GREENEARTH CITY PHASE 3
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Villa California Area
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Villa California Area — 0.14 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Villa California Area. Only parameters with available data are shown below. Based on the latest readings for Villa California Area.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 23.8 µg/m³ | ≤ 40 |
Good
|
| PM10 | 161.3 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 21.9 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 317 ppm | ≤ 500 |
Good
|
| Fluoride | 0.60 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 4.9 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF++ | ODF++ |
Info
|
| Sewage Coverage | 57% | ≥ 80% |
Concern
|
| Drainage Coverage | 68% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 31.6% | 40-70% |
Contextual
|
| Impervious Surface | 23.2% | < 70% |
Good
|
| NDVI Mean | 0.232 | > 0.3 |
Concern
|
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 3 | ≥3 |
Good
|
| Markets (1km) | 8 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.301 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 54.2% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 22.9% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 3 | Count * 33 (cap 100) |
Weighted 10%
|
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 41.6 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 45.2 dB | ≤ 45.0 dB |
Concern
|
| Nearest Highway | 2,269 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Low | Low preferred |
Info
|
| River Flood Risk | Low | Low preferred |
Info
|
| Waterlogging Risk | Low | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.051 | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 29.1°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 63.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.8 | 27.5 | 29.1 |
| LST Min (°C) | 12.0 | 11.4 | 11.7 |
| LST Max (°C) | 36.7 | 38.2 | 37.4 |
| LST Score | 57.0 | 70.0 | 63.4 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 40.5% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 59.6% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 39.6% | 41.3% | 40.5% |
| Open Space % | 60.4% | 58.7% | 59.6% |
| Built-up Score | 60.4 | 58.7 | 59.6 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 9.01 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 18.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 6.63 | 11.40 | 9.01 |
| Max Radiance | 28.98 | 17.70 | 23.34 |
| NTL Score | 13.3 | 22.8 | 18.0 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 9.45% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 69.00% | 30% weight |
Scaled against 20%
|
| Water Score | 96.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 9.05% | 9.85% | 9.45% |
| Seasonal Water % | 60.95% | 77.04% | 69.00% |
| Water Score | 31.7 | 34.5 | 96.2 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 2,280.0 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 88.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 6,608 | 69,456 | 38,032 |
| Density / km² | 2,103.5 | 2,456.5 | 2,280.0 |
| Pop Density Score | 89.5 | 87.7 | 88.6 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 143.588 | 30% weight |
Scaled
|
| Recharge | 0.77 | 25% weight |
Scaled
|
| PDSI | 3.29 | 20% weight |
Scaled
|
| SM Trend | -17.5858 | 15% weight |
Scaled
|
| Precipitation | 1,806.19 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 138.200 | 148.977 | 143.588 |
| Recharge Estimate | 0.74 | 0.80 | 0.77 |
| PDSI | 3.42 | 3.16 | 3.29 |
| Groundwater Score | 57.3 | 69.1 | 63.0 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 49.5 | < 40 |
Concern
|
| Avg Slope | 2.52° | > 1° |
Good
|
| Avg Impervious | 17.4% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,061 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Air_pollution | NH traffic corridor | 479 m / Medium | National highway truck traffic emissions |
| Environmental | Roadside waste dump | 1247 m / Medium | Informal waste dumping near road area |
| Water_drainage | Open drainage channel | 1143 m / Low | Uncovered drainage near residential area |
| Infrastructure | Unpaved access road | 1178 m / Low | Unmaintained kachha road section |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| GREENEARTH CITY AVENUE | PCGRERA251124001851 | New | Durg | Residential Development |
| greenearth city phase 1 | PCGRERA220618000265 | Ongoing | Durg | Residential Development |
| GREENEARTH CITY PHASE 4 | PCGRERA200618000246 | Ongoing | Durg | Plotted Development |
| GREENEARTH CITY PHASE- 2 | PCGRERA200618000240 | Ongoing | Durg | Commercial Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA200618000244
- Status
- Ongoing
- Project Type
- Residential Development
- Approved Date
- 20 Jun 2018
- Original End Date
- 31 Dec 2020
- EWS Category
- NO
- Construction Cost
- ₹ 59460000
- Land Cost
- ₹ 12753000
- Proposed Completion
- 13 Oct 2023
- Authorised Person
- KARM VEER SINGH
- Website
- www.gearth.in
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | shailesh gangwani | 424577 |
| Quarterly CA | CA ALOK KUMAR AGRAWAL | 413331 |
| Engineer | Syed Akil Ahmed | 290/97 |
| Architect | Piyush Lunawat | CA/2008/42731 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE-AMLESHWAR, PATAN, DURG (C.G.)
- District
- Durg
- Tehsil
- Patan
- Coordinates
- 21.2008561, 81.5689775 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | HARSHIT NEO CITY | Durg | Ongoing | 0.16 km |
| 2 | GREENEARTH CITY PHASE 4 | Durg | Ongoing | 0.21 km |
| 3 | GREENEARTH CITY AVENUE | Durg | New | 0.29 km |
| 4 | GREENEARTH CITY PHASE- 2 | Durg | Ongoing | 0.33 km |
| 5 | AKS SMART CITY | Durg | Ongoing | 0.60 km |
| 6 | EMERALD HOMES (AKS WORLD CITY) | Durg | Ongoing | 0.67 km |
| 7 | VILLA CALIFORNIA | Durg | Ongoing | 0.67 km |
| 8 | ZENITH RESIDENCY | Durg | Ongoing | 0.79 km |
| 9 | WALLFORT VIHAR | Durg | Ongoing | 1.12 km |
| 10 | AASHA PRIDE CITY | Durg | New | 1.15 km |
| 11 | maruti infra city phase- ii | Durg | Ongoing | 1.20 km |
| 12 | MARUTI INFRAA CITY PHASE - 2 | Durg | New | 1.28 km |
| 13 | maruti 7 wonder city | Durg | New | 1.57 km |
| 14 | 7 WONDER CITY | Durg | New | 1.62 km |
| 15 | MARUTI INFRAA CITY 3 | Durg | New | 1.67 km |
| 16 | SHRI SAI CITY (PHASE-3) | Durg | Ongoing | 1.77 km |
| 17 | SHRI SAI CITY ( PHASE -2) | Durg | Ongoing | 1.79 km |
| 18 | SHRI SAI CITY (PHASE-1) | Durg | Ongoing | 1.81 km |
| 19 | LAS VISTA, PHASE - II | Raipur | Ongoing | 2.23 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA200618000244
-
Promoter Registration Certificate AvailableBuilder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
-
Approved Building / Sanction Plan AvailableBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
2.06 kmUrla Talab ≤3 kmTank · 50m buffer
-
4.42 kmDumartarai Reservoir 3–5 kmReservoir · 75m buffer
-
4.53 kmGudhiyari Nala 3–5 kmNala · 20m buffer
-
3.91 kmBhanpuri-Rawabhata Legacy Dump 3–5 kmLegacy dump · 500m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!