ARANYA LAKE SHORE CITY
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Sector 1
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Sector 1 — 6.22 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Sector 1. Only parameters with available data are shown below. Based on the latest readings for Sector 1.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 30.8 µg/m³ | ≤ 40 |
Good
|
| PM10 | 58.7 µg/m³ | ≤ 60 |
Good
|
| NO₂ | 8.2 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 237 ppm | ≤ 500 |
Good
|
| Fluoride | 0.47 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 1.7 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF++ | ODF++ |
Info
|
| Sewage Coverage | 95% | ≥ 80% |
Good
|
| Drainage Coverage | 98% | ≥ 90% |
Good
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 10.4% | 40-70% |
Contextual
|
| Impervious Surface | 24.8% | < 70% |
Good
|
| NDVI Mean | 0.260 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 13.6% | 7.2% | 10.4% |
| Tree Cover % | 4.6% | 4.1% | 4.3% |
| Urbanization Index | 17.4 | 18.1 | 17.8 |
| Infra Score | 37.5 | 33.0 | 35.2 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 2 | ≥3 |
Concern
|
| Markets (1km) | 1 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.309 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 38.3% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 20.2% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 0 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.349 | 0.268 | 0.309 |
| Vegetation % | 43.4% | 33.1% | 38.3% |
| Dense Green % | 25.9% | 14.5% | 20.2% |
| Tree Canopy % | 33.5% | 31.7% | 32.6% |
| Green Score | 51.3 | 37.2 | 44.3 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 61.3 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 56.3 dB | ≤ 55.0 dB |
Concern
|
| Nearest Highway | 1,968 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Lowest | Low preferred |
Info
|
| River Flood Risk | Low | Low preferred |
Info
|
| Waterlogging Risk | Low | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.5°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 58.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 31.0 | 30.0 | 30.5 |
| LST Min (°C) | 13.4 | 14.1 | 13.7 |
| LST Max (°C) | 40.1 | 39.9 | 40.0 |
| LST Score | 56.2 | 59.9 | 58.0 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 10.4% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 89.6% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 13.6% | 7.2% | 10.4% |
| Open Space % | 86.4% | 92.8% | 89.6% |
| Built-up Score | 86.4 | 92.8 | 89.6 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 9.62 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 19.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 11.54 | 7.71 | 9.62 |
| Max Radiance | 20.29 | 12.01 | 16.15 |
| NTL Score | 23.1 | 15.4 | 19.2 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 62.29% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 94.92% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 59.14% | 65.43% | 62.29% |
| Seasonal Water % | 92.90% | 96.94% | 94.92% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 886.6 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 95.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 2,879 | 24,219 | 13,549 |
| Density / km² | 916.5 | 856.6 | 886.6 |
| Pop Density Score | 95.4 | 95.7 | 95.6 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 145.402 | 30% weight |
Scaled
|
| Recharge | 1.36 | 25% weight |
Scaled
|
| PDSI | 3.53 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,847.72 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 145.408 | 145.396 | 145.402 |
| Recharge Estimate | 1.40 | 1.32 | 1.36 |
| PDSI | 3.60 | 3.45 | 3.53 |
| Groundwater Score | 66.7 | 66.3 | 66.5 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 45.0 | < 40 |
Concern
|
| Avg Slope | 2.68° | > 1° |
Good
|
| Avg Impervious | 6.9% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Accessibility | Limited City Bus Service | 0 m / Medium | Only 2 bus routes operational, low frequency |
| Future_threats | Rapid Development Pressure | 0 m / Low | Multiple large-scale projects straining existing infrastructure |
| Infrastructure | Construction Phase Water Issues | 500 m / Low | Water supply network still being extended to newer blocks |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| aranya city of woodland chatoud | PCGRERA211220001170 | New | Raipur | Residential Plotted Development |
| ARANYA CITY OF WOODLAND PACHEDA | PCGRERA230618000300 | Ongoing | Raipur | Plotted Development |
| aranya lake shore city | PCGRERA300618000425 | Ongoing | Raipur | Plotted Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA070919001036
- Status
- New
- Project Type
- Plotted Development
- Approved Date
- 07 Sep 2019
- Original End Date
- 31 Mar 2026
- EWS Category
- NO
- Construction Cost
- ₹ 18328000
- Land Cost
- ₹ 11427000
- Proposed Completion
- 30 Dec 2026
- Authorised Person
- BUDDHESHWAR VERMA
- Website
- www.aranyarealestate.com
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | HARPREET KOUR | 432348 |
| Quarterly CA | Amit Moryani | 455077 |
| Engineer | AMIT SEN | 82/90 |
| Architect | JAGAT LAKARA | CA/99/24320 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- PH NO .14 VILL BAHANAKADI TAH AARANG DIST RAIPUR CG
- District
- Raipur
- Tehsil
- Arang
- Coordinates
- 21.2746867, 81.7911105 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | EMERALD CITY | Raipur | New | 1.89 km |
| 2 | shivalaya park | Raipur | New | 2.23 km |
| 3 | krishna vihar | Raipur | Ongoing | 2.49 km |
| 4 | general scheme at dday colony mungi raipur | Raipur | New | 2.94 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA070919001036
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.1 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
All Clear
No mapped risk zones within 3 km of this project.
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!