Eighteen environmental, infrastructure and amenity parameters for the nearest mapped area (Telibandha — 0.38 km from this project). Click any parameter for the underlying readings, thresholds and what they mean.
🏠 Livability Parameters
Latest readings for Telibandha. Only parameters with available data are shown below. Based on the latest readings for Telibandha.
🌬️ Air Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| PM2.5 | 43.8 µg/m³ | ≤ 40 |
Concern
|
| PM10 | 58.6 µg/m³ | ≤ 60 |
Good
|
| NO₂ | 37.7 µg/m³ | ≤ 40 |
Good
|
💧 Water Quality
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| TDS | 344 ppm | ≤ 500 |
Good
|
| Fluoride | 0.77 mg/L | ≤ 1.0 |
Good
|
| Turbidity | 2.8 NTU | ≤ 1 |
Concern
|
🧹 Sanitation
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| ODF Status | ODF+ | ODF++ |
Info
|
| Sewage Coverage | 45% | ≥ 80% |
Concern
|
| Drainage Coverage | 58% | ≥ 90% |
Concern
|
🛣️ Infrastructure
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up (LULC) | 75.2% | 40-70% |
Contextual
|
| Impervious Surface | 37.0% | < 70% |
Good
|
| NDVI Mean | 0.230 | > 0.3 |
Concern
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up (LULC) % | 82.5% | 67.9% | 75.2% |
| Tree Cover % | 7.9% | 13.4% | 10.7% |
| Urbanization Index | 100.0 | 99.0 | 99.5 |
| Infra Score | 80.0 | 81.0 | 81.0 |
🏥 Amenities
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Hospitals (500m) | 1 | ≥1 |
Good
|
| Schools (1km) | 3 | ≥3 |
Good
|
| Markets (1km) | 5 | ≥1 |
Good
|
🌳 Green Cover
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| NDVI Mean | 0.217 | 0.5 maps to score 100 |
Weighted 40%
|
| Vegetation % | 27.4% | Direct % (cap 100) |
Weighted 30%
|
| Dense Green % | 11.0% | Scaled from 50% |
Weighted 20%
|
| Parks within 500m | 0 | Count * 33 (cap 100) |
Weighted 10%
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| NDVI Mean | 0.172 | 0.262 | 0.217 |
| Vegetation % | 19.4% | 35.4% | 27.4% |
| Dense Green % | 8.0% | 14.1% | 11.0% |
| Tree Canopy % | 15.6% | 19.2% | 17.4% |
| Green Score | 22.8 | 37.2 | 30.0 |
🔊 Noise
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Day Noise | 53.5 dB | ≤ 65.0 dB |
Good
|
| Night Noise | 48.3 dB | ≤ 55.0 dB |
Good
|
| Nearest Highway | 888 m | Higher usually quieter |
Info
|
🌊 Flood Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Overall Risk | High | Low preferred |
Info
|
| River Flood Risk | Medium | Low preferred |
Info
|
| Waterlogging Risk | High | Low preferred |
Info
|
🏚️ Earthquake Risk
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Seismic Zone | Zone II | II preferred |
Info
|
| Risk Level | Low | Low preferred |
Info
|
| PGA (475yr) | 0.0155g | Lower preferred |
Info
|
🌡️ Land Surface Temp
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| LST Mean | 30.0°C | 20°C best / 45°C worst |
Weighted by formula
|
| LST Score | 59.9 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| LST Mean (°C) | 30.2 | 29.9 | 30.0 |
| LST Min (°C) | 9.9 | 10.2 | 10.0 |
| LST Max (°C) | 40.7 | 40.5 | 40.6 |
| LST Score | 59.3 | 60.5 | 59.9 |
🏗️ Built-up Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Built-up % | 75.2% | Inverse scoring |
Score = 100 - builtup%
|
| Open Space % | 24.8% | Context |
