37 | 10.05 |
| Max Radiance | 17.80 | 20.27 | 19.03 |
| NTL Score | 15.5 | 24.7 | 20.1 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 27.66% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 75.42% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 37.78% | 17.53% | 27.66% |
| Seasonal Water % | 60.06% | 90.77% | 75.42% |
| Water Score | 100.0 | 61.4 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 2,207.1 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 89.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 7,106 | 60,858 | 33,982 |
| Density / km² | 2,261.8 | 2,152.4 | 2,207.1 |
| Pop Density Score | 88.7 | 89.2 | 89.0 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 136.212 | 30% weight |
Scaled
|
| Recharge | 0.85 | 25% weight |
Scaled
|
| PDSI | 2.66 | 20% weight |
Scaled
|
| SM Trend | -10.7516 | 15% weight |
Scaled
|
| Precipitation | 1,522.84 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 125.404 | 147.020 | 136.212 |
| Recharge Estimate | 0.58 | 1.12 | 0.85 |
| PDSI | 3.19 | 2.12 | 2.66 |
| Groundwater Score | 70.5 | 66.1 | 58.6 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 50.9 | < 40 |
Concern
|
| Avg Slope | 2.38° | > 1° |
Good
|
| Avg Impervious | 6.2% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 1 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 2 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Air_pollution | NH traffic corridor | 1867 m / Medium | National highway truck traffic emissions |
| Accessibility | No bus service | 2155 m / Medium | Area lacks regular public bus service |
| Environmental | Roadside waste dump | 2447 m / Medium | Informal waste dumping near road area |
| Infrastructure | Unpaved access road | 893 m / Low | Unmaintained kachha road section |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| GREENEARTH CITY AVENUE | PCGRERA251124001851 | New | Durg | Residential Development |
| GREENEARTH CITY PHASE 3 | PCGRERA200618000244 | Ongoing | Durg | Residential Development |
| GREENEARTH CITY PHASE 4 | PCGRERA200618000246 | Ongoing | Durg | Plotted Development |
| GREENEARTH CITY PHASE- 2 | PCGRERA200618000240 | Ongoing | Durg | Commercial Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA220618000265
- Status
- Ongoing
- Project Type
- Residential Development
- Approved Date
- 21 Jun 2018
- Original End Date
- 31 Jul 2018
- EWS Category
- NO
- Proposed Completion
- 31 Jul 2018
- Authorised Person
- KARM VEER SINGH
- Website
- www.gearth.in
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | ATUL YADAV | 442492 |
| Quarterly CA | CA ALOK KUMAR AGRAWAL | 413331 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- village- amleshwar, patan, durg (c.g.)
- District
- Durg
- Tehsil
- Patan
- Coordinates
- 21.2069257, 81.5802069 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | ZENITH RESIDENCY | Durg | Ongoing | 1.20 km |
| 2 | HARSHIT NEO CITY | Durg | Ongoing | 1.32 km |
| 3 | GREENEARTH CITY PHASE 3 | Durg | Ongoing | 1.35 km |
| 4 | EMERALD HOMES (AKS WORLD CITY) | Durg | Ongoing | 1.37 km |
| 5 | GREENEARTH CITY PHASE- 2 | Durg | Ongoing | 1.46 km |
| 6 | GREENEARTH CITY PHASE 4 | Durg | Ongoing | 1.52 km |
| 7 | AKS SMART CITY | Durg | Ongoing | 1.55 km |
| 8 | GREENEARTH CITY AVENUE | Durg | New | 1.63 km |
| 9 | KRISHNA SATTVAM PHASE 01 | Raipur | New | 1.70 km |
| 10 | VILLA CALIFORNIA | Durg | Ongoing | 1.81 km |
| 11 | GOKULDHAM RESIDENCY | Raipur | Ongoing | 1.90 km |
| 12 | DREAM CITY | Dhamtari | New | 1.94 km |
| 13 | admire green phase- 1 | Raipur | New | 2.00 km |
| 14 | WALLFORT VIHAR | Durg | Ongoing | 2.20 km |
| 15 | AASHA PRIDE CITY | Durg | New | 2.24 km |
| 16 | SANTI ENCLAVE | Raipur | Ongoing | 2.33 km |
| 17 | vinayak city extension-2 | Raipur | New | 2.42 km |
| 18 | vinayak city extension-3 | Raipur | New | 2.45 km |
| 19 | maruti infra city phase- ii | Durg | Ongoing | 2.52 km |
| 20 | MANJEET SMART HOMES | Raipur | New | 2.53 km |
| 21 | MARUTI INFRAA CITY PHASE - 2 | Durg | New | 2.58 km |
| 22 | 7 WONDER CITY | Durg | New | 2.60 km |
| 23 | vinayak city extension-1 | Raipur | New | 2.66 km |
| 24 | maruti 7 wonder city | Durg | New | 2.68 km |
| 25 | PMAY OF 319 (DUS) AT BHATAGAON ,RAIPUR | Raipur | Ongoing | 2.69 km |
| 26 | VINAYAK CITY | Raipur | New | 2.69 km |
| 27 | MARUTI INFRAA CITY 3 | Durg | New | 2.80 km |
| 28 | TDS-01 INDRAPRASTH PHASE -2 | Raipur | Ongoing | 2.89 km |
| 29 | SHIVLOK HEIGHTS | Raipur | New | 2.90 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA220618000265
-
Promoter Registration Certificate AvailableBuilder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.3 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.78 kmUrla Talab ≤3 kmTank · 50m buffer
-
3.22 kmGudhiyari Nala 3–5 kmNala · 20m buffer
-
3.62 kmDumartarai Reservoir 3–5 kmReservoir · 75m buffer
-
4.02 kmKharun Right Bank Canal 3–5 kmCanal · 20m buffer
-
4.8 kmMathpurena Wetland 3–5 kmWetland · 75m buffer
-
3.76 kmBhanpuri-Rawabhata Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
4.43 kmOld Raipur Trenching Ground 3–5 kmInactive landfill · 500m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!