NAKODAJEE TRADE CENTRE 2
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Bhatagaon
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Bhatagaon — 1.18 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Bhatagaon. Only parameters with available data are shown below. Based on the latest readings for Bhatagaon.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 18.2 µg/m³ | ≤ 40 |
Good
|
| PM10 | 65.0 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 30.2 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 344 ppm | ≤ 500 |
Good
|
| Fluoride | 0.82 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 3.6 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 55% | ≥ 80% |
Concern
|
| Drainage Coverage | 65% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 52.6% | 40-70% |
Contextual
|
| Impervious Surface | 37.0% | < 70% |
Good
|
| NDVI Mean | 0.250 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 56.6% | 48.5% | 52.6% |
| Tree Cover % | 4.6% | 14.6% | 9.6% |
| Urbanization Index | 96.3 | 82.7 | 89.5 |
| Infra Score | 75.7 | 71.5 | 73.6 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 5 | ≥1 |
Good
|
| Schools (1km) | 7 | ≥3 |
Good
|
| Markets (1km) | 11 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.222 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 24.9% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 14.8% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 4 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.196 | 0.248 | 0.222 |
| Vegetation % | 21.6% | 28.1% | 24.9% |
| Dense Green % | 15.2% | 14.5% | 14.8% |
| Tree Canopy % | 17.7% | 16.6% | 17.1% |
| Green Score | 38.2 | 44.1 | 41.2 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 55.4 dB | ≤ 55.0 dB |
Concern
|
| Night Noise | 50.3 dB | ≤ 45.0 dB |
Concern
|
| Nearest Highway | — m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Medium | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | Medium | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.5°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 57.9 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.7 | 30.4 | 30.5 |
| LST Min (°C) | 24.1 | 23.2 | 23.6 |
| LST Max (°C) | 38.5 | 38.3 | 38.4 |
| LST Score | 57.3 | 58.4 | 57.9 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 52.6% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 47.5% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 56.6% | 48.5% | 52.6% |
| Open Space % | 43.4% | 51.5% | 47.5% |
| Built-up Score | 43.4 | 51.5 | 47.5 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 21.30 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 42.6 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 23.43 | 19.17 | 21.30 |
| Max Radiance | 35.15 | 29.45 | 32.30 |
| NTL Score | 46.9 | 38.3 | 42.6 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 74.42% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 98.28% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 83.49% | 65.34% | 74.42% |
| Seasonal Water % | 98.64% | 97.92% | 98.28% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 4,394.5 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 78.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 13,364 | 128,224 | 70,794 |
| Density / km² | 4,254.0 | 4,535.0 | 4,394.5 |
| Pop Density Score | 78.7 | 77.3 | 78.0 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 133.016 | 30% weight |
Scaled
|
| Recharge | 0.44 | 25% weight |
Scaled
|
| PDSI | 2.88 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,871.90 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 133.047 | 132.985 | 133.016 |
| Recharge Estimate | 0.42 | 0.47 | 0.44 |
| PDSI | 2.91 | 2.84 | 2.88 |
| Groundwater Score | 63.1 | 62.9 | 63.0 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 48.8 | < 40 |
Concern
|
| Avg Slope | 2.39° | > 1° |
Good
|
| Avg Impervious | 7.5% | < 70% |
Good
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Water_drainage | Low-Lying Basin Area | 300 m / High | Natural depression area collects water from surrounding higher ground |
| Environmental | Bhatagaon Solid Waste Processing Plant | 1500 m / High | Municipal solid waste processing facility causing odor issues |
| Infrastructure | Colony Roads Under Construction | 200 m / Medium | Road widening work in progress causing access difficulties |
| Health_nuisance | Commercial Poultry Farm | 1000 m / Medium | Large-scale poultry operation causing odor and waste issues |
| Air_pollution | Urla Industrial Area Proximity | 3000 m / Medium | Industrial belt 3km away causing seasonal air quality deterioration |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| NAKODAJEE ASSOCIATES | PCGRERA200818000703 | Ongoing | Raipur | Commercial Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA190423001627
- Status
- New
- Project Type
- Commercial Development
- Approved Date
- 19 Apr 2023
- Original End Date
- 11 Dec 2026
- EWS Category
- NO
- Construction Cost
- ₹ 49
- Proposed Completion
- 11 Dec 2026
- Authorised Person
- NAVDEEP JAIN
Buildings & Units
Inventory overview, sold/unsold breakdown, and building details.
No unit data available yet.
Run the RERA detail scraper to populate this section.
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
Location
Project address, coordinates, and nearby places.