Info
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Built-up % | 82.5% | 67.9% | 75.2% |
| Open Space % | 17.5% | 32.1% | 24.8% |
| Built-up Score | 17.5 | 32.1 | 24.8 |
💡 Night-time Lights
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Avg Radiance | 31.75 | Scaled to 50 |
Score = min(100, avg/50*100)
|
| NTL Score | 63.5 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Avg Radiance | 33.53 | 29.97 | 31.75 |
| Max Radiance | 51.73 | 46.27 | 49.00 |
| NTL Score | 67.1 | 59.9 | 63.5 |
🏞️ Water Bodies
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Permanent Water % | 70.25% | 70% weight |
Scaled against 10%
|
| Seasonal Water % | 98.15% | 30% weight |
Scaled against 20%
|
| Water Score | 100.0 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Permanent Water % | 75.78% | 64.71% | 70.25% |
| Seasonal Water % | 98.63% | 97.66% | 98.15% |
| Water Score | 100.0 | 100.0 | 100.0 |
👥 Population Density
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Density/km² | 7,120.2 | Inverse scale up to 20,000 |
Lower -> higher score
|
| Score | 64.4 | 0-100 |
Computed
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Population Total | 24,215 | 184,704 | 104,460 |
| Density / km² | 7,707.7 | 6,532.6 | 7,120.2 |
| Pop Density Score | 61.5 | 67.3 | 64.4 |
⛲ Groundwater
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Soil Moisture | 135.489 | 30% weight |
Scaled
|
| Recharge | 0.81 | 25% weight |
Scaled
|
| PDSI | 3.00 | 20% weight |
Scaled
|
| SM Trend | 0.0000 | 15% weight |
Scaled
|
| Precipitation | 1,869.39 | 10% weight |
Scaled
|
| Parameter | 1000m | 3000m | Average (Final) |
|---|---|---|---|
| Soil Moisture | 135.928 | 135.049 | 135.489 |
| Recharge Estimate | 0.66 | 0.96 | 0.81 |
| PDSI | 2.99 | 3.01 | 3.00 |
| Groundwater Score | 63.7 | 63.7 | 63.7 |
🌧️ Waterlogging
| Parameter | Value | Target | Status |
|---|---|---|---|
| Avg Susceptibility | 53.8 | < 40 |
Concern
|
| Avg Slope | 2.88° | > 1° |
Good
|
| Avg Impervious | 85.3% | < 70% |
Concern
|
🚶 Walkability & Safety
| Parameter | Value | Target / Rule | Status |
|---|---|---|---|
| Footpaths (500m) | 0 | ≥ 3 |
Concern
|
| Sidewalk Roads (1km) | 0 | ≥ 5 |
Concern
|
| Nearest Police Station | — m | ≤ 2000m |
Context
|
⚠️ Risk Factors
| Category | Risk | Distance / Severity | Meaning |
|---|---|---|---|
| Water_drainage | Telibandha Lake Overflow Zone | 200 m / Medium | Low-lying area near lake prone to waterlogging during heavy monsoon rains |
| Air_pollution | VIP Road Traffic Congestion | 300 m / Medium | Heavy vehicular traffic on VIP Road near Magneto Mall |
| Environmental | Nallah near Telibandha Lake | 350 m / Medium | Open drain connecting to Telibandha lake carrying untreated storm water |
| Health_nuisance | Seasonal Mosquito Breeding - Lake Edge | 150 m / Low | Stagnant water pockets near Telibandha lake perimeter in post-monsoon |
| Infrastructure | Intermittent Power Issues - Telibandha East | 600 m / Low | Occasional power fluctuations in older Telibandha colony |
Compliance Status
RERA registration, filings, and compliance flags based on public CG-RERA records.
Details
Registration, professional team, bank, promoters, and compliance history.
