SAI SIMRAN PURENA
360° Project Intelligence
Comprehensive analysis across regulatory, livability, market, filing activity, and market readiness dimensions.
Livability of Basant Vihar
Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Basant Vihar — 0.18 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Basant Vihar. Only parameters with available data are shown below. Based on the latest readings for Basant Vihar.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 28.0 µg/m³ | ≤ 40 |
Good
|
| PM10 | 218.6 µg/m³ | ≤ 60 |
Concern
|
| NO₂ | 22.8 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 447 ppm | ≤ 500 |
Good
|
| Fluoride | 0.70 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 5.2 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF++ | ODF++ |
Info
|
| Sewage Coverage | 80% | ≥ 80% |
Good
|
| Drainage Coverage | 88% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 77.1% | 40-70% |
Contextual
|
| Impervious Surface | 45.4% | < 70% |
Good
|
| NDVI Mean | 0.220 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 89.7% | 64.4% | 77.1% |
| Tree Cover % | 3.3% | 11.8% | 7.5% |
| Urbanization Index | 100.0 | 97.4 | 98.7 |
| Infra Score | 74.1 | 80.2 | 78.7 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 0 | ≥1 |
Concern
|
| Schools (1km) | 3 | ≥3 |
Good
|
| Markets (1km) | 6 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.290 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 35.4% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 12.7% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 2 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.266 | 0.313 | 0.290 |
| Vegetation % | 31.7% | 39.0% | 35.4% |
| Dense Green % | 10.8% | 14.7% | 12.7% |
| Tree Canopy % | 15.1% | 22.7% | 18.9% |
| Green Score | 41.7 | 49.2 | 45.5 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 57.8 dB | ≤ 55.0 dB |
Concern
|
| Night Noise | 52.9 dB | ≤ 45.0 dB |
Concern
|
| Nearest Highway | 309 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | Lowest | Low preferred |
Info
|
| River Flood Risk | Low | Low preferred |
Info
|
| Waterlogging Risk | Low | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.3°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 58.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.6 | 30.0 | 30.3 |
| LST Min (°C) | 12.8 | 11.0 | 11.9 |
| LST Max (°C) | 41.1 | 40.5 | 40.8 |
| LST Score | 57.7 | 60.0 | 58.8 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 77.1% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 22.9% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 89.7% | 64.4% | 77.1% |
| Open Space % | 10.3% | 35.6% | 22.9% |
| Built-up Score | 10.3 | 35.6 | 22.9 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 30.53 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 61.1 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 31.48 | 29.58 | 30.53 |
| Max Radiance | 50.42 | 45.15 | 47.79 |
| NTL Score | 63.0 | 59.2 | 61.1 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 37.52% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 88.91% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 13.83% | 61.20% | 37.52% |
| Seasonal Water % | 81.28% | 96.53% | 88.91% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 6,833.0 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 65.8 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 23,797 | 172,225 | 98,011 |
| Density / km² | 7,574.7 | 6,091.2 | 6,833.0 |
| Pop Density Score | 62.1 | 69.5 | 65.8 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 135.528 | 30% weight |
Scaled
|
| Recharge | 0.59 | 25% weight |
Scaled
|
| PDSI | 2.98 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,869.75 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 135.733 | 135.323 | 135.528 |
| Recharge Estimate | 0.58 | 0.60 | 0.59 |
| PDSI | 2.99 | 2.98 | 2.98 |
| Groundwater Score | 63.7 | 63.6 | 63.7 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 53.9 | < 40 |
Concern
|
| Avg Slope | 3.05° | > 1° |
Good
|
| Avg Impervious | 81.5% | < 70% |
Concern
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
| Project | RERA No. | Status | District | Type |
|---|---|---|---|---|
| SAI SHARDHA | PCGRERA050718000468 | Ongoing | Raipur | Residential Development |
| SAI SILVER | PCGRERA140618000150 | New | Raipur | Residential Development |
| sai simran bhawna nagar | PCGRERA060718000478 | Ongoing | Raipur | Residential Development |
| sai twins | PCGRERA140618000166 | New | Raipur | Residential Development |
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA050718000469
- Status
- Ongoing
- Project Type
- Residential Development
- Approved Date
- 05 Jul 2018
- Original End Date
- 31 Dec 2018
- EWS Category
- NO
- Construction Cost
- ₹ 80933000
- Land Cost
- ₹ 6355000
- Proposed Completion
- 31 Dec 2018
- Authorised Person
- SUNIL KUMAR AHUJA
- Website
- www.ramsbuildersanddevelopers.com
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | CA ALOK KUMAR AGRAWAL | 413331 |
| Quarterly CA | Uttam kumar garg | 060726 |
| Engineer | Sameer Ghorpade | CA/92/15358 |
| Architect | Sameer Ghorpade | CA/92/15358 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- RAJENDRA PRASAD WARD- 46, RAIPUR (C.G.)
