AUGUST SILVER MOON
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Magneto Zone
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Magneto Zone — 0.56 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Magneto Zone. Only parameters with available data are shown below. Based on the latest readings for Magneto Zone.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 30.7 µg/m³ | ≤ 40 |
Good
|
| PM10 | 85.6 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 19.8 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 414 ppm | ≤ 500 |
Good
|
| Fluoride | 0.92 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.2 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF++ | ODF++ |
Info
|
| Sewage Coverage | 78% | ≥ 80% |
Concern
|
| Drainage Coverage | 82% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 38.0% | 40-70% |
Contextual
|
| Impervious Surface | 16.4% | < 70% |
Good
|
| NDVI Mean | 0.310 | > 0.3 |
Good
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 34.7% | 41.4% | 38.0% |
| Tree Cover % | 31.7% | 16.5% | 24.1% |
| Urbanization Index | 100.0 | 88.6 | 94.3 |
| Infra Score | 74.0 | 69.0 | 71.9 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 11 | ≥3 |
Good
|
| Markets (1km) | 8 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.199 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 14.4% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 4.5% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 0 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.166 | 0.231 | 0.199 |
| Vegetation % | 14.8% | 14.0% | 14.4% |
| Dense Green % | 2.0% | 7.1% | 4.5% |
| Tree Canopy % | 8.5% | 12.4% | 10.5% |
| Green Score | 18.5 | 25.5 | 22.1 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 50.7 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 48.8 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 1,028 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | High | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 29.0°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 64.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 29.1 | 28.9 | 29.0 |
| LST Min (°C) | 3.1 | 1.9 | 2.5 |
| LST Max (°C) | 40.8 | 40.4 | 40.6 |
| LST Score | 63.6 | 64.4 | 64.0 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 38.0% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 62.0% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 34.7% | 41.4% | 38.0% |
| Open Space % | 65.3% | 58.6% | 62.0% |
| Built-up Score | 65.3 | 58.6 | 62.0 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 26.08 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 52.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 29.16 | 23.00 | 26.08 |
| Max Radiance | 41.75 | 35.62 | 38.69 |
| NTL Score | 58.3 | 46.0 | 52.2 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 31.26% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 48.16% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 0.00% | 62.52% | 31.26% |
| Seasonal Water % | 0.00% | 96.32% | 48.16% |
| Water Score | 0.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 3,984.0 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 80.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 12,815 | 109,952 | 61,384 |
| Density / km² | 4,079.2 | 3,888.7 | 3,984.0 |
| Pop Density Score | 79.6 | 80.6 | 80.1 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 136.274 | 30% weight |
Scaled
|
| Recharge | 1.19 | 25% weight |
Scaled
|
| PDSI | 3.01 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,866.01 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 136.483 | 136.065 | 136.274 |
| Recharge Estimate | 0.90 | 1.49 | 1.19 |
| PDSI | 3.00 | 3.02 | 3.01 |
| Groundwater Score | 63.8 | 63.9 | 63.9 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 49.8 | < 40 |
Concern
|
| Avg Slope | 2.74° | > 1° |
Good
|
| Avg Impervious | 24.3% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA190122001325
- Status
- New
- Project Type
- Residential Plotted Development
- Approved Date
- 19 Jan 2022
- Original End Date
- 29 Nov 2026
- EWS Category
- NO
- Construction Cost
- ₹ 169872000
- Land Cost
- ₹ 235197000
- Proposed Completion
- 29 Nov 2026
- Authorised Person
- PRABHTEJ SINGH BHATIA
- Website
- www.augustprojects.co
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | Praveen Jain | 414739 |
| Quarterly CA | Jyoti Vaid | 423089 |
| Engineer | M/s Neeraj Bajpai and Associates | 1540/2022 |
| Architect | M/s Neeraj Bajpai and Associates | 1540/2022 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - LABHANDIH ,TAHSIL - RAIPUR, DISTRICT-RAIPUR
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2458294, 81.6847863 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | MAGNETO SIGNATURE HOMES -II APARTMENT | Raipur | New | 0.31 km |
| 2 | magneto signature homes - ii | Raipur | Ongoing | 0.32 km |
| 3 | SAMPOORNA HOMES (PHASE-I) | Raipur | New | 0.36 km |
| 4 | SAMRIDDHI ALTUS | Raipur | New | 0.44 km |
| 5 | SURYODAYA WONDER 16 | Raipur | New | 0.46 km |
| 6 | METRO HEXA | Raipur | New | 0.51 km |
| 7 | a. mittal avenue | Raipur | Ongoing | 0.52 km |
| 8 | AGRASAR PRIDE | Raipur | Ongoing | 0.69 km |
| 9 | PPMAY OF 203(DUS)) AT LABHANDI RAIPUR | Raipur | Ongoing | 0.71 km |
| 10 | the address | Raipur | New | 0.74 km |
| 11 | aishwarya empire phase - iii | Raipur | Ongoing | 0.75 km |
| 12 | aishwarya empire phase - iv | Raipur | Ongoing | 0.77 km |
| 13 | Samriddhi atlantis | Raipur | New | 0.78 km |
| 14 | aishwarya empire phase - i | Raipur | Ongoing | 0.78 km |
| 15 | aishwarya empire phase - v | Raipur | Ongoing | 0.78 km |
| 16 | aishwarya empire | Raipur | Ongoing | 0.79 km |
| 17 | SAMRIDDHI ATLANTIS PHASE-2 | Raipur | New | 0.79 km |
| 18 | "SHRIJAN" PREMIUM | Raipur | Ongoing | 0.80 km |
| 19 | MOTI MAHAL PALLADIUM | Raipur | Ongoing | 0.87 km |
| 20 | quorum | Raipur | Ongoing | 0.91 km |
| 21 | sai simran bhawna nagar | Raipur | Ongoing | 0.92 km |
| 22 | avinash ONE | Raipur | New | 0.93 km |
| 23 | srishtis imperia phase-1 | Raipur | New | 0.96 km |
| 24 | shri krishna vatika | Raipur | New | 0.97 km |
| 25 | Bhardwaj sky phase ii | Raipur | New | 0.97 km |
| 26 | CLOUD 9 BLOCK - B | Raipur | Ongoing | 0.97 km |
| 27 | V3 ASHIYANA | Raipur | New | 0.97 km |
| 28 | CURRENCY TOWER | Raipur | Ongoing | 1.00 km |
| 29 | bhardwaj sky | Raipur | New | 1.00 km |
| 30 | avinash one extension | Raipur | New | 1.01 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA190122001325
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
NOCs (No Objection Certificates) AvailableNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
1.44 kmHeerapur Talab ≤3 kmPond · 50m buffer
-
1.54 kmKharun Left Bank Canal ≤3 kmCanal · 20m buffer
-
2.42 kmTelibandha Nala ≤3 kmNala · 20m buffer
-
2.72 kmDunda Talab ≤3 kmPond · 50m buffer
-
2.78 kmTelibandha Talab (Marine Drive) ≤3 kmLake · 50m buffer
-
2.92 kmMahanadi Main Canal ≤3 kmCanal · 100m buffer
-
3.1 kmMuktangan Talab 3–5 kmTank · 50m buffer
-
3.12 kmKharun River 3–5 kmRiver · 75m buffer
-
2.96 kmSLRM Centre Tendua (Tundra) ≤3 kmWaste processing · 200m buffer
-
3.53 kmDaldal Seoni MSW Transfer Station 3–5 kmTransfer station · 100m buffer
-
9.18 kmSwami Vivekananda Airport 5–10 kmRPR / VARP · DGCA height limits apply
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!