- RERA Number
- PCGRERA210819001026
- Status
- New
- Project Type
- Commercial Development
- Approved Date
- 21 Aug 2019
- Original End Date
- 20 Feb 2024
- EWS Category
- NO
- Construction Cost
- ₹ 74600000
- Land Cost
- ₹ 36686000
- Proposed Completion
- 20 Nov 2025
- Authorised Person
- satpal singh gandhi
| Role | Name | License / Membership |
|---|---|---|
| Statutory CA | CA Vimal Agrawal | 426296 |
| Quarterly CA | Nitish Agrawal | 428873 |
| Engineer | YOGESH KUMAR BANI | 848/2017 |
| Architect | VIJAY PRAKASH KHANDE | 609/2013 |
Buildings & Units
Inventory overview, sold/unsold breakdown, and building details.
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2025-10-01 – 2025-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2025-07-01 – 2025-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2025-04-01 – 2025-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2025-01-01 – 2025-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2024-10-01 – 2024-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2024-07-01 – 2024-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2024-04-01 – 2024-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2024-01-01 – 2024-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2023-10-01 – 2023-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2023-07-01 – 2023-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2023-04-01 – 2023-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2023-01-01 – 2023-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2022-10-01 – 2022-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2022-07-01 – 2022-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2022-04-01 – 2022-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2022-01-01 – 2022-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2021-10-01 – 2021-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2021-07-01 – 2021-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2021-04-01 – 2021-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2021-01-01 – 2021-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2020-10-01 – 2020-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2020-07-01 – 2020-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2020-04-01 – 2020-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2020-01-01 – 2020-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2019-10-01 – 2019-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2019-08-21 – 2019-09-30 | 0 | 0 | 0 | 0 | 0 |
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2025-10-01 – 2025-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2025-07-01 – 2025-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2025-04-01 – 2025-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2025-01-01 – 2025-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2024-10-01 – 2024-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2024-07-01 – 2024-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2024-04-01 – 2024-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2024-01-01 – 2024-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2023-10-01 – 2023-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2023-07-01 – 2023-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2023-04-01 – 2023-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2023-01-01 – 2023-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2022-10-01 – 2022-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2022-07-01 – 2022-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2022-04-01 – 2022-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2022-01-01 – 2022-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2021-10-01 – 2021-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2021-07-01 – 2021-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2021-04-01 – 2021-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2021-01-01 – 2021-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2020-10-01 – 2020-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2020-07-01 – 2020-09-30 | 0 | 0 | 0 | 0 | 0 |
