Livability of Saddu
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Saddu — 1.68 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Saddu. Only parameters with available data are shown below. Based on the latest readings for Saddu.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 34.9 µg/m³ | ≤ 40 |
Good
|
| PM10 | 63.7 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 17.2 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 333 ppm | ≤ 500 |
Good
|
| Fluoride | 0.53 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.3 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF | ODF++ |
Info
|
| Sewage Coverage | 38% | ≥ 80% |
Concern
|
| Drainage Coverage | 48% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 23.9% | 40-70% |
Contextual
|
| Impervious Surface | 22.6% | < 70% |
Good
|
| NDVI Mean | 0.280 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 27.8% | 19.9% | 23.9% |
| Tree Cover % | 14.3% | 13.1% | 13.7% |
| Urbanization Index | 100.0 | 77.7 | 88.9 |
| Infra Score | 66.7 | 54.6 | 60.7 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 2 | ≥1 |
Good
|
| Schools (1km) | 5 | ≥3 |
Good
|
| Markets (1km) | 9 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.201 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 28.6% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 13.4% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 1 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.198 | 0.203 | 0.201 |
| Vegetation % | 29.7% | 27.4% | 28.6% |
| Dense Green % | 13.0% | 13.9% | 13.4% |
| Tree Canopy % | 13.7% | 11.9% | 12.8% |
| Green Score | 33.2 | 33.3 | 33.3 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 47.2 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 39.1 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 386 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Highest | Low preferred |
Info
|
| River Flood Risk | High | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low-Medium | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 28.7°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 65.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 28.8 | 28.6 | 28.7 |
| LST Min (°C) | -0.1 | 0.3 | 0.1 |
| LST Max (°C) | 39.9 | 40.4 | 40.2 |
| LST Score | 65.0 | 65.7 | 65.4 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 23.9% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 76.1% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 27.8% | 19.9% | 23.9% |
| Open Space % | 72.2% | 80.1% | 76.1% |
| Built-up Score | 72.2 | 80.1 | 76.1 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 21.09 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 42.2 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 24.14 | 18.04 | 21.09 |
| Max Radiance | 38.09 | 28.99 | 33.54 |
| NTL Score | 48.3 | 36.1 | 42.2 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 38.49% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 94.96% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 23.57% | 53.40% | 38.49% |
| Seasonal Water % | 95.19% | 94.73% | 94.96% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 1,927.8 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 90.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 6,829 | 47,556 | 27,193 |
| Density / km² | 2,173.6 | 1,682.0 | 1,927.8 |
| Pop Density Score | 89.1 | 91.6 | 90.4 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 135.019 | 30% weight |
Scaled
|
| Recharge | 2.16 | 25% weight |
Scaled
|
| PDSI | 3.10 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,856.20 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 135.198 | 134.841 | 135.019 |
| Recharge Estimate | 2.46 | 1.85 | 2.16 |
| PDSI | 3.10 | 3.10 | 3.10 |
| Groundwater Score | 64.0 | 63.9 | 63.9 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 49.3 | < 40 |
Concern
|
| Avg Slope | 2.43° | > 1° |
Good
|
| Avg Impervious | 10.7% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Infrastructure | Water Supply 1-2 hrs/day in Summer | 0 m / High | Municipal water supply drops to 1-2 hours during peak summer |
| Accessibility | Limited Bus Connectivity | 0 m / Medium | Only one city bus route, frequency >45 minutes |
| Environmental | Construction Debris Dumping | 600 m / Medium | Builders using vacant land for construction waste dumping |
| Future_threats | Planned Industrial Park Nearby | 3000 m / Medium | State Govt approved industrial park within 3km radius |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| GOKULDHAM APARTMENT | PCGRERA020818000649 | Ongoing | Raigarh | Residential Development |
| OM BUILDERS SG PHASE -1(N) | PCGRERA230321001212 | New | Raipur | Residential Plotted Development |
| OM CONSTRUCTION SG. PHASE -1 "O" | PCGRERA230321001213 | New | Raipur | Residential Development |
| SAPPHIRE EMPERIA PHASE -1 BLOCK "A" | PCGRERA070818000664 | Ongoing | Raipur | Residential Development |
| SAPPHIRE EMPERIA PHASE -2 BLOCK "B" & "C" | PCGRERA070818000665 | Ongoing | Raipur | Mixed Development |
| SAPPHIRE EMPERIA PHASE -3 BLOCK "D" | PCGRERA080818000669 | Ongoing | Raipur | Mixed Development |
| SAPPHIRE EMPERIA PHASE -4 BLOCK "E" | PCGRERA080818000668 | Ongoing | Raipur | Mixed Development |
| SAPPHIRE GREENS PHASE -I "B" & II "B" | PCGRERA070818000666 | Ongoing | Raipur | Plotted Development |
| SAPPHIRE GREENS PHASE -I "D" | PCGRERA040718000451 | Ongoing | Raipur | Residential Development |
| SAPPHIRE GREENS PHASE -I "E" | PCGRERA070818000662 | Ongoing | Raipur | Residential Development |
| SAPPHIRE GREENS PHASE -I "F" | PCGRERA070818000660 | Ongoing | Raipur | Residential Development |
| SAPPHIRE GREENS PHASE -I (L) | PCGRERA110319000935 | New | Raipur | Plotted Development |
| sapphire greens phase- i "c" | PCGRERA040718000445 | Ongoing | Raipur | Residential Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA070818000663
- Status
- Ongoing
- Project Type
- Plotted Development
- Approved Date
- 07 Aug 2018
- Original End Date
- 31 Dec 2018
- EWS Category
- NO
- Construction Cost
- ₹ 396977000
- Land Cost
- ₹ 18221000
- Proposed Completion
- 31 Dec 2018
- Authorised Person
- RAJKUMAR KHILWANI
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | SATYAJEET CHATTERJEE | 072544 |
| Quarterly CA | CA RAKHI DWIVEDI | 411529 |
| Engineer | PRATEEK KUMAR GUPTA | 879/2017 |
| Architect | Sachin Khare | CA/2015/66924 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- VILLAGE - BARONDA, RAIPUR (C.G.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2875243, 81.7133454 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA070818000663
-
Promoter Registration Certificate AvailableBuilder / colonizer company registration certificate. Confirms the promoter entity is a registered firm, company, or society.
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.4 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
4.8 kmKendri Talab 3–5 kmTank · 50m buffer
-
3.75 kmDaldal Seoni MSW Transfer Station 3–5 kmTransfer station · 100m buffer
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!