AVINASH TWIN CITY EXTENSION
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Tatibandh
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Tatibandh — 3.94 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Tatibandh. Only parameters with available data are shown below. Based on the latest readings for Tatibandh.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 22.7 µg/m³ | ≤ 40 |
Good
|
| PM10 | 72.9 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 30.4 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 366 ppm | ≤ 500 |
Good
|
| Fluoride | 0.79 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.0 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 55% | ≥ 80% |
Concern
|
| Drainage Coverage | 65% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 51.6% | 40-70% |
Contextual
|
| Impervious Surface | 40.9% | < 70% |
Good
|
| NDVI Mean | 0.230 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 70.2% | 33.0% | 51.6% |
| Tree Cover % | 6.5% | 17.7% | 12.1% |
| Urbanization Index | 100.0 | 83.5 | 91.8 |
| Infra Score | 75.2 | 65.2 | 74.7 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 5 | ≥1 |
Good
|
| Schools (1km) | 5 | ≥3 |
Good
|
| Markets (1km) | 5 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.132 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 15.0% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 5.8% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 8 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.104 | 0.159 | 0.132 |
| Vegetation % | 8.3% | 21.6% | 15.0% |
| Dense Green % | 5.1% | 6.6% | 5.8% |
| Tree Canopy % | 7.1% | 10.2% | 8.7% |
| Green Score | 22.8 | 31.9 | 27.4 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 55.3 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 50.3 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 1,001 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Low-Medium | Low preferred |
Info
|
| River Flood Risk | Low-Medium | Low preferred |
Info
|
| Waterlogging Risk | Low | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 31.2°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 55.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 31.7 | 30.7 | 31.2 |
| LST Min (°C) | 22.4 | 19.0 | 20.7 |
| LST Max (°C) | 42.1 | 40.8 | 41.5 |
| LST Score | 53.2 | 57.2 | 55.2 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 51.6% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 48.4% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 70.2% | 33.0% | 51.6% |
| Open Space % | 29.9% | 67.0% | 48.4% |
| Built-up Score | 29.9 | 67.0 | 48.4 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 19.78 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 39.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 24.44 | 15.13 | 19.78 |
| Max Radiance | 39.05 | 23.35 | 31.20 |
| NTL Score | 48.9 | 30.3 | 39.6 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 40.66% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 94.68% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 34.27% | 47.05% | 40.66% |
| Seasonal Water % | 94.41% | 94.94% | 94.68% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 4,759.4 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 76.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 19,117 | 97,081 | 58,099 |
| Density / km² | 6,085.3 | 3,433.5 | 4,759.4 |
| Pop Density Score | 69.6 | 82.8 | 76.2 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 130.254 | 30% weight |
Scaled
|
| Recharge | 3.44 | 25% weight |
Scaled
|
| PDSI | 3.07 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,873.70 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 130.210 | 130.297 | 130.254 |
| Recharge Estimate | 3.55 | 3.33 | 3.44 |
| PDSI | 3.08 | 3.06 | 3.07 |
| Groundwater Score | 63.2 | 63.2 | 63.2 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 48.2 | < 40 |
Concern
|
| Avg Slope | 2.84° | > 1° |
Good
|
| Avg Impervious | 9.0% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 1 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | 1,700 m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Future_threats | NH-6 Bypass Widening Zone | 200 m / Critical | Properties within 30m of road face acquisition for NH widening |