| 2020-04-01 – 2020-06-30 | 0 | 0 | 0 | 0 | 0 |
| 2020-01-01 – 2020-03-31 | 0 | 0 | 0 | 0 | 0 |
| 2019-10-01 – 2019-12-31 | 0 | 0 | 0 | 0 | 0 |
| 2019-08-21 – 2019-09-30 | 0 | 0 | 0 | 0 | 0 |
| Period | Total | Sold (prev) | Sold (qtr) | Remaining | Mortgage |
|---|---|---|---|---|---|
| 2025-10-01 – 2025-12-31 | 76 | 45 | 0 | 31 | 0 |
| 2025-07-01 – 2025-09-30 | 76 | 36 | 9 | 31 | 0 |
| 2025-04-01 – 2025-06-30 | 75 | 35 | 1 | 39 | 0 |
| 2025-01-01 – 2025-03-31 | 75 | 35 | 1 | 40 | 0 |
| 2024-10-01 – 2024-12-31 | 75 | 33 | 2 | 40 | 0 |
| 2024-07-01 – 2024-09-30 | 75 | 32 | 1 | 42 | 0 |
| 2024-04-01 – 2024-06-30 | 75 | 32 | 0 | 43 | 0 |
| 2024-01-01 – 2024-03-31 | 75 | 31 | 1 | 43 | 0 |
| 2023-10-01 – 2023-12-31 | 71 | 26 | 5 | 40 | 0 |
| 2023-07-01 – 2023-09-30 | 71 | 25 | 1 | 45 | 0 |
| 2023-04-01 – 2023-06-30 | 71 | 27 | 0 | 46 | 0 |
| 2023-01-01 – 2023-03-31 | 71 | 24 | 3 | 44 | 0 |
| 2022-10-01 – 2022-12-31 | 71 | 23 | 1 | 47 | 0 |
| 2022-07-01 – 2022-09-30 | 71 | 22 | 1 | 48 | 0 |
| 2022-04-01 – 2022-06-30 | 71 | 20 | 2 | 49 | 0 |
| 2022-01-01 – 2022-03-31 | 71 | 20 | 0 | 51 | 0 |
| 2021-10-01 – 2021-12-31 | 71 | 14 | 6 | 51 | 0 |
| 2021-07-01 – 2021-09-30 | 71 | 14 | 0 | 57 | 0 |
| 2021-04-01 – 2021-06-30 | 71 | 14 | 0 | 57 | 0 |
| 2021-01-01 – 2021-03-31 | 71 | 11 | 3 | 57 | 0 |
| 2020-10-01 – 2020-12-31 | 71 | 5 | 8 | 59 | 0 |
| 2020-07-01 – 2020-09-30 | 71 | 0 | 5 | 67 | 0 |
| 2020-04-01 – 2020-06-30 | 71 | 0 | 0 | 71 | 0 |
| 2020-01-01 – 2020-03-31 | 71 | 0 | 0 | 71 | 0 |
| 2019-10-01 – 2019-12-31 | 71 | 0 | 0 | 71 | 0 |
| 2019-08-21 – 2019-09-30 | 71 | 0 | 0 | 71 | 0 |
Legal Orders & Cases
RERA legal orders, complaints, and case statistics filed against this project.
| Complaint | Applicant | Section | Date | Source | |
|---|---|---|---|---|---|
| No orders found for this project. | |||||
Location
Project address, coordinates, and nearby places.
- Address
- village-telibandha ,tehsil -raipur dist.raipur
- District
- Raipur
- Tehsil
- Raipur
- Coordinates
- 21.2378196, 81.6687895 View on Map
Livability of Telibandha Raipur
Environmental, infrastructure & amenity parameters for the area where this project is located (0.38 km from project). Each value is compared with the Raipur average.
Explore nearby infrastructure around this project. Toggle categories to show/hide on the map.
| # | Project | District | Status | Distance |
|---|---|---|---|---|
| 1 | chandra icon | Raipur | New | 0.21 km |
| 2 | ATLANTIS | Raipur | Ongoing | 0.29 km |
| 3 | SAFFRON CORPORATE | Raipur | New | 0.60 km |
| 4 | SAFFRON COMFORTS | Raipur | New | 0.69 km |
| 5 | ASHOKA IMPRESSION PHASE - 2 | Raipur | Ongoing | 0.70 km |
| 6 | aishwarya residency PHASE - I | Raipur | Ongoing | 0.82 km |
| 7 | SLT WATER FRONT | Raipur | Ongoing | 0.90 km |
| 8 | GOLDEN SANDS | Raipur | Ongoing | 0.93 km |
| 9 | SAI SHARDHA | Raipur | Ongoing | 1.02 km |
| 10 | SAI SIMRAN PURENA | Raipur | Ongoing | 1.03 km |
| 11 | CURRENCY TOWER | Raipur | Ongoing | 1.05 km |
| 12 | shiva prime | Raipur | Ongoing | 1.08 km |
| 13 | GOLDEN SKY | Raipur | Ongoing | 1.15 km |
| 14 | quorum | Raipur | Ongoing | 1.19 km |
| 15 | PMAY OF 160 (DUS) AT PURAINA RAIPUR | Raipur | Ongoing | 1.20 km |
| 16 | OM RAJ ENCLAVE | Raipur | Ongoing | 1.24 km |
| 17 | MOTI MAHAL PALLADIUM | Raipur | Ongoing | 1.25 km |
| 18 | V3 ASHIYANA | Raipur | New | 1.25 km |
| 19 | wallfort omega | Raipur | New | 1.26 km |
| 20 | "SHRIJAN" PREMIUM | Raipur | Ongoing | 1.28 km |
| 21 | CHANDRA SPHINX | Raipur | Ongoing | 1.33 km |
| 22 | Bhardwaj sky phase ii | Raipur | New | 1.37 km |
| 23 | SPARSH SQUARE | Raipur | Ongoing | 1.38 km |
| 24 | sai twins | Raipur | New | 1.39 km |
| 25 | ishita pardise | Raipur | Ongoing | 1.40 km |
| 26 | SAMRIDDHI ATLANTIS PHASE-2 | Raipur | New | 1.43 km |
| 27 | avinash elegance | Raipur | New | 1.45 km |
| 28 | bhardwaj sky | Raipur | New | 1.45 km |
| 29 | Samriddhi atlantis | Raipur | New | 1.49 km |
| 30 | shiva enclave | Raipur | New | 1.50 km |
Buyer Checklist
Documents and verifications a buyer should review before purchase.