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2289521, 81.6658744 View on Map
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | shiva prime | Raipur | Ongoing | 0.08 km |
| 2 | SAI SHARDHA | Raipur | Ongoing | 0.28 km |
| 3 | wallfort omega | Raipur | New | 0.49 km |
| 4 | CHANDRA SPHINX | Raipur | Ongoing | 0.55 km |
| 5 | OM RAJ ENCLAVE | Raipur | Ongoing | 0.60 km |
| 6 | SPARSH SQUARE | Raipur | Ongoing | 0.61 km |
| 7 | MADHURIMA APARTMENT | Raipur | New | 0.71 km |
| 8 | sai twins | Raipur | New | 0.77 km |
| 9 | ATLANTIS | Raipur | Ongoing | 0.85 km |
| 10 | AADINATH VATIKA | Raipur | New | 0.88 km |
| 11 | AVENUE - 144 | Raipur | Ongoing | 0.92 km |
| 12 | shreeji vaishali | Raipur | Ongoing | 0.92 km |
| 13 | shreeji vaishali | Raipur | Ongoing | 0.92 km |
| 14 | shreeji vaishali | Raipur | Ongoing | 0.93 km |
| 15 | sai vista | Raipur | Ongoing | 0.94 km |
| 16 | shiva enclave | Raipur | New | 0.96 km |
| 17 | M/S SHIVNATH APARTMENTS | Raipur | New | 0.96 km |
| 18 | VARDHMAN SKYLINE - RAIPUR | Raipur | Ongoing | 0.99 km |
| 19 | chandra icon | Raipur | New | 1.00 km |
| 20 | PMAY OF 160 (DUS) AT PURAINA RAIPUR | Raipur | Ongoing | 1.02 km |
| 21 | oxygen | Raipur | New | 1.03 km |
| 22 | SAI SILVER | Raipur | New | 1.04 km |
| 23 | GOLDEN SKY | Raipur | Ongoing | 1.05 km |
| 24 | MAY FAIR | Raipur | Ongoing | 1.06 km |
| 25 | ASHOKA IKON PHASE -3 | Raipur | New | 1.11 km |
| 26 | chandra planet | Raipur | Ongoing | 1.14 km |
| 27 | GOLDEN TOWER | Raipur | Ongoing | 1.17 km |
| 28 | samta parisar | Raipur | Ongoing | 1.19 km |
| 29 | ASHOKA ROYAL A&B | Raipur | Ongoing | 1.21 km |
| 30 | ARORA TOWER | Raipur | Ongoing | 1.30 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA050718000469
-
Approved Building / Sanction Plan AvailableBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate AvailableRequired if land was converted from agricultural to non-agricultural use.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.92 kmDunda Talab ≤3 kmPond · 50m buffer
-
1.07 kmKhamhardih Nala ≤3 kmDrain · 20m buffer
-
1.33 kmTelibandha Talab (Marine Drive) ≤3 kmLake · 50m buffer
-
1.4 kmTelibandha Nala ≤3 kmNala · 20m buffer
-
1.83 kmKharun Left Bank Canal ≤3 kmCanal · 20m buffer
-
1.94 kmShankar Nagar Nala ≤3 kmNala · 20m buffer
-
1.97 kmMuktangan Talab ≤3 kmTank · 50m buffer
-
2.27 kmPandri Talab ≤3 kmTank · 50m buffer
-
4.2 kmSLRM Centre Tendua (Tundra) 3–5 kmWaste processing · 200m buffer
-
9.29 kmSwami Vivekananda Airport 5–10 kmRPR / VARP · DGCA height limits apply
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!