| Water_drainage | Kharun River Flood Plain | 500 m / High | Area within flood plain of Kharun river, history of 2019 flooding |
| Air_pollution | Brick Kilns - Tatibandh South | 1500 m / High | Active brick kilns 1.5km south causing seasonal air pollution |
| Environmental | Old Tatibandh Dump Yard | 2000 m / High | Decommissioned but not remediated landfill site, 2km from colony |
| Infrastructure | Unlit Patches - Tatibandh Bypass Road | 300 m / Medium | Stretches of bypass road without streetlights |
| Environmental | Industrial Estate Effluent | 800 m / Medium | Small-scale industries discharging partially treated effluent |
| Accessibility | No Bus Route Coverage | 2000 m / Medium | Nearest city bus stop 2+ km away from interior colony |
| Safety_social | Cattle Colony Near Bypass | 1000 m / Low | Large unauthorized cattle colony on bypass road approach |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| avinash twin city | PCGRERA250619000998 | New | Durg | Plotted Development |
| AVINASH TWIN CITY - PHASE 1 EXTENSION III | PCGRERA201125001994 | New | Durg | Residential Plotted Development |
| AVINASH TWIN CITY - PHASE 2 EXTENSION II | PCGRERA201125001993 | New | Durg | Residential Plotted Development |
| avinash twin city -2 | PCGRERA090222001334 | New | Durg | Residential Plotted Development |
| AVINASH TWIN CITY COMMERCIAL - 1 | PCGRERA241025001982 | New | Durg | Commercial Development |
| avinash twin city phase-2 extension | PCGRERA240424001765 | New | Durg | Residential Plotted Development |
| avinash twin city phase-I extension-II | PCGRERA010524001771 | New | Durg | Residential Plotted Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA191022001544
- Status
- New
- Project Type
- Residential Plotted Development
- Approved Date
- 19 Oct 2022
- Original End Date
- 06 Oct 2027
- EWS Category
- NO
- Construction Cost
- ₹ 182990000
- Land Cost
- ₹ 366598000
- Proposed Completion
- 06 Oct 2027
- Authorised Person
- anand singhania
- Website
- www.avinashgroup.com/project/detail/avinash-twin-cit
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | TAPAN KUMAR SHARMA | 302107 |
| Quarterly CA | CA SUSHANT SHRIVASTAVA | 427630 |
| Engineer | VISHEK BISEN | 1119 |
| Architect | Ar. AKHILESH GUPTA | CA/2009/46770 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- Village:- Kumhari, Near Toll Plaza Kumhari, District - Durg (C.G.)
- District
- Durg
- Tehsil
- Dhamdha
- Coordinates
- 21.2609054, 81.5378926 View on Map
Livability of Tatibandh Raipur
Environmental, infrastructure & amenity parameters for the area where this project is located (3.94 km from project). Each value is compared with the Raipur average.
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | avinash twin city phase-2 extension | Durg | New | 0.24 km |
| 2 | avinash twin city -2 | Durg | New | 0.34 km |
| 3 | avinash twin city | Durg | New | 0.42 km |
| 4 | AVINASH TWIN CITY COMMERCIAL - 1 | Durg | New | 0.49 km |
| 5 | AVINASH TWIN CITY - PHASE 2 EXTENSION II | Durg | New | 0.51 km |
| 6 | AVINASH TWIN CITY - PHASE 1 EXTENSION III | Durg | New | 0.52 km |
| 7 | avinash twin city phase-I extension-II | Durg | New | 0.61 km |
| 8 | ralas royal park | Durg | Ongoing | 1.45 km |
| 9 | BALAJI KEWALYA PARK "3" | Durg | New | 2.33 km |
| 10 | BALAJI KEWALYA PARK "I" | Durg | New | 2.40 km |
| 11 | KEWALYA PARK | Durg | Ongoing | 2.42 km |
| 12 | balaji kewalya park -2 | Durg | New | 2.45 km |
| 13 | Lotus city phase- 05 | Durg | New | 2.68 km |
| 14 | HARSHIT PLATINUM GREEN | Durg | New | 2.71 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA191022001544
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
2.04 kmKumhari Talab ≤3 kmTank · 50m buffer
-
1.74 kmSarora Composting / Bio-methanation Plant ≤3 kmWaste processing · 200m buffer
-
2.15 kmSarora Trenching Ground ≤3 kmActive landfill · 500m buffer
-
3.43 kmJarway Transfer Station 3–5 kmTransfer station · 100m buffer
-
3.68 kmBhanpuri-Rawabhata Legacy Dump 3–5 kmLegacy dump · 500m buffer
-
4.27 kmOld Raipur Trenching Ground 3–5 kmInactive landfill · 500m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!