Buyer Document Verification Checklist
Key documents a buyer should verify before purchasing in this project. Items marked Available have data on Seemankan.
-
RERA Registration Certificate AvailableConfirms the project is registered with RERA CG. Verify registration number, validity dates, and project details on the RERA portal.RERA No: PCGRERA210819001026
-
Approved Building / Sanction Plan Verify IndependentlyBuilding plan sanctioned by the local authority. Verify floor count, setbacks, and FSI compliance.
-
Layout Plan AvailableApproved layout showing plot divisions, roads, open spaces, and common areas.
-
Title Deed / Ownership Proof AvailableProof that the promoter legally owns the land. Verify via Sub-Registrar records.
-
Encumbrance Certificate AvailableConfirms the property is free from legal dues, mortgages, or liens. Obtain from Sub-Registrar office.
-
Land Use / Diversion Certificate Verify IndependentlyRequired if land was converted from agricultural to non-agricultural use.
-
Commencement Certificate Verify IndependentlyPermission to begin construction issued by the local authority after plan approval.
-
NOCs (No Objection Certificates) Verify IndependentlyNOCs from fire department, environment, water supply, electricity board, and other authorities.
-
RERA Compliance Orders Verify IndependentlyCheck if any orders, penalties, or directions have been issued against this project by RERA.
Risk Zone Within 5 km
Buffer zones (water bodies, airport restrictions) and risk sites (landfills, waste processing) detected within 3 km (immediate) and 5 km (extended) of the project.
-
0.79 kmTelibandha Nala ≤3 kmNala · 20m buffer
-
0.81 kmKharun Left Bank Canal ≤3 kmCanal · 20m buffer
-
1.02 kmTelibandha Talab (Marine Drive) ≤3 kmLake · 50m buffer
-
1.56 kmMuktangan Talab ≤3 kmTank · 50m buffer
-
1.6 kmDunda Talab ≤3 kmPond · 50m buffer
-
1.97 kmKharun River ≤3 kmRiver · 75m buffer
-
2.02 kmHeerapur Talab ≤3 kmPond · 50m buffer
-
2.1 kmKhamhardih Nala ≤3 kmDrain · 20m buffer
-
3.22 kmSLRM Centre Tendua (Tundra) 3–5 kmWaste processing · 200m buffer
-
4.49 kmDaldal Seoni MSW Transfer Station 3–5 kmTransfer station · 100m buffer
-
9.67 kmSwami Vivekananda Airport 5–10 kmRPR / VARP · DGCA height limits apply
Documents
RERA-filed documents and disclosures available for this project.
AMOUNT (51)
APARTMENTPHOTO (162)
ARCH (31)
Ann19 (4)
BOROUCHRE (24)
BRIEF (1)
CA (28)
COLONIZER (1)
Demarcation (1)
ENGG (31)
ENUM (1)
FEESHEET (1)
LAYOUT (1)
PASSBOOK (1)
PHOTO (1)
PSPEC (1)
Reg (1)
SEARCH (1)
SELF (1)
TAC (1)
other (4)
Reviews
Verified buyer reviews and ratings for this project.
No reviews yet. Be the first to review this project!