- Address
- Khasra No 01,WEIGH-BRIDGE COMMERCIAL,WHOLESALE
MARKET DUMARTARAI, RAIPUR,C.G - District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2041226, 81.6148729 View on Map
Livability of Bhatagaon Raipur
Environmental, infrastructure & amenity parameters for the area where this project is located (1.18 km from project). Each value is compared with the Raipur average.
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | pragati pearl | Raipur | Ongoing | 0.43 km |
| 2 | chandra town | Raipur | Ongoing | 0.59 km |
| 3 | gt uni homes phase-2 | Raipur | New | 0.75 km |
| 4 | WHITEWOOD ITALIA | Raipur | Ongoing | 0.77 km |
| 5 | GT UNI HOMES | Raipur | New | 0.80 km |
| 6 | VIMLA VIHAR | Raipur | Ongoing | 0.91 km |
| 7 | rIVER COUNTY (J-BLOCK) | Raipur | New | 0.94 km |
| 8 | river county - 01 | Raipur | Ongoing | 0.95 km |
| 9 | RIVER COUNTY - 3 | Raipur | New | 0.98 km |
| 10 | river county - 03 | Raipur | Ongoing | 0.99 km |
| 11 | river county - 02 | Raipur | Ongoing | 0.99 km |
| 12 | river county - 07 | Raipur | Ongoing | 0.99 km |
| 13 | river county - 04 | Raipur | Ongoing | 0.99 km |
| 14 | river county - 05 | Raipur | Ongoing | 1.01 km |
| 15 | river county - 06 | Raipur | Ongoing | 1.02 km |
| 16 | river county - 08 | Raipur | Ongoing | 1.03 km |
| 17 | UNIQUE PARADISE PHASE -2 | Raipur | New | 1.11 km |
| 18 | lotus tower phase ii | Raipur | Ongoing | 1.12 km |
| 19 | lotus tower phase i | Raipur | Ongoing | 1.13 km |
| 20 | UNIQUE PARADISE PHASE -2 EXTENSION | Raipur | New | 1.13 km |
| 21 | DHEBAR CITY HOMES | Raipur | Ongoing | 1.15 km |
| 22 | ABHINANDAN TOWER | Raipur | Ongoing | 1.18 km |
| 23 | NATURAL CITY | Raipur | Ongoing | 1.18 km |
| 24 | uttam city | Raipur | New | 1.26 km |
| 25 | PMAY OF 290 (dus) AT BHATAGAON ,RAIPUR | Raipur | Ongoing | 1.27 km |
| 26 | NATURAL CITY PHASE II | Raipur | New | 1.28 km |
| 27 | wallfort heights phase -2 ( g,h,i,j,K,L ) | Raipur | New | 1.28 km |
| 28 | PMAY OF 319 (DUS) AT BHATAGAON ,RAIPUR | Raipur | Ongoing | 1.35 km |
| 29 | wallfort heightS phase iii | Raipur | New | 1.40 km |
| 30 | Vinayak Green Scape | Raipur | New | 1.45 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA190423001627
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
Architect Certificate Verify IndependentlyCertification from a registered architect confirming structural plans and compliance.
-
Structural Engineer Certificate Verify IndependentlyCertification from a structural engineer confirming building safety and load-bearing capacity.
-
CA Financial Certificate AvailableChartered Accountant certificate on financial status, project cost estimates, and fund utilization.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders AvailableCheck if any orders, penalties, or directions have been issued against this project by RERA.1 order(s) on record — review in Legal tab
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
1.31 kmGudhiyari Nala ≤3 kmNala · 20m buffer
-
1.65 kmDumartarai Reservoir ≤3 kmReservoir · 75m buffer
-
1.87 kmMathpurena Wetland ≤3 kmWetland · 75m buffer
-
2.34 kmBirgaon Talab ≤3 kmTank · 50m buffer
-
2.92 kmKharun Right Bank Canal ≤3 kmCanal · 20m buffer
-
3.35 kmUrla Talab 3–5 kmTank · 50m buffer
-
3.62 kmBudha Talab (Vivekananda Sarovar) 3–5 kmLake · 50m buffer
-
3.7 kmMandir Hasaud Talab 3–5 kmTank · 50m buffer
Documents
RERA-filed documents and disclosures available for this project.
BRIEF (1)
BUILDING (1)
CA (1)
COLONIZER (1)
COMMON (1)
DEVE (1)
DIVERSION (1)
Demarcation (1)
ENUM (1)
LAYOUT (1)
PASSBOOK (1)
PHOTO (1)
PSPEC (1)
Reg (1)
SANCTIONBUILDING (1)
SEARCH (1)
SELF (1)
TAC (1)
TENT (1)
other (6)
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!