EMERALD HOMES (AKS WORLD CITY)
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Sankra
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Sankra — 0.55 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Sankra. Only parameters with available data are shown below. Based on the latest readings for Sankra.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 23.7 µg/m³ | ≤ 40 |
Good
|
| PM10 | 154.3 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.0 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 352 ppm | ≤ 500 |
Good
|
| Fluoride | 0.68 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.9 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF++ | ODF++ |
Info
|
| Sewage Coverage | 69% | ≥ 80% |
Concern
|
| Drainage Coverage | 72% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 16.3% | 40-70% |
Contextual
|
| Impervious Surface | 23.6% | < 70% |
Good
|
| NDVI Mean | 0.201 | > 0.3 |
Concern
|
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 5 | ≥3 |
Good
|
| Markets (1km) | 13 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.373 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 66.4% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 44.8% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 1 | Count * 33 (cap 100) |
Weighted 10%
|
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 46.4 dB | ≤ 55.0 dB |
Good
|
| Night Noise | 38.4 dB | ≤ 45.0 dB |
Good
|
| Nearest Highway | 1,788 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Low | Low preferred |
Info
|
| River Flood Risk | Low | Low preferred |
Info
|
| Waterlogging Risk | Low | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.072 | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 28.9°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 64.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 27.3 | 30.5 | 28.9 |
| LST Min (°C) | 9.8 | 11.7 | 10.8 |
| LST Max (°C) | 40.2 | 39.6 | 39.9 |
| LST Score | 70.8 | 58.1 | 64.4 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 37.0% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 63.0% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 33.7% | 40.2% | 37.0% |
| Open Space % | 66.3% | 59.8% | 63.0% |
| Built-up Score | 66.3 | 59.8 | 63.0 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 7.18 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 14.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 10.16 | 4.20 | 7.18 |
| Max Radiance | 15.74 | 21.33 | 18.53 |
| NTL Score | 20.3 | 8.4 | 14.4 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 3.95% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 72.39% | 30% weight |
Scaled against 20%
|
| Water Score | 57.7 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 5.16% | 2.73% | 3.95% |
| Seasonal Water % | 69.34% | 75.43% | 72.39% |
| Water Score | 18.1 | 9.6 | 57.7 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 1,913.8 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 90.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 7,409 | 41,546 | 24,478 |
| Density / km² | 2,358.2 | 1,469.4 | 1,913.8 |
| Pop Density Score | 88.2 | 92.7 | 90.4 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 133.890 | 30% weight |
Scaled
|
| Recharge | 1.01 | 25% weight |
Scaled
|
| PDSI | 2.37 | 20% weight |
Scaled
|
| SM Trend | -10.4198 | 15% weight |
Scaled
|
| Precipitation | 1,580.11 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 142.532 | 125.248 | 133.890 |
| Recharge Estimate | 0.98 | 1.04 | 1.01 |
| PDSI | 2.06 | 2.69 | 2.37 |
| Groundwater Score | 61.9 | 61.8 | 58.1 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 53.4 | < 40 |
Concern
|
| Avg Slope | 2.41° | > 1° |
Good
|
| Avg Impervious | 16.2% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 1 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 2 | ≥ 5 |
Concern
|
| Nearest Police Station | 2,547 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Accessibility | No bus service | 720 m / Medium | Area lacks regular public bus service |
| Air_pollution | NH traffic corridor | 1035 m / Medium | National highway truck traffic emissions |
| Water_drainage | Open drainage channel | 313 m / Low | Uncovered drainage near residential area |
| Infrastructure | Unpaved access road | 1729 m / Low | Unmaintained kachha road section |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| AKS SMART CITY | PCGRERA070718000489 | Ongoing | Durg | Plotted Development |
| AKS SMART CITY | P3CGRERA150720000016 | Expired | DURG | Group Housing |
| VILLA CALIFORNIA | PCGRERA120319000936 | Ongoing | Durg | Plotted Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA070718000499
- Status
- Ongoing
- Project Type
- Plotted Development
- Approved Date
- 07 Jul 2018
- Original End Date
- 31 Mar 2020
- EWS Category
- NO
- Construction Cost
- ₹ 26000000
- Land Cost
- ₹ 5000000
- Proposed Completion
- 30 Sep 2020
- Authorised Person
- KAMAL CHAND JAIN
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | Awaninidra Kumar Pataria | 072227 |
| Quarterly CA | Vikesh dodai | 422326 |
| Engineer | ASHISH KHEMANI | 567/13 |
| Architect | ASHISH GOYAL | CA/2018/90583 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - PAHANDA, PATAN, DURG (C.G.)
- District
- Durg
- Tehsil
- Patan
- Coordinates
- 21.2066193, 81.5670009 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | AKS SMART CITY | Durg | Ongoing | 0.23 km |
| 2 | ZENITH RESIDENCY | Durg | Ongoing | 0.23 km |
| 3 | VILLA CALIFORNIA | Durg | Ongoing | 0.54 km |
| 4 | GREENEARTH CITY PHASE 3 | Durg | Ongoing | 0.67 km |
| 5 | GREENEARTH CITY AVENUE | Durg | New | 0.79 km |
| 6 | HARSHIT NEO CITY | Durg | Ongoing | 0.82 km |
| 7 | GREENEARTH CITY PHASE 4 | Durg | Ongoing | 0.83 km |
| 8 | GREENEARTH CITY PHASE- 2 | Durg | Ongoing | 1.00 km |
| 9 | maruti infra city phase- ii | Durg | Ongoing | 1.63 km |
| 10 | MARUTI INFRAA CITY PHASE - 2 | Durg | New | 1.75 km |
| 11 | WALLFORT VIHAR | Durg | Ongoing | 1.76 km |
| 12 | AASHA PRIDE CITY | Durg | New | 1.78 km |
| 13 | SHRI SAI CITY ( PHASE -2) | Durg | Ongoing | 1.80 km |
| 14 | SHRI SAI CITY (PHASE-1) | Durg | Ongoing | 1.82 km |
| 15 | SHRI SAI CITY (PHASE-3) | Durg | Ongoing | 1.83 km |
| 16 | LAS VISTA, PHASE - II | Raipur | Ongoing | 1.86 km |
| 17 | maruti 7 wonder city | Durg | New | 2.17 km |
| 18 | MARUTI INFRAA CITY 3 | Durg | New | 2.26 km |
| 19 | 7 WONDER CITY | Durg | New | 2.26 km |
| 20 | multi sports city | Durg | New | 2.89 km |
| 21 | KRISHNA SATTVAM PHASE 01 | Raipur | New | 2.91 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA070718000499
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.7 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
1.9 kmUrla Talab ≤3 kmTank · 50m buffer
-
4.55 kmGudhiyari Nala 3–5 kmNala · 20m buffer
-
4.83 kmDumartarai Reservoir 3–5 kmReservoir · 75m buffer
-
3.24 kmBhanpuri-Rawabhata Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
4.54 kmOld Raipur Trenching Ground 3–5 kmInactive landfill · 500m buffer
-
4.68 kmSarora Trenching Ground 3–5 kmActive landfill · 